Project hardware releases go wrong in predictable ways: the order line carries a model code, but the door survey, the credential scope, the carton arithmetic and the dated documents never got attached to it. This memo is the working version of the slk 9951th purchase order checklist for project orders, drawn from the catalogue record for the SLK-9951TH RFID hotel electronic door lock. It is written for the procurement manager who signs the release, while the door survey and the finish sample are still open.
Direct answer. The one-line answer — slk 9951th purchase order checklist for project orders is the working record for slk 9951th purchase order checklist for project orders. slk 9951th purchase order checklist for project orders is worthless until slk-9951th is attached to it as evidence. A slk 9951th purchase order checklist for project orders treats one component on its own terms. slk 9951th purchase order checklist for project orders names the tests that close it. slk 9951th purchase order checklist for project orders is not accepted on a headline figure.
Memo header — slk 9951th purchase order checklist for project orders
| Field | Entry |
|---|---|
| To | Procurement manager; site installer lead |
| Subject | RFID hotel lock order review, slk-9951th project order checklist |
| Source | Catalogue entry for SLK-9951TH, filed under the model token slk-9951th |
| Decision owner | Procurement manager, on the installer lead's door-fit confirmation |
This sheet is not the quotation, the sample approval or the signed record. It is the checklist those three are checked against.
What the catalogue record fixes
The catalogue entry is short enough to read in a minute and specific enough to act on, if you read it as a dated record.
| Field | Catalogue record | Order consequence |
|---|---|---|
| Access | RFID/IC card standard; mechanical override standard | Day-one credential types |
| Platform | Hotel lock management software, PC encoder plus guest cards | Encoder, cards, software as line items |
| Network | Standalone lock; PC-linked card encoder, no in-room network required | PC room into commissioning |
| Functions | Guest card issuance, floor and room permissions, check-in validity windows, unlock records | Permission rules and audit trail |
| Body | Stainless steel and alloy, heavy-duty ANSI style | Fixing standard on site |
| Cylinder | 5-pin high-security profile cylinder | Key schedule and blanks |
| Finish | Black with silver edge | The signed sample |
| Power | 4 × AA alkaline batteries | Cell supply and replacement |
| Door fit | Door thickness 34–100 mm; hotel wooden and metal doors | The survey boundary |
| Capacity | Mifare-1 13.56 MHz cards | Card quantities and reissue |
| Environment | No environmental rating recorded for this model | Ask in writing if needed |
Every value above is quoted as the catalogue states it. Confirm on the dated product page for the specific SKU before release and file that dated page with the order, because options and packing can be revised between catalogue versions.
The same question is worked through in more detail in standalone vs connected smart locks. That is the same question slk 9951th purchase order checklist for project orders has to answer here.
The release checklist
This is the slk 9951th purchase order checklist for project orders, cut down to the nine items a procurement manager can close before payment.
- Door fit. Confirm door thickness sits inside 34–100 mm on hotel wooden or metal doors; keep a marked-up schedule.
- Credential scope. Name the encoder count, card stock and software build as order lines.
- Keying. Confirm the 5-pin high-security profile cylinder, override keys and blanks.
- Power. The record shows 4 × AA alkaline batteries.
- Finish. Approve a physical sample in the ordered finish; a custom finish needs its own sample.
- Packing. Work the carton arithmetic below against the delivery plan and the store room.
- Documentation. Request dimension drawings, the installation guide and the full datasheet, dated to the release.
- OEM and ODM scope. The record lists custom logo, finish, packaging, manuals and configuration for project orders. Mark which this order takes.
- Commissioning. Name who programs the encoder, issues the first guest cards, trains the desk and hands over records.
Packing and carton arithmetic
| Packing field | Catalogue record |
|---|---|
| Carton dimensions | 445 × 415 × 365 mm |
| Units per export carton | 6 pcs/ctn |
| Gross weight per carton | 19.0 kg |
| Gross weight per unit | About 3.2 kg, dividing the two figures above |
| Custom packaging | Available under OEM/ODM; carton figures need re-confirming |
Divide the order quantity by six and round the part carton up rather than hoping for a tight floor count. Where the order takes custom packaging, carton dimensions, units per carton and gross weight are no longer the catalogue figures, so re-confirm them on the dated product page for the specific SKU before the packing list is signed.
For the measurement side of this, see smart lock offline vs online architecture. That is the same question slk 9951th purchase order checklist for project orders has to answer here.
Release or hold
One table decides the release. Each row needs an answer in writing before the order goes out.
| Decision point | Release when | Hold when |
|---|---|---|
| Door fit | Every scheduled door measures inside 34–100 mm | A door falls outside the range or door type |
| Credentials | Encoder, cards and software build are named lines | Access hardware arrives with no credential package |
| Packing | Cartons, shelf weight and delivery plan agree | Custom packaging ordered, carton figures stale |
| Finish | Sample signed off in the ordered finish | Sign-off is against a catalogue sample |
| Documentation | Dated drawings, guide and datasheet received | Drawings predate the released configuration |
| Environment | Position is within the recorded door types | The position needs a rating the record does not carry |
How the release moves
flowchart TD
A[Order line drafted] --> B[Door fit survey closed]
B --> C[Credential and keying scope written]
C --> D[Carton arithmetic checked]
D --> E[Dated document pack received]
E --> F{Sample signed off}
F -->|yes| G[Procurement releases the order]
F -->|no| H[Hold and reopen with the factory]
G --> I[Goods receipt and commissioning]
Related reading — slk 9951th
- SLK-9951TH Door Fit and Replacement Notes for Buyers — measurement detail behind checklist item one.
- SLK-9951TH Specifications, Field by Field — the catalogue record unpacked.
- How Credentials and Management Software Work on SLK-9951TH — encoder and card issuance in plain terms.
- Smart Lock Retrofit Site Survey — what changes when the doors are already hung.
CONFIRM-WITH-LOCAL-AUTHORITY: egress and access-control requirements are per-project questions for the authority that signs off in the country of installation; confirm the scope with that authority before release, and keep the written answer with this sheet.
Releasing the order
Keep this hotel lock purchase order checklist and the door fit confirmation for hotel locks in the order file, then send the completed sheet with your request for a quotation so the factory quotes against the specification you intend to release. Ask for finish samples through the order samples route in the same message, and request the catalogue and dated drawing pack to travel with the order rather than after it.