Commissioning packs, identical hardware batches, training material, phased delivery and on-site engineering backup — built for crews paid to finish sites, not diagnose products.
Installers working multi-site projects — low-voltage and security integrators, fire-and-security dealers, facilities rollout crews — face a different problem than a locksmith on a service call: hundreds of openings must be commissioned identically against a schedule. The installer program is built for that. Hardware ships in identical, project-identified batches so one install procedure works across floors; commissioning packs cover mechanical fit, credential and app/gateway provisioning, and sign-off testing; training material supports crew onboarding; and delivery is phased to site milestones. When a site raises a question the crew cannot answer, it escalates with model and batch data to engineering instead of stalling the punch list. This page describes the rollout-oriented program; single-unit trade work is covered under the locksmith program.
| Identical project batches | One SKU/firmware configuration per site batch, with batch identification so provisioning steps do not vary unit to unit |
| Commissioning pack | Mechanical install, reset/provisioning, gateway or encoder setup and a sign-off test sheet per lock type |
| Crew training | Install and troubleshooting documentation for onboarding multiple crews, with sample units for hands-on familiarization |
| Phased delivery | Shipments aligned to building handover milestones so hardware is on the right floor at the right time |
| Engineering backup | Escalation path for commissioning issues with model, firmware and batch data attached |
| Spares on site | A project spares pack travels with the order to protect the completion date — see support |
| Commercial terms | Project pricing by door count; MOQ and delivery schedule confirmed in writing against the rollout plan |
The hardware overlaps; the job does not. A locksmith typically answers single-door service calls, carries small stock and needs parts for repairs. An installer crew executes scheduled multi-door projects and needs batch consistency, provisioning documentation, training and phased logistics. Using the wrong program is how good locks get blamed for a badly supported rollout.
| Dimension | Locksmith | Installation crew |
|---|---|---|
| Typical work | Single-door service and upgrades | Scheduled multi-site rollouts |
| Batch need | Small varied stock | Identical project batches |
| Documentation | Fitment and service notes | Commissioning and sign-off packs |
| Training | Product knowledge for counter sales | Crew onboarding at scale |
| Logistics | Ad hoc orders | Phased delivery to milestones |
| Escalation | Per-call support | Project-tracked engineering backup |
| Start page | Locksmith program | This page |
Yes — phased delivery is standard for rollout work. The project quotation lists shipment phases against site milestones so the correct SKUs, credentials and spares are on site when each zone opens for installation. Logistics details describe the export stages.
By shipping one SKU and firmware configuration as an identified project batch and providing a commissioning sheet for provisioning steps. Crew leads run sample units before the main batch, and any running change to the model would be notified before further units ship.
Install steps, provisioning guides, a sign-off test sheet and troubleshooting material aligned to the exact project SKUs, plus sample units for hands-on crew familiarization. For larger rollouts, remote setup sessions can be scheduled for crew leads.
The project spares pack covers immediate swaps so the schedule continues, while the fault is escalated with model, firmware and batch data through the sales engineer. Recurring patterns trigger an engineering review rather than repeated ad hoc fixes.
Only lock hardware listed as compatible with the rated door assembly may be used, or the door's fire rating is affected. Fire-rated openings must be flagged in the door schedule at tender stage so the quoted hardware is appropriate — the standards hub explains the rating logic.
Send door counts, site phases and timeline — receive a project BOM, commissioning plan and phased delivery quote.