
Tender documentation, model-specific compliance files, project BOMs, audit-friendly batch records and phased delivery for public housing, public buildings, schools and healthcare facilities.
Public-sector procurement is a documentation and audit problem first, a hardware purchase second. Evaluation committees cannot reward private assurances; they score evidence that arrives with the bid: model names matched to standards, certificates issued to those exact models, factory identity they can verify, batch records they can inspect, and warranty terms written for an asset lifecycle rather than a retail counter. The government supply program is organized around that reality: a tender documentation pack for covered SKUs, model-specific certification files, supplier-verification materials, phased delivery aligned to budget and construction milestones, and spares planning for the maintenance authority. We do not publish unverifiable lists of government clients; current procurement policy, terms and the document set for your jurisdiction are confirmed in writing per inquiry.
| Tender pack | Datasheets, specification text, standards references, drawings and document lists for covered SKUs, structured for procurement submissions |
| Compliance evidence | Model-specific certificate and test-report files matched to your destination market — see certifications; blanket claims are never substituted for files |
| Supplier verification | Business registration details, factory address, live video walk-through and third-party inspection support — follow the verification checklist |
| Project BOM | Door-by-door quantities across offices, common areas, plant rooms and external gates, with credentials and spares lines — see configurations hub |
| Data governance | Offline models keep credentials on the lock; connected models carry a per-SKU data-flow description for privacy review — state your jurisdiction's requirements |
| Inspection & audit | End-of-line batch records and third-party or authority inspection access at agreed stages — see quality control |
| Lifecycle support | Warranty handling, maintenance spares packs and engineering escalation written against handover, with term and response path per contract |
| Commercials | Pricing, MOQ, delivery phases and payment terms per formal quotation and contract; contact us for the current policy on public-sector orders |
A well-written requirement protects the evaluation committee: each line names the evidence expected, so a bid cannot win on a brand logo or a generic “CE compliant” statement and lose at acceptance. The table below turns the usual evaluation criteria into document requests and red flags.
| Tender requirement | Evidence to request | Red flag during evaluation |
|---|---|---|
| Door schedule fit | SKU list matched to door types, thickness, prep and fire-rated openings | One model proposed for every door with no survey |
| Standards & test reports | Issuing-body certificates and reports naming the exact SKUs offered | Blanket certificates for unrelated models, reports unverifiable |
| Supplier identity | Registration records, real factory address, live or on-site visit evidence | Only showroom addresses, refusal of video or inspection |
| Data handling | Per-SKU data-flow description: where credentials and logs reside | “Fully secure” with no architecture description |
| Batch quality | End-of-line records, inspection hold points, defect-rate methodology | No records offered, inspection refused before shipment |
| Spares & warranty | Written warranty term, spares list, response path and maintenance training | Warranty via importer only, no factory escalation path |
| Traceability | Batch/serial marking and carton labeling aligned to asset registers | No way to trace a failed unit back to its batch |
Specification text, datasheets and file indexes are written for evaluators, not adapted from retail brochures.
Certificates and reports are matched to the exact SKUs offered, so they survive scrutiny at acceptance.
A real production site, open to video walk-throughs, visits and independent inspection under agreed arrangements.
Offline and connected architectures documented per SKU, supporting privacy and security review without guesswork.
Production and shipment phases scheduled around fiscal-year, construction and handover milestones in writing.
Maintenance packs, traceable batch marking and a documented claim path for the authority's facilities team.
Yes, for covered SKUs: datasheets, specification text, standards references, model-specific certificate files and company verification materials. Send the tender document list with your inquiry and the pack is assembled against its exact clauses rather than as a generic brochure.
Rather than claim every standard, we provide the certificate files for covered models matched to your destination market and requirement. If a tendered model needs additional testing, that is identified before bid submission, with scope and schedule confirmed in writing.
Yes. Live video walk-throughs can be scheduled early, and third-party or authority inspections at defined production stages are accommodated under arrangements written into the contract — see the quality control and verification pages.
Offline models store credentials on the lock itself; connected models expose data through their chosen ecosystem. Because data flow is SKU-specific, each tendered model carries a data-flow description for the authority's privacy review rather than one blanket security statement.
Yes. Phased production and shipment against block, floor or budget milestones is standard on public projects. The phases, quantities and credentials-per-phase are written into the contract so each acceptance point receives a complete, labeled delivery.
Door schedules, required standards and delivery milestones in — a documentation index, draft BOM and written terms back.
Submit tender requirementsVerify our factory firstLast updated: October 31, 2026 · Reviewed by the Smart Lock Factory editorial team