Slk 236 door fit notes: measure door geometry, mortise and panel clearances before ordering SLK-236 smart locks, with a structured bid sheet for site evidence.

Pubblicato il: giu 06, 2023

SLK-236 Fitting Notes: What to Measure Before You Order

SLK-236 Fitting Notes: What to Measure Before You Order

Use this sheet as the technical bid return for the SLK-236 and SLK-236-2. The slk 236 door fit notes below turn a catalogue request into a traceable measurement and acceptance record, so a Procurement Manager can compare supplier responses without treating a product name as proof of door compatibility.

Direct answer. In short, slk 236 door fit notes is the subject of this piece. slk 236 door fit notes is where the work on slk 236 door fit notes sits. slk-236 is what has to be evidenced before anyone signs. A slk 236 door fit notes describes how one component behaves under load. The datasheet makes claims. slk 236 door fit notes is what slk 236 door fit notes can be tested against.

Throughout, slk 236 door fit notes means what slk 236 door fit notes sets out. It is a working definition of slk 236 door fit notes drawn from the evidence below. It is valid for the specific market and product, not as a general claim.

  • Establish the reach — confirm on the dated product page for the specific SKU behind slk 236 door fit notes
  • Establish the edge — record where the technology in slk-236 stops working
  • Establish the reserve — name the mechanical path that remains if slk 236 door fit notes fails
  • This is the sequence slk 236 door fit notes has to follow, anchored on slk 236.

The supplied catalogue records leave the Door fit field blank for both references and identify a No. 2 short hotel mortise plus a 300 × 75 × 15 mm panel. Those catalogue facts do not establish the required door thickness, backset, rebate, faceplate, or keeper geometry. Confirm on the dated product page for the specific SKU, and obtain the applicable dimension drawing, before approving a fit.

Complete one line per opening or door type. The bid may proceed to sample evaluation only when the exact SKU, site measurements, drawing, configuration, and installation assumptions are linked.

1. Lock the commercial model before checking dimensions

Treat the two catalogue records as separate bid lines unless the supplier issues a written configuration identifying which record and version will be supplied. Do not assume that a shared mortise or panel specification makes the names interchangeable.

Use SLK-236: Reading the Published Specification Without Guesswork to check how each published field should be interpreted. The fit worksheet then adds the site evidence missing from a general specification review.

Bid fieldRequired responseEvidence attached
Product referenceWrite SLK-236 or SLK-236-2 exactlySupplier quotation and dated product-page reference
Access versionRecord RFID/IC card, optional passcode version, and mechanical override configurationWritten configuration for the specific SKU
Management versionRecord PC hotel lock management software or TTLock on keypad versions, plus the recorded Bluetooth configurationSoftware and version statement
Listed functionsRecord guest card issuance, floor or room permissions, check-in validity windows, and unlock recordsConfiguration list
FinishState black, silver, or goldFinish sample and order code
Drawing setIssue dimension drawings, installation guide, and full datasheetControlled drawing revision
Installation scopeIdentify supplier guidance, site work, and approval responsibilitySigned responsibility matrix

Treat every catalogue-derived cell as information to verify. If the supplier cannot identify the applicable record, version, drawing revision, and configuration, leave the fit status open.

2. Make the dimension drawing the controlling fit document

Treat the slk 236 door fit notes as a controlled attachment to the exact-SKU drawing. Request the SLK-236 dimension drawing, installation guide, and full datasheet listed in the catalogue’s documentation field, then record their revision and issue date in the bid.

The evidence hierarchy is straightforward: the product page identifies the SKU, the drawing defines what the lock requires, the survey records what the door provides, and the comparison decides whether the two can work together. A catalogue name, photograph, or door schedule cannot replace the missing interface drawing.

flowchart TD
    A[Name exact SKU] --> B[Check dated product page]
    B --> C[Issue controlled drawing]
    C --> D[Measure the opening]
    D --> E[Compare every interface]
    E --> F{All checks pass}
    F -->|Yes| G[Approve fit for sample]
    F -->|No| H[Hold fit and raise query]
Evidence itemWhat it establishesAcceptance rule
Dated product-page referenceThe current record for the named SKURevision recorded
Dimension drawingRequired case, panel, spindle, and faceplate geometryMatches the ordered configuration
Installation guidePermitted installation sequence and adjustment pointsRevision recorded
Full datasheetInterfaces and supplied componentsConfiguration identified
Signed site recordActual dimensions of the openingNo blank mandatory field
Comparison matrixAgreement between drawing and openingEvery interface marked pass or hold

The catalogue states that dimension drawings, an installation guide, and a full datasheet are available on request. If the drawing does not resolve a dimension used in the bid, request clarification rather than accepting a supplier assumption.

3. Complete the smart lock door measurement record

Complete the smart lock door measurement at the actual leaf that will receive the lock. Use millimetres, record the measuring method, and attach a photograph that includes a scale or tape. Record door thickness and backset separately because one value cannot substitute for the other.

MeasurementHow to record itEvidence needed
Door thicknessMeasure the leaf at lock height and at additional representative pointsOverall and local readings
Leading edgeRecord straightness, bevel, contour, and damageClose photograph
Door height and widthMeasure at the lock area without compressing the leafOverall photograph
RebateMeasure width, depth, length, and position on the edgeRebate photograph and section sketch
Faceplate zoneRecord the visible plate area and surrounding constructionFront and edge photographs
Existing cutoutsRecord position, shape, and condition of boreholes or routed areasClose photographs
Handling and swingMark handing, hinge side, and opening directionSimple door plan
Leaf constructionIdentify solid, glazed, metal, composite, or other construction where visibleMaterial note

Measure the thickness of the leaf being fitted rather than a similar door nearby. Record any taper, unevenness, or edge damage because a local condition can affect the panel, case, or faceplate interface even when the overall dimension is acceptable.

The person taking the measurements should sign and date the record. The installer should confirm the method, while the buyer retains the photograph set and marked-up drawing. Do not copy dimensions from a room schedule unless the schedule identifies the exact leaf and records its source.

4. Resolve mortise case and faceplate geometry

The hotel mortise case measurement must be compared with the supplier drawing. The catalogue lists a No.

Define the keypad lock backset using the method shown in that drawing. Record the distance from the leading edge of the door to the applicable centreline, but do not assume the cylinder centreline and spindle centreline are interchangeable unless the drawing states that they are.

InterfaceRecord from the drawing and sitePass condition
Mortise case bodyDepth, width, height, and position within the leafBoth dimensions agree
BacksetDrawing definition and measured door-edge distanceExact comparison recorded
FaceplateWidth, height, projection, and screw-centre positionsPlate position and fixing points match
Spindle and followerSize, length, projection, and engagementCorrect movement and clearance
Latch or bolt featuresType, position, projection, and travel shownNo interference in the closed position
Strike and keeperPlate position, keeper dimensions, and fixing pointsDoor closes fully against the frame

Check the opening for the moving bolt as well as the lock case. A case can fit within the leaf while the bolt still fouls the rebate or keeper. Do not approve the fit from the backset alone, and do not approve reuse of an existing case unless the supplier’s exact-SKU drawing explicitly covers that arrangement.

5. Check panel and operating hardware clearances

For an RFID hotel lock fitting, panel fit is separate from mortise-case fit.

Panel interfaceSurvey or drawing action
Mounting zoneMark the full panel outline and inspect the surrounding door surface
Edge distanceMeasure from the panel outline to the nearest door edge or obstruction
Spindle interfaceCheck follower position, projection, and available movement
Lever or handleRecord handle projection, return path, and clearance from the panel
Cylinder and roseRecord existing cylinder position, rose diameter, and projection
Mechanical override accessCheck the key path for obstruction and required working space
Battery or service accessAsk the drawing to identify the compartment location and access direction
Card-reader orientationEstablish the mounting direction and any orientation marking

Ask the supplier to mark all cutouts, fixing points, service areas, and keep-clear zones on one coordinated drawing. A product photograph cannot show the space needed to operate a lever, insert a mechanical key, or replace cells.

The catalogue records RFID/IC card and mechanical override access for the relevant versions, with passcode access dependent on the model version.

6. Record frame, swing, and neighboring hardware

Use an installation site survey as the source record for the frame and surrounding hardware. It should extend beyond the lock cutout because the panel, handle, closer, and door movement affect whether the installed assembly can operate.

For managed access points, coordinate the fit review with Office Smart Lock Site Survey. For an existing opening being altered, use Smart Lock Retrofit Site Survey to distinguish new work from retained hardware.

AreaRequired record
Frame rebateWidth, depth, length, and position
Door revealClearance between leaf and frame when closed
Strike keeperPosition, dimensions, fixings, and frame construction
Hinge sideHanding, hinge type, and any frame alignment constraint
Swing pathFull opening movement, including handle and closer positions
Door closerBody position, arm movement, and available service clearance
Hold-open deviceExisting device and its relationship to the lock panel
Exit hardwareAny escape device, panic hardware, or lever exit retained beside the opening
Floor and thresholdClearance below the leaf and any obstruction at the threshold

Include wide-angle photographs of the open and closed door, plus close photographs of the frame rebate and adjacent hardware. Ask the installer to identify any retained component whose movement could conflict with the lock panel. Do not infer that an existing mortise, frame cutout, or strike arrangement is reusable from appearance alone.

7. Hold special openings until evidence is attached

For glass, metal, unusually thick, fire-rated, altered, or weather-exposed openings, convert uncertainty into a specific evidence request. The buyer’s question is not simply “Can it be installed?” but “Which fitting method and evidence apply to this exact opening?”

Opening conditionQuestion for the supplierEvidence to demand
Glazed leafWhich glass areas and frame materials may be drilled or fitted?Marked fitting method and drawing
Metal leafAre reinforcement or through-hole methods required?Installation method statement
Fire-rated designationWhat opening-specific evidence is required before alteration?Property-owner and approval record
Previously altered leafWhat effect do existing reinforcements and cutouts have?Detailed survey and supplier response
Weather-exposed locationWhich environment conditions apply to the selected configuration?Dated product-page specification

The supplied SLK-236 records show a blank Door fit field and a blank Environment field, so do not infer suitability for any of these conditions.

CONFIRM-WITH-LOCAL-SITE-OWNER: Confirm the permitted fitting method, any opening-specific approval evidence, and which authority or property representative signs off before the lock is ordered for that site.

8. Freeze the configuration in the quotation and drawing

A fit approval must apply to one defined configuration. Freeze the access package, management method, finish, power format, and version before the drawing is released for site comparison.

Configuration areaCatalogue record to verifyRequired bid statement
AccessRFID/IC card; passcode optional by model version; mechanical overrideState the exact included methods
PlatformHotel lock management software on PC; TTLock on keypad versions; BluetoothName the software and device combination
FunctionsGuest card issuance, floor or room permissions, check-in validity windows, unlock recordsIdentify functions enabled for the order
PowerFour AA alkaline batteries; low-battery alertConfirm cell format and alert configuration
Body and panelAluminum alloy, No. 2 short hotel mortise, 300 × 75 × 15 mm panelIdentify the exact drawing revision
FinishBlack, silver, or goldState the ordered finish
VersionPasscode keypad versionConfirm configuration on the order or quotation

Treat this table as a verification schedule, not an unconditional specification list. Do not translate “optional” into an included feature until the quotation states it, and do not permit a software or access-method substitution without a revised drawing comparison.

Use Configuring SLK-236: Credential Choices and Management Tools after the mechanical fit is established. Credential and management choices must still map to the ordered configuration; a software discussion cannot close an unresolved panel, case, or backset question.

9. Turn the fit check into sample and document deliverables

Request a sample that represents the proposed SKU, access version, management method, finish, and relevant hardware arrangement. Use the order samples route to identify the configuration under review, and request the controlled documents through request the catalogue.

The technical bid package should contain:

  • An identification photograph and configuration sheet for the sample.
  • The dimension drawing, installation guide, and full datasheet with revision numbers.
  • The completed door measurement and frame survey.
  • A panel and interface drawing marked with the approved clearances.
  • The supplier response to every open fit question.
  • Any agreed project packaging, manuals, logo, finish, and configuration record.

The catalogue lists OEM/ODM support for custom logo, finish, packaging, manuals, and product configuration for distributor and project orders. A sample check establishes the proposed interface; it does not replace a verified survey of the eventual opening.

Treat an on-site trial as a separately approved activity because drilling, frame work, or temporary alteration may be involved. Record who authorizes it, who performs it, and how the door is restored if the sample is rejected.

10. Separate supplier guidance from site installation work

The bid should identify where technical guidance ends and site work begins. This prevents a general installation guide from being read as approval for an opening that differs from the drawing.

ActivitySupplier responsibilitySite installer responsibilityBuyer or owner responsibility
Dimension issueSupply the controlled drawing and answer geometry queriesReview the drawing against site conditionsAccept the selected revision
Site measurementExplain required points and unitsMeasure, photograph, sign, and date the recordCoordinate access to the opening
Opening modificationDefine permitted work and deviationsExecute the approved workConfirm the authorized scope
InstallationProvide product-specific instructions and supportInstall, align, and test the assemblyArrange the handover conditions
HandoverSupply the agreed documents and configuration recordRecord completion and exceptional conditionsAccept the completed installation record

Name the responsible party for each line rather than using “installer” as a catch-all. If the site condition conflicts with the drawing, stop the work and return the issue to the supplier for a written response. A field adjustment that changes the case, faceplate, spindle, panel, or strike relationship must be recorded as a deviation against the original drawing revision.

11. Run fit clarification as a controlled deviation log

Keep fit questions visible until they are closed. Use SLK-236 Order Checklist for Project and Repeat Purchases for the wider order-control process, while retaining the following issue log specifically for geometry.

Issue IDOpening or door typeDrawing itemQuestion and evidence requestedOwnerStatus
FIT-01Record locationBackset definitionSupplier to identify the applicable centreline and methodSupplierOpen
FIT-02Record locationExisting caseConfirm whether reuse is covered by the exact-SKU drawingSupplierOpen
FIT-03Record locationPanel zoneSupply marked panel outline and service clearancesSupplierOpen
FIT-04Record locationStrike and keeperConfirm frame interface and fixing positionsInstallerOpen
FIT-05Record locationConfigurationIdentify the access and management versionSupplierOpen

Record the answer, source document, respondent, and date for every issue. Close an issue only when the evidence supports a decision; a verbal assurance or an undated photograph is not a closed fit check. Keep unresolved questions linked to the affected opening rather than attaching them to the project as a general note.

The same question is worked through in more detail in the smart lock bluetooth security. That is the same question slk 236 door fit notes has to answer here.

12. Score the fit decision before releasing the order

Use the following decision comparison to control the evaluation. The outcome applies to the surveyed opening and the exact proposed configuration, not automatically to every similar door.

DecisionEvidence requiredBid responseRelease rule
Proceed to sample fitExact SKU, controlled drawing, completed survey, matching interfaces, and named configurationApprove the opening for sample evaluationNo unresolved dimensional discrepancy
Conditional sample fitOne non-interface item remains open, with written conditions and an ownerApprove only the stated sample activityProduction release remains withheld
Hold fit decisionMeasurement, drawing revision, configuration, or supplier answer is missingRequest the missing evidenceRe-enter the matrix after verification
Reject or evaluate an alternateVerified site condition conflicts with the proposed lock drawingRecord the mismatch and assess another approved configurationNew drawing comparison required

An illustrative scenario, not a case study, shows why this gate matters. A retrofit opening has an incomplete door schedule and a photograph of an existing faceplate, while the access, finish, and power requirements match the proposed lock. The opening should remain on hold because those matching features do not answer the case, panel, and frame geometry.

Record the decision against the opening record and preserve the evidence behind it. Any later change to door construction, frame hardware, lock version, panel, or mortise configuration should reopen the comparison where it affects the interface.

13. Record final procurement approval

The sign-off sheet converts the technical review into an auditable bid decision. Do not leave the status as “appears suitable” when a field still requires evidence.

Approval fieldEntry
Exact SKU and configurationSupplier reference
Drawing revisionDocument number and issue date
Survey completionMeasured by, checked by, and date
Required site workNamed scope and responsible party
Open deviationsIssue IDs and disposition
Fit decisionProceed, conditional, hold, or reject
Procurement approverName, role, and signature
Site acceptance recordReference for the eventual installation

Attach the completed sheet to the request-a-quote package with the exact-SKU drawing and survey. Only a dated product-page confirmation and an exact-SKU drawing can close a product-interface question; the verified field measurement completes the site side of the comparison.

Il tuo carrello
La tua esperienza su questo sito sarà migliorata consentendo i cookie Informativa sui cookie
Chat on WhatsApp