Slk 9936g door fit notes: A stage-by-stage procurement guide to verifying SLK-9936G door fit for wood and metal hotel doors before approval and sign-off.

Pubblicato il: nov 22, 2022

SLK-9936G Door Fit Questions, Answered for Procurement Teams

SLK-9936G Door Fit Questions, Answered for Procurement Teams

Procurement teams rarely need another general statement that a smart lock fits. They need a traceable path from the opening schedule to approved evidence, especially when one purchase covers wooden and metal hotel doors. These slk 9936g door fit notes focus on one first-party model: the SLK-9936G RFID Hotel Card Door Lock (Gold Finish).

Direct answer. The one-line answer — slk 9936g door fit notes is the working record for slk 9936g door fit notes. slk 9936g door fit notes is worthless until slk-9936g is attached to it as evidence. A slk 9936g door fit notes treats one component on its own terms. slk 9936g door fit notes names the tests that close it. slk 9936g door fit notes is not accepted on a headline figure.

slk 9936g door fit notes means here what slk 9936g door fit notes sets out. It is a working definition of slk 9936g door fit notes for this market and product. It is drawn from the evidence below, and it is not a general marketing phrase.

The current catalogue record gives an applicable door thickness of 36–100 mm and identifies hotel wooden and metal doors as suitable door types. That is a screening boundary, not a site approval. Confirm on the dated product page for the specific SKU before turning any catalogue field into a purchase requirement. The process below identifies the evidence needed at each stage, the questions that close each gap, and the conditions that should stop an order.

Separate fit, compatibility, and approval

Door-fit approval should be treated as four linked checks rather than one thickness measurement:

  • Schedule fit: the opening exists, has a stable reference, and is correctly described.
  • Geometric fit: the leaf, mortise, backset, spindle, latch or bolt, and strike arrangement coordinate.
  • Operational fit: handles, cylinders, closers, hold-open devices, escape hardware, and service-access areas do not conflict.
  • Evidence fit: current drawings, installation instructions, and the dated product record support the release decision.

A door can fall within the catalogue thickness range and still lack a confirmed mortise or strike geometry. Conversely, a drawing can appear compatible while the installed door differs from the design. The Office Smart Lock Site Survey can support the wider site review, while this article focuses on the SLK-9936G-specific evidence trail.

Stage map from schedule to installation handoff

The process uses stages rather than calendar promises. Procurement can run document review and measurement work in parallel, but no stage should be treated as closed merely because a later stage has started.

flowchart TD
    A[Stage 0 Freeze opening schedule] --> B[Stage 1 Build dimension worksheet]
    B --> C[Stage 2 Check catalogue fit envelope]
    C --> D[Stage 3 Obtain dated fit evidence]
    D --> E[Stage 4 Complete sample fit review]
    E --> F[Stage 5 Freeze purchase order]
    F --> G[Stage 6 Hand off installation package]
StageMain procurement actionExit evidence
0Freeze the opening scheduleControlled door references and construction details
1Build the measurement worksheetField measurements reconciled with drawings
2Check the catalogue envelopeFit, conditional fit, or not demonstrated
3Obtain supporting documentsDated drawing, guide, and data record
4Complete sample fit reviewSigned fit record and exception list
5Freeze the purchase orderAgreed clauses and evidence register
6Transfer information to installationApproved set, changes, and closeout record

Each exit is a document or an accountable decision. A photograph, catalogue page, or sample without an associated record may still leave the decision unsupported.

Stage 0 — freeze the opening schedule

Start with the project’s authoritative door schedule, not with the lock. Give every relevant opening a stable reference that can travel through drawings, quotations, samples, purchase orders, and installation records. For each opening, capture the door location, quantity, leaf construction, frame description, thickness shown on the schedule, handing, swing direction, and any associated closer, hold-open device, or escape device.

The catalogue reference is slk-9936g, while the buyer-facing model name is SLK-9936G. Use one naming convention in the evidence register so that a drawing request, quote, and purchase order cannot point to different assumed versions.

Do not infer door construction from the room type. A hotel project may contain timber, metal, composite, or other openings, but only hotel wooden and metal doors appear in the current SLK-9936G catalogue record. If the schedule mixes constructions, create separate verification paths rather than one blanket approval.

CONFIRM-WITH-LOCAL-AUTHORITY: Confirm the project-specific access, egress, and door-classification requirements with the authority having jurisdiction and the door manufacturer before freezing the order.

Stage 1 — turn the schedule into a measurable worksheet

A schedule value identifies what the design intends; a field measurement records the condition being purchased. Capture both and label their sources. The following worksheet shows the minimum information needed for a meaningful mortise and strike measurement review.

Measurement pointRecordSourceReason for collection
Door leafThickness at several unobstructed positionsField measurementTests the catalogue envelope and reveals variation
Door leafConstruction and face finishSchedule plus field checkConfirms the catalogue door-type boundary
FrameRebate and pocket geometryDrawing plus field checkLocates the lock body and strike interface
Lock caseCutout, case dimensions, backset, and fixing positionsDimension drawingEstablishes required door preparation
Spindle and handlePosition, projection, and fixing arrangementDrawing plus site checkChecks the operating interface
Latch or boltShape, projection, and travelCurrent lock drawingIdentifies strike requirements
Strike plate and keeperPlate size, screw positions, keeper openingDrawing plus site checkConfirms frame-side coordination
CylinderProfile, collar, and access arrangementCurrent lock drawingReviews the lock and emergency-access arrangement
Adjacent hardwareCloser, hold-open, escape, and service areasCoordination drawingIdentifies operating conflicts

Record each value with its unit, source, measurement date, and drawing revision. Do not fill an unknown with a typical value. A nominal schedule thickness can fall within 36–100 mm while the measured leaf varies; the worksheet should expose that variation rather than conceal it.

Stage 2 — test the catalogue fit envelope

The catalogue record for the SLK-9936G RFID Hotel Card Door Lock (Gold Finish) supplies the current screening facts.

Catalogue itemCurrent recordProcurement useEvidence still required
Door thickness36–100 mmFirst screen for each measured leafDated drawing and field measurement
Door typesHotel wooden and metal doorsRoute openings into the applicable fit reviewConstruction evidence from schedule and site
Mortise5-pin high-security profile cylinderReview cylinder and door-preparation detailsLock case and cylinder drawings
Body and panelStainless steel and alloyIdentify material and finish for reviewCurrent product evidence and physical sample
FinishGold brushedMatch the approved visible finishFinish sample and order confirmation
StyleRFID Hotel Card Lock (Heavy-Duty ANSI)Catalogue descriptor onlyCurrent written specification for the ordered version
EnvironmentNo populated environment recordPrevent assumptions about untested conditionsApplication-specific confirmation

The exact phrase SLK-9936G door thickness should appear on the worksheet as a field name, not as a conclusion pasted into every row. Record the measured value beside it. If the measurement falls outside the catalogue range, mark the opening as not demonstrated rather than stretching the boundary.

A conditional result is appropriate when the thickness and construction appear suitable but a dimension, drawing, or coordination item remains open. A fit result requires all critical evidence to agree. Any conflict between the approved drawing, the field condition, and the product record should return the opening to the previous stage.

Stage 3 — demand dated, project-specific evidence

The catalogue services record states that dimension drawings, an installation guide, and a full datasheet are available on request. Ask for the documents that correspond to the exact ordered configuration and record their dates and revision references.

The evidence request should include:

  1. A dimension drawing showing panel, lock case, mortise, backset, spindle, latch or bolt, strike plate, keeper, and cylinder interfaces.
  2. The installation guide covering door preparation, fixing, cable routing where applicable, battery access, and commissioning.
  3. The full dated product record for the specific SKU, finish, and any approved project configuration.
  4. The door manufacturer’s coordination drawing for each represented opening.
  5. A written statement of the door constructions and thickness conditions covered by the supplied information.
  6. The sample-test method used to demonstrate fit, including which adjacent hardware was present.

The door set dimension drawings should be compared with the measurement worksheet, not placed in a separate folder. Annotate each critical interface and record who resolved any difference. If a document is missing, leave the related criterion open and identify the supplier or project party responsible for providing it.

For a detailed reading of the available specification fields, use What the SLK-9936G Data Sheet Actually Tells a Buyer. For an existing opening rather than a new design, the Smart Lock Retrofit Site Survey helps frame the survey evidence before requesting replacement or adjustment details.

Stage 4 — review the complete door-to-strike path

Door preparation is a chain of interfaces. The panel must be positioned on the leaf, the lock case must fit the pocket, the spindle must operate the handle, and the latch or bolt must meet the strike. A successful check must continue through the frame and adjacent hardware.

ObjectFit questionEvidence for the decision
Escutcheon or panelDoes the panel position suit the leaf edge, handle, and service areas?Panel drawing and marked-up site photo
Lock body or mortiseDoes the case match the pocket and fixing positions?Case drawing and preparation drawing
Backset and spindleAre their positions and interfaces consistent?Dimension drawing and sample operation
Latch or boltDoes the moving element meet the prepared strike geometry?Strike drawing and fit trial
Strike plate and keeperDo plate and keeper features match the frame construction?Frame drawing and field verification
Cylinder and collarDoes the cylinder arrangement suit the lock and emergency-access plan?Cylinder detail and approved drawing
Closer, hold-open, or escape deviceDoes moving hardware conflict with the panel, handle, or latch?Coordination drawing and site trial

The catalogue lists a 5-pin high-security profile cylinder, stainless steel and alloy construction, and a gold brushed finish. Those facts help define what to inspect, but they do not establish the missing panel dimensions, case cutout, or strike geometry.

Record interference as an exception even if it can be adjusted informally. The procurement file should show whether the issue concerns lock preparation, frame modification, adjacent hardware, or the project requirement itself.

Stage 5 — separate credential workflow from physical fit

The current catalogue record places the SLK-9936G in an RFID hotel-card workflow. It lists standard RFID/IC card access, Mifare-1 13.56 MHz cards, hotel lock management software with a PC-linked card encoder and guest cards, guest-card issuance, floor and room permissions, check-in validity windows, and unlock records.

It also describes the lock as a standalone lock with a PC-linked card encoder and states that no in-room network is required. These are platform records, not substitutes for a door drawing.

Physical coordination should still cover the reader-panel position, card-handling space, encoder location, operator workflow, and handover of issued-card controls. The software decision is addressed separately in SLK-9936G Credential and Software Configuration Options; the fit gate should only confirm that the physical installation and operating responsibilities meet the approved project design.

A credential workflow that has been agreed at the specification stage does not close a missing panel dimension. Conversely, a well-fitted lock does not demonstrate that card issuance or record management has been assigned.

Stage 6 — complete a representative sample fit review

Use a physical sample when the fit risk justifies it. If the schedule includes both wooden and metal doors, include a representative opening from each construction rather than assuming one sample covers both. Select further samples when handing, frame design, thickness, or adjacent hardware varies materially.

The sample record should follow this sequence:

  1. Match the sample to the approved product, finish, accessory list, and current documentation.
  2. Record the opening reference, leaf construction, measured thickness, frame description, and preparation source.
  3. Photograph the unprepared opening, prepared pockets, installed lock components, and completed strike area.
  4. Compare each critical dimension with the approved worksheet.
  5. Operate the handle and latch or bolt through the full travel while relevant adjacent hardware is present.
  6. Record any filing, adjustment, repositioning, or frame intervention without modifying the approved requirement.
  7. Sign the result as fit, conditional fit, or not demonstrated, with every exception assigned.

Do not turn one successful sample into a blanket production approval. The record proves the condition actually tested. It does not prove that later doors share the same dimensions, preparation, or surrounding hardware. Avoid quoting an unverified reading distance or other operating figure; record only the documented procedure and observed result.

The approved sample also becomes the visual and procedural reference for installation. Where the project uses finish samples, photographs, or marked-up drawings, link each item to its opening reference so the procurement team can trace the approval.

The decision matrix procurement can sign

Use one matrix across the project so that “conditional fit” cannot mean something different in each quotation or meeting. The matrix is a procurement decision tool, not a substitute for the underlying measurements and drawings.

CriterionFitConditional fitNot demonstrated
Door thicknessMeasured value is inside the current 36–100 mm recordOne isolated value remains unresolvedMeasured value is outside the record
Door constructionHotel wooden or metal door is confirmedConstruction evidence is incompleteConstruction falls outside the current record
Mortise and backsetCurrent drawing and site geometry agreeA drawing or field check is outstandingKnown geometry conflicts
Strike and keeperPlate and keeper arrangement are verifiedFrame detail requires confirmationInterface cannot be reconciled
Adjacent hardwareOperating sequence is coordinatedOne item awaits a site trialHardware prevents operation
Credential workflowPhysical and management responsibilities are assignedSoftware or handover evidence remains openRequired workflow cannot be supported by the current record
DocumentationDated drawing, guide, and product record agreeNon-critical evidence is outstandingDocuments conflict or are absent
Sample evidenceRepresentative opening passes the agreed testExceptions have owners and closure conditionsFailure is not resolved

Release the purchase order for an opening only after every applicable criterion is marked fit or has an authorized condition accepted by the accountable project party. A conditional row must name the missing evidence, owner, and closure action. Procurement should not roll unresolved conditions into a general approval note.

Turn the fit notes into RFQ questions

Use the slk 9936g door fit notes as an RFQ question set, not as a general capability statement. The supplier should answer in the same order as the worksheet so omissions remain visible.

RFQ questionRequired responseStage closed
Which dated drawing applies to the ordered SLK-9936G configuration?Drawing reference, date, and revision3
Which door thicknesses and constructions are covered by that record?Explicit scope and stated exclusions2 and 3
What are the lock case, backset, spindle, latch or bolt, and strike dimensions?Marked dimension drawing3
How should the frame rebate and keeper be prepared?Frame preparation detail3 and 4
Which adjacent hardware must be present during sample operation?Sample test conditions4
What evidence establishes the fitted result?Signed sample record and photographs4
Which documents will accompany the delivered configuration?Document list and revision status5
What change requires re-approval?Written change-control route5 and 6

The mortise and strike measurement question should require values and drawings, not a general assurance that the lock will fit. Ask the respondent to identify any dimension that is not covered by the supplied evidence. That answer often exposes the risk earlier than a sample trial.

Include the opening schedule and measurement worksheet with the request. A supplier can then quote exceptions by opening reference instead of offering one undefined compatibility statement for the whole project.

Freeze the purchase-order evidence

The purchase order should carry the same evidence references used during evaluation. At minimum, state the exact model and finish, the door references covered by the order, the governing drawing revisions, the agreed sample result, and the route for handling an opening that differs from the approved condition.

Useful clauses address five points:

  • Configuration: Identify SLK-9936G and the selected finish rather than relying on a generic “RFID hotel lock” description.
  • Door-fit scope: Attach or reference the approved opening schedule and measurement worksheet.
  • Technical documents: List the dimension drawing, installation guide, and full datasheet included with the order.
  • Sample acceptance: Record the tested opening, conditions, result, and unresolved exceptions.
  • Change control: Require renewed fit approval before substituting hardware, changing preparation, or using the lock on an unrepresented opening.

Avoid clauses that imply that a nominal thickness, a category label, or one successful sample covers every door. Keep the wording aligned with the evidence actually supplied. The Clause Bank: SLK-9936G Purchase-Order Checklist: What to Confirm Before Ordering can be used as the broader order-control companion.

If the project changes the finish, hardware, lock configuration, or supplied documentation, treat it as a new fit question. The catalogue records OEM and ODM options for logo, finish, packaging, manuals, and product configuration, but a requested customization still needs its own confirmed evidence.

Hand the approved door set to installation

The installation package should carry the approved drawing and the exceptions list together. Before installation, the site team should reconcile the actual opening with the controlled schedule and sample record. Any difference in leaf thickness, construction, frame preparation, lock case, strike, or adjacent hardware enters the agreed change route.

During installation, record the as-installed configuration and the condition of the prepared interfaces. Preserve the approved detail alongside photographs of the completed lock. Do not conceal an improvised adjustment by updating only the installation record; the procurement evidence register should show the original assumption, the observed condition, and the accepted resolution.

After installation, close every exception against a clear outcome. Keep unresolved matters visible until the responsible project party accepts the evidence. This prevents the installation team and procurement team from using different definitions of “complete.”

The handoff is particularly important for hotel doors because access operations may connect to card issuance, guest permissions, validity windows, and unlock records. Physical closeout and management handover should be reviewed together, but neither should be used to imply that the other was already completed.

The same question is worked through in more detail in the smart lock administrator management. That is the same question slk 9936g door fit notes has to answer here.

Procurement sign-off and closeout checklist

Before release, the accountable reviewer should be able to answer yes to each applicable question:

  • Is every ordered opening linked to a controlled schedule reference?
  • Does each measured leaf thickness fall within the current catalogue record?
  • Is door construction confirmed against the documented hotel wooden and metal door scope?
  • Do the mortise, backset, spindle, latch or bolt, strike plate, and keeper drawings agree with the site?
  • Have closer, hold-open, escape, handle, and service-access conflicts been reviewed?
  • Are the dated product page, dimension drawing, installation guide, and full datasheet recorded?
  • Does the sample record identify the opening, conditions, result, and exceptions?
  • Are changes to preparation, hardware, finish, or product configuration routed for re-approval?

This hotel door lock fit checklist closes only the evidence required for the SLK-9936G decision. It does not replace the door manufacturer’s instructions or project-specific review. Keep the final model facts aligned with the current dated product record.

For an actionable next step, send the opening schedule, door set dimension drawings, and completed measurement worksheet with your request for a catalog, sample request, or quote request. The supplier can then respond to the specific fit evidence rather than making a broad statement about the hotel lock procurement package.