SLK-236 Fitting Notes: What to Measure Before You Order
Use this sheet as the technical bid return for the SLK-236 and SLK-236-2. The slk 236 door fit notes below turn a catalogue request into a traceable measurement and acceptance record, so a Procurement Manager can compare supplier responses without treating a product name as proof of door compatibility.
Direct answer. In short, slk 236 door fit notes is the subject of this piece. slk 236 door fit notes is where the work on slk 236 door fit notes sits. slk-236 is what has to be evidenced before anyone signs. A slk 236 door fit notes describes how one component behaves under load. The datasheet makes claims. slk 236 door fit notes is what slk 236 door fit notes can be tested against.
Throughout, slk 236 door fit notes means what slk 236 door fit notes sets out. It is a working definition of slk 236 door fit notes drawn from the evidence below. It is valid for the specific market and product, not as a general claim.
- Establish the reach — confirm on the dated product page for the specific SKU behind slk 236 door fit notes
- Establish the edge — record where the technology in slk-236 stops working
- Establish the reserve — name the mechanical path that remains if slk 236 door fit notes fails
- This is the sequence slk 236 door fit notes has to follow, anchored on slk 236.
The supplied catalogue records leave the Door fit field blank for both references and identify a No. 2 short hotel mortise plus a 300 × 75 × 15 mm panel. Those catalogue facts do not establish the required door thickness, backset, rebate, faceplate, or keeper geometry. Confirm on the dated product page for the specific SKU, and obtain the applicable dimension drawing, before approving a fit.
Complete one line per opening or door type. The bid may proceed to sample evaluation only when the exact SKU, site measurements, drawing, configuration, and installation assumptions are linked.
1. Lock the commercial model before checking dimensions
Treat the two catalogue records as separate bid lines unless the supplier issues a written configuration identifying which record and version will be supplied. Do not assume that a shared mortise or panel specification makes the names interchangeable.
Use SLK-236: Reading the Published Specification Without Guesswork to check how each published field should be interpreted. The fit worksheet then adds the site evidence missing from a general specification review.
| Bid field | Required response | Evidence attached |
|---|---|---|
| Product reference | Write SLK-236 or SLK-236-2 exactly | Supplier quotation and dated product-page reference |
| Access version | Record RFID/IC card, optional passcode version, and mechanical override configuration | Written configuration for the specific SKU |
| Management version | Record PC hotel lock management software or TTLock on keypad versions, plus the recorded Bluetooth configuration | Software and version statement |
| Listed functions | Record guest card issuance, floor or room permissions, check-in validity windows, and unlock records | Configuration list |
| Finish | State black, silver, or gold | Finish sample and order code |
| Drawing set | Issue dimension drawings, installation guide, and full datasheet | Controlled drawing revision |
| Installation scope | Identify supplier guidance, site work, and approval responsibility | Signed responsibility matrix |
Treat every catalogue-derived cell as information to verify. If the supplier cannot identify the applicable record, version, drawing revision, and configuration, leave the fit status open.
2. Make the dimension drawing the controlling fit document
Treat the slk 236 door fit notes as a controlled attachment to the exact-SKU drawing. Request the SLK-236 dimension drawing, installation guide, and full datasheet listed in the catalogue’s documentation field, then record their revision and issue date in the bid.
The evidence hierarchy is straightforward: the product page identifies the SKU, the drawing defines what the lock requires, the survey records what the door provides, and the comparison decides whether the two can work together. A catalogue name, photograph, or door schedule cannot replace the missing interface drawing.
flowchart TD
A[Name exact SKU] --> B[Check dated product page]
B --> C[Issue controlled drawing]
C --> D[Measure the opening]
D --> E[Compare every interface]
E --> F{All checks pass}
F -->|Yes| G[Approve fit for sample]
F -->|No| H[Hold fit and raise query]
| Evidence item | What it establishes | Acceptance rule |
|---|---|---|
| Dated product-page reference | The current record for the named SKU | Revision recorded |
| Dimension drawing | Required case, panel, spindle, and faceplate geometry | Matches the ordered configuration |
| Installation guide | Permitted installation sequence and adjustment points | Revision recorded |
| Full datasheet | Interfaces and supplied components | Configuration identified |
| Signed site record | Actual dimensions of the opening | No blank mandatory field |
| Comparison matrix | Agreement between drawing and opening | Every interface marked pass or hold |
The catalogue states that dimension drawings, an installation guide, and a full datasheet are available on request. If the drawing does not resolve a dimension used in the bid, request clarification rather than accepting a supplier assumption.
3. Complete the smart lock door measurement record
Complete the smart lock door measurement at the actual leaf that will receive the lock. Use millimetres, record the measuring method, and attach a photograph that includes a scale or tape. Record door thickness and backset separately because one value cannot substitute for the other.
| Measurement | How to record it | Evidence needed |
|---|---|---|
| Door thickness | Measure the leaf at lock height and at additional representative points | Overall and local readings |
| Leading edge | Record straightness, bevel, contour, and damage | Close photograph |
| Door height and width | Measure at the lock area without compressing the leaf | Overall photograph |
| Rebate | Measure width, depth, length, and position on the edge | Rebate photograph and section sketch |
| Faceplate zone | Record the visible plate area and surrounding construction | Front and edge photographs |
| Existing cutouts | Record position, shape, and condition of boreholes or routed areas | Close photographs |
| Handling and swing | Mark handing, hinge side, and opening direction | Simple door plan |
| Leaf construction | Identify solid, glazed, metal, composite, or other construction where visible | Material note |
Measure the thickness of the leaf being fitted rather than a similar door nearby. Record any taper, unevenness, or edge damage because a local condition can affect the panel, case, or faceplate interface even when the overall dimension is acceptable.
The person taking the measurements should sign and date the record. The installer should confirm the method, while the buyer retains the photograph set and marked-up drawing. Do not copy dimensions from a room schedule unless the schedule identifies the exact leaf and records its source.
4. Resolve mortise case and faceplate geometry
The hotel mortise case measurement must be compared with the supplier drawing. The catalogue lists a No.
Define the keypad lock backset using the method shown in that drawing. Record the distance from the leading edge of the door to the applicable centreline, but do not assume the cylinder centreline and spindle centreline are interchangeable unless the drawing states that they are.
| Interface | Record from the drawing and site | Pass condition |
|---|---|---|
| Mortise case body | Depth, width, height, and position within the leaf | Both dimensions agree |
| Backset | Drawing definition and measured door-edge distance | Exact comparison recorded |
| Faceplate | Width, height, projection, and screw-centre positions | Plate position and fixing points match |
| Spindle and follower | Size, length, projection, and engagement | Correct movement and clearance |
| Latch or bolt features | Type, position, projection, and travel shown | No interference in the closed position |
| Strike and keeper | Plate position, keeper dimensions, and fixing points | Door closes fully against the frame |
Check the opening for the moving bolt as well as the lock case. A case can fit within the leaf while the bolt still fouls the rebate or keeper. Do not approve the fit from the backset alone, and do not approve reuse of an existing case unless the supplier’s exact-SKU drawing explicitly covers that arrangement.
5. Check panel and operating hardware clearances
For an RFID hotel lock fitting, panel fit is separate from mortise-case fit.
| Panel interface | Survey or drawing action |
|---|---|
| Mounting zone | Mark the full panel outline and inspect the surrounding door surface |
| Edge distance | Measure from the panel outline to the nearest door edge or obstruction |
| Spindle interface | Check follower position, projection, and available movement |
| Lever or handle | Record handle projection, return path, and clearance from the panel |
| Cylinder and rose | Record existing cylinder position, rose diameter, and projection |
| Mechanical override access | Check the key path for obstruction and required working space |
| Battery or service access | Ask the drawing to identify the compartment location and access direction |
| Card-reader orientation | Establish the mounting direction and any orientation marking |
Ask the supplier to mark all cutouts, fixing points, service areas, and keep-clear zones on one coordinated drawing. A product photograph cannot show the space needed to operate a lever, insert a mechanical key, or replace cells.
The catalogue records RFID/IC card and mechanical override access for the relevant versions, with passcode access dependent on the model version.
6. Record frame, swing, and neighboring hardware
Use an installation site survey as the source record for the frame and surrounding hardware. It should extend beyond the lock cutout because the panel, handle, closer, and door movement affect whether the installed assembly can operate.
For managed access points, coordinate the fit review with Office Smart Lock Site Survey. For an existing opening being altered, use Smart Lock Retrofit Site Survey to distinguish new work from retained hardware.
| Area | Required record |
|---|---|
| Frame rebate | Width, depth, length, and position |
| Door reveal | Clearance between leaf and frame when closed |
| Strike keeper | Position, dimensions, fixings, and frame construction |
| Hinge side | Handing, hinge type, and any frame alignment constraint |
| Swing path | Full opening movement, including handle and closer positions |
| Door closer | Body position, arm movement, and available service clearance |
| Hold-open device | Existing device and its relationship to the lock panel |
| Exit hardware | Any escape device, panic hardware, or lever exit retained beside the opening |
| Floor and threshold | Clearance below the leaf and any obstruction at the threshold |
Include wide-angle photographs of the open and closed door, plus close photographs of the frame rebate and adjacent hardware. Ask the installer to identify any retained component whose movement could conflict with the lock panel. Do not infer that an existing mortise, frame cutout, or strike arrangement is reusable from appearance alone.
7. Hold special openings until evidence is attached
For glass, metal, unusually thick, fire-rated, altered, or weather-exposed openings, convert uncertainty into a specific evidence request. The buyer’s question is not simply “Can it be installed?” but “Which fitting method and evidence apply to this exact opening?”
| Opening condition | Question for the supplier | Evidence to demand |
|---|---|---|
| Glazed leaf | Which glass areas and frame materials may be drilled or fitted? | Marked fitting method and drawing |
| Metal leaf | Are reinforcement or through-hole methods required? | Installation method statement |
| Fire-rated designation | What opening-specific evidence is required before alteration? | Property-owner and approval record |
| Previously altered leaf | What effect do existing reinforcements and cutouts have? | Detailed survey and supplier response |
| Weather-exposed location | Which environment conditions apply to the selected configuration? | Dated product-page specification |
The supplied SLK-236 records show a blank Door fit field and a blank Environment field, so do not infer suitability for any of these conditions.
CONFIRM-WITH-LOCAL-SITE-OWNER: Confirm the permitted fitting method, any opening-specific approval evidence, and which authority or property representative signs off before the lock is ordered for that site.
8. Freeze the configuration in the quotation and drawing
A fit approval must apply to one defined configuration. Freeze the access package, management method, finish, power format, and version before the drawing is released for site comparison.
| Configuration area | Catalogue record to verify | Required bid statement |
|---|---|---|
| Access | RFID/IC card; passcode optional by model version; mechanical override | State the exact included methods |
| Platform | Hotel lock management software on PC; TTLock on keypad versions; Bluetooth | Name the software and device combination |
| Functions | Guest card issuance, floor or room permissions, check-in validity windows, unlock records | Identify functions enabled for the order |
| Power | Four AA alkaline batteries; low-battery alert | Confirm cell format and alert configuration |
| Body and panel | Aluminum alloy, No. 2 short hotel mortise, 300 × 75 × 15 mm panel | Identify the exact drawing revision |
| Finish | Black, silver, or gold | State the ordered finish |
| Version | Passcode keypad version | Confirm configuration on the order or quotation |
Treat this table as a verification schedule, not an unconditional specification list. Do not translate “optional” into an included feature until the quotation states it, and do not permit a software or access-method substitution without a revised drawing comparison.
Use Configuring SLK-236: Credential Choices and Management Tools after the mechanical fit is established. Credential and management choices must still map to the ordered configuration; a software discussion cannot close an unresolved panel, case, or backset question.
9. Turn the fit check into sample and document deliverables
Request a sample that represents the proposed SKU, access version, management method, finish, and relevant hardware arrangement. Use the order samples route to identify the configuration under review, and request the controlled documents through request the catalogue.
The technical bid package should contain:
- An identification photograph and configuration sheet for the sample.
- The dimension drawing, installation guide, and full datasheet with revision numbers.
- The completed door measurement and frame survey.
- A panel and interface drawing marked with the approved clearances.
- The supplier response to every open fit question.
- Any agreed project packaging, manuals, logo, finish, and configuration record.
The catalogue lists OEM/ODM support for custom logo, finish, packaging, manuals, and product configuration for distributor and project orders. A sample check establishes the proposed interface; it does not replace a verified survey of the eventual opening.
Treat an on-site trial as a separately approved activity because drilling, frame work, or temporary alteration may be involved. Record who authorizes it, who performs it, and how the door is restored if the sample is rejected.
10. Separate supplier guidance from site installation work
The bid should identify where technical guidance ends and site work begins. This prevents a general installation guide from being read as approval for an opening that differs from the drawing.
| Activity | Supplier responsibility | Site installer responsibility | Buyer or owner responsibility |
|---|---|---|---|
| Dimension issue | Supply the controlled drawing and answer geometry queries | Review the drawing against site conditions | Accept the selected revision |
| Site measurement | Explain required points and units | Measure, photograph, sign, and date the record | Coordinate access to the opening |
| Opening modification | Define permitted work and deviations | Execute the approved work | Confirm the authorized scope |
| Installation | Provide product-specific instructions and support | Install, align, and test the assembly | Arrange the handover conditions |
| Handover | Supply the agreed documents and configuration record | Record completion and exceptional conditions | Accept the completed installation record |
Name the responsible party for each line rather than using “installer” as a catch-all. If the site condition conflicts with the drawing, stop the work and return the issue to the supplier for a written response. A field adjustment that changes the case, faceplate, spindle, panel, or strike relationship must be recorded as a deviation against the original drawing revision.
11. Run fit clarification as a controlled deviation log
Keep fit questions visible until they are closed. Use SLK-236 Order Checklist for Project and Repeat Purchases for the wider order-control process, while retaining the following issue log specifically for geometry.
| Issue ID | Opening or door type | Drawing item | Question and evidence requested | Owner | Status |
|---|---|---|---|---|---|
| FIT-01 | Record location | Backset definition | Supplier to identify the applicable centreline and method | Supplier | Open |
| FIT-02 | Record location | Existing case | Confirm whether reuse is covered by the exact-SKU drawing | Supplier | Open |
| FIT-03 | Record location | Panel zone | Supply marked panel outline and service clearances | Supplier | Open |
| FIT-04 | Record location | Strike and keeper | Confirm frame interface and fixing positions | Installer | Open |
| FIT-05 | Record location | Configuration | Identify the access and management version | Supplier | Open |
Record the answer, source document, respondent, and date for every issue. Close an issue only when the evidence supports a decision; a verbal assurance or an undated photograph is not a closed fit check. Keep unresolved questions linked to the affected opening rather than attaching them to the project as a general note.
The same question is worked through in more detail in the smart lock bluetooth security. That is the same question slk 236 door fit notes has to answer here.
12. Score the fit decision before releasing the order
Use the following decision comparison to control the evaluation. The outcome applies to the surveyed opening and the exact proposed configuration, not automatically to every similar door.
| Decision | Evidence required | Bid response | Release rule |
|---|---|---|---|
| Proceed to sample fit | Exact SKU, controlled drawing, completed survey, matching interfaces, and named configuration | Approve the opening for sample evaluation | No unresolved dimensional discrepancy |
| Conditional sample fit | One non-interface item remains open, with written conditions and an owner | Approve only the stated sample activity | Production release remains withheld |
| Hold fit decision | Measurement, drawing revision, configuration, or supplier answer is missing | Request the missing evidence | Re-enter the matrix after verification |
| Reject or evaluate an alternate | Verified site condition conflicts with the proposed lock drawing | Record the mismatch and assess another approved configuration | New drawing comparison required |
An illustrative scenario, not a case study, shows why this gate matters. A retrofit opening has an incomplete door schedule and a photograph of an existing faceplate, while the access, finish, and power requirements match the proposed lock. The opening should remain on hold because those matching features do not answer the case, panel, and frame geometry.
Record the decision against the opening record and preserve the evidence behind it. Any later change to door construction, frame hardware, lock version, panel, or mortise configuration should reopen the comparison where it affects the interface.
13. Record final procurement approval
The sign-off sheet converts the technical review into an auditable bid decision. Do not leave the status as “appears suitable” when a field still requires evidence.
| Approval field | Entry |
|---|---|
| Exact SKU and configuration | Supplier reference |
| Drawing revision | Document number and issue date |
| Survey completion | Measured by, checked by, and date |
| Required site work | Named scope and responsible party |
| Open deviations | Issue IDs and disposition |
| Fit decision | Proceed, conditional, hold, or reject |
| Procurement approver | Name, role, and signature |
| Site acceptance record | Reference for the eventual installation |
Attach the completed sheet to the request-a-quote package with the exact-SKU drawing and survey. Only a dated product-page confirmation and an exact-SKU drawing can close a product-interface question; the verified field measurement completes the site side of the comparison.

