
Build-to-spec production for brands and project owners: managed assembly lines, end-of-line testing, audit documentation and capacity planning — with NDAs, quality agreements and schedules in place before volume.
Contract manufacturing means the factory builds your product — to your design, brand and quality plan — while you keep product ownership and the customer relationship. It differs from ODM, where the manufacturer also designs the product, and from wholesale, where you buy existing catalog models. Contract production is governed by three documents: a manufacturing agreement, an NDA covering drawings and bills of materials, and a quality agreement defining inspections and acceptance criteria. Capacity, line allocation, spares and audit rights are agreed before the first production order, and pricing is quoted against the approved BOM and forecast rather than as a generic unit price.
| Engagement model | Build-to-spec / build-to-print assembly of the customer's smart lock product on managed factory lines |
| Inputs from customer | Approved drawings and BOM, firmware source or provisioning rights, quality standards, packaging specification and volume forecast |
| Factory provides | Production lines and operators, assembly tooling and test jigs, incoming and in-process QC, end-of-line testing, warehousing and export handling |
| Governance | NDA, manufacturing agreement and quality agreement; agreed acceptance criteria, inspection points and non-conformance handling before volume |
| Audit support | Company documentation, scheduled live video tours, on-site or third-party audits, and line/QC evidence shared under confidentiality |
| Capacity planning | Line allocation and lead times planned against a rolling forecast; ramp and contingency discussed in the agreement |
| IP position | Customer designs and tooling terms handled by contract; factory platform elements used in the product are licensed as specified |
The three models are confused constantly, and the wrong label in an NDA causes real disputes. In wholesale the product is the factory's; in ODM the factory develops the product with you; in contract manufacturing the product is yours and the factory is a production capacity provider with defined quality obligations.
| Dimension | Contract manufacturing | ODM | Wholesale |
|---|---|---|---|
| Who designs | Customer (design is supplied) | Factory, with customer brief | Factory catalog |
| Brand on product | Customer brand | Customer brand | Neutral or optional logo |
| BOM ownership | Customer-approved BOM | Joint per agreement | Factory BOM |
| Quality plan | Customer standards + factory QC | Factory system, agreed gates | Factory standard |
| Audit rights | Contractually defined | Project-based | Inspection by arrangement |
| Best fit | Brands with mature product needing capacity | Brands needing a new product | Resellers of proven SKUs |
| Start page | This page | ODM manufacturer | Wholesale |
Customer-supplied or factory-sourced components checked against the approved BOM before they reach a line.
Managed workstations with assembly tooling and fixtures set up for the product's build sequence.
Per-unit function, latch, keypad, recognition and wireless checks per the agreed test plan.
Inspection points, AQL references, non-conformance handling and batch records agreed in advance.
Scheduled video walk-throughs and on-site or third-party audits against an agreed checklist.
Finished-goods warehousing, documentation and freight coordination against the shipment schedule.
Yes, that is contract manufacturing: your drawings, approved BOM and quality standards are reviewed under NDA, validated with a trial build, and then produced on managed lines under a manufacturing and quality agreement. Start by sharing the technical package through the production review form.
An NDA is signed before drawings or BOMs are exchanged, and IP ownership — including tooling and any factory platform elements used in the product — is defined in the manufacturing agreement. Access to customer documentation is limited to the engineering and production staff assigned to the program.
Yes. Audit rights and inspection points are written into the quality agreement, including scheduled live video walk-throughs, on-site audits where practical and third-party pre-shipment inspection against your checklist. See the factory tour and quality control pages.
Against the approved BOM, labor and test content, packaging and forecast volume — not as a catalog price. Component price movements and volume tiers are addressed in the agreement, and current terms are always confirmed in writing.
Firmware provisioning is part of the build plan: source or provisioning rights, version control and post-load verification are defined in the technical package and quality plan, so every shipped unit carries the approved release. The same approach applies to app ecosystem provisioning.
Share the technical package under NDA — receive a manufacturability review, trial-build plan and contract terms in writing.
Request a production reviewCompany overviewLast updated: October 31, 2026 · Reviewed by the Smart Lock Factory editorial team