Last updated: October 31, 2026 · Reviewed by export engineering
A quotation from this desk is a document, not a chat reply. It states the unit price at your stated quantity, the MOQ policy in writing, the lead-time basis, the packaging specification, the document list for each named model and the validity period of the offer. Nothing is charged for a quotation, and nothing is negotiated from a template price.
Before anything is priced, the desk scores the request against three levels. Most delays are caused by one missing field the buyer already knows.
| Level | What you have supplied | What we can return | What is still missing |
|---|---|---|---|
| A – quote-ready | Model code or feature list, door type and thickness (38 mm and 45 mm are the common hotel figures), quantity split of trial versus repeat, destination country, branding scope, documents required, Incoterm and port. | A written quotation with the unit price per quantity tier, MOQ policy, lead-time basis, packaging specification and document list. | Nothing material; the offer is issued once the engineer signs off the configuration. |
| B – needs one clarification | Model or family named and quantity stated, but one field is open: no door photo, no port, or branding described in words only. | A provisional quotation marked subject to one open item, with the price basis shown so you can see what the missing field changes. | The single open field, named in the reply; it usually affects one cost line. |
| C – cannot be quoted yet | A photo of a competitor lock, a brand name, or a quantity range such as one container or about 200 rooms. | A shortlist of 2 or 3 existing models and a request for the minimum input set, with the reason each field is required. | Everything in the A row; no price is built on a guess. |
Most delays in quoting come from missing information, not from the factory being busy. Send the items below and the quotation arrives with model numbers, tooling assumptions, lead time and a document list attached.
What to sendA clear request produces a quotation you can actually compare.A quotation is a set of decisions, not one number. Each input moves a specific part of the document.
| Buyer input | What it changes in the quotation | Example |
|---|---|---|
| Model choice | The base configuration, credential type and document list. | SLK-2020, a 201 stainless steel body measuring 306 x 75 x 15 mm, against SLK-760 changes the mortise, encoder link and documents named. |
| Quantity | The unit price tier and the MOQ check. | A trial of 2 pcs and a repeat of 100 pcs are priced as different tiers; the trial line states whether its price carries forward. |
| Finish | A separate production run and packing line. | A second finish inside one order adds a run changeover, so it is quoted as its own line. |
| Packaging | Carton specification, label artwork and manual language. | Neutral cartons in one language differ from branded cartons with barcodes and a manual in 2 languages. |
| Certification documents | Whether the model reuses an existing file or needs a delta review. | A lock ordered under its original model code can share its test report; a new model code starts a compliance review, quoted separately. |
| Incoterm and port | The logistics basis and who pays what after the factory gate. | EXW Shenzhen, FOB Shenzhen, CIF to a named port and DDP to a named address produce four different totals. |
| Payment terms | The number of settlement lines in the offer. | A deposit-and-balance structure appears as 2 lines; terms are confirmed per order, never assumed. |
If an item is not written in the document, ask before you sign.
Bulk pricing tiers by model family
Trial quantities before a full container
Supplier checks you can repeat on your own
Cloud and offline control architecture quoted separately
Door type drives the mortise and spindle choice
Radio platform selected before the quotation is issuedFour roles read the same message, and each one can send it back.
Paste the model list, quantity split, door details and destination market into one message. Door photos are read by the engineer who answers.
Paste your model list, quantities, door details and destination market. The form goes straight to the quotation desk and the product engineer.
Caitian Garden, Caitian Road, Futian District, Shenzhen, China
Each return is fixable in the same email that carried the original request.
| Reason | What it looks like | Fastest fix |
|---|---|---|
| No quantity split | How much for 500 pcs, with no trial quantity and no repeat volume. | Send 2 numbers: the trial quantity and the expected repeat quantity, even when the repeat is an estimate. |
| No door information | Hotel doors, standard. | Send door thickness in mm, door material, edge height and one photo of the door edge with the existing lock visible. |
| Branding scope unclear | Put our logo on it. | Name which branding layers apply: logo on the lock, label, manual, carton, software name or a new model code. |
| Destination market not stated | Ship to Europe. | Name the country; radio approval, plug, battery and document requirements differ by market. |
The Incoterm decides where our responsibility stops and where yours begins. Choose it before asking for a total.
| Incoterm | Who arranges main carriage | Who pays insurance | Typical use |
|---|---|---|---|
| EXW | Buyer | Buyer | You have a forwarder in Shenzhen and collect at the factory gate. |
| FOB | Buyer, after the goods are loaded on board at the named port | Buyer | The common default for container orders; you control freight, and duty is yours. |
| CIF | Seller | Seller, at minimum cover to the named port | One price to a port, with import clearance and duty handled by you. |
| DDP | Seller | Seller | Only where we can support the destination; quoted per named address, never per country. |
The boundary is part of the offer, not a negotiation position.
Because unit price is a function of model, finish, packaging, quantity and document work, not of a category. A list would be accurate for one configuration and misleading for every other. The written quotation is the price.
Model or feature list, quantity split, door type and thickness in mm, destination country, branding scope, documents required, Incoterm plus port. Seven fields; with all seven the request reaches level A. With five or six it returns for one clarification.
Only when the quotation says so. A trial of 2 pcs and a repeat of 100 pcs sit at different tiers, and the trial may carry setup or packaging costs that do not repeat. The offer states whether the trial price is credited, held or replaced.
Where we can support the destination and the address. DDP is quoted per named address because duty, import VAT and local delivery differ by city. Under FOB or CIF the duty stays with you.
Each quotation prints its own validity period and expiry date. We do not hold an offer open indefinitely, because material and freight costs move. When the period ends, ask for a refresh and the desk re-checks cost.
The offer carries a document list per model: test reports, declarations and label artwork that exist today, with pending items named as pending. Full copies come as the document pack for the named model. The testing lab page explains how preparation is handled.
Use the seven fields, add a door photo if the opening is unusual, and the desk can move the request to level A in one pass. Sample orders, catalog requests and OEM questions reach the same team; compliance documents, installation support and project management cover what follows.
Request a QuoteOrder a Sample First