SLK-B09 on an Existing Door: Fit, Preparation and Retrofit

SLK-B09 on an Existing Door: Fit, Preparation and Retrofit

This bid sheet turns the subject of an existing glass-door installation into a measurable tender response. It is built around the slk b09 door fit notes a Procurement Manager needs before accepting a supplier’s claim of fit. The document separates published product information from site facts that each bidder must measure and evidence. It also reserves a route for a no-bid where the proposed preparation cannot be made technically clear.

Direct answer. The short answer is that slk b09 door fit notes is not one decision. It is a sequence. This article takes slk b09 door fit notes from slk b09 door fit notes through slk-b09 to the record you keep. A slk b09 door fit notes treats one component on its own terms. slk b09 door fit notes names the tests that close it. slk b09 door fit notes is not accepted on a headline figure.

slk b09 door fit notes is used here in the sense given under slk b09 door fit notes. It is a working definition of slk b09 door fit notes that carries no regulatory weight. The buyer still has to check it against the dated product page.

  • Confirm the feature — confirm on the dated product page for the specific SKU behind slk b09 door fit notes
  • Confirm the constraint — record where the technology in slk-b09 stops working
  • Confirm the contingency — name the mechanical path that remains if slk b09 door fit notes fails
  • slk b09 door fit notes runs this sequence, and slk b09 is the record it produces.

Use the blanks as mandatory response fields. A completed answer must identify the door, the proposed SLK-B09 arrangement, retained and removed components, preparation work, installer method, and acceptance evidence. Any dimension used in a purchasing decision must be confirmed on the dated product page for the specific SKU.

Bid instrument control and offer boundary

Issue this sheet with the request for quotation and require the bidder to return one completed package for every door or door group included in the offer. A photograph, catalogue description, or nominal door schedule cannot establish site-specific fit. The bidder must mark each dimensional or operational item as measured, confirmed by the installer, or still unresolved.

Control itemRequired bidder entry
Project and opening referenceProject name, building, floor, room or zone, and unique door ID
Offered productSLK-B09 and the exact proposed configuration
Door statusExisting door, existing glass panel, or separately supplied door
Offer typeDirect installation, retrofit, alternate product, or door excluded
DrawingsDimensioned survey drawings keyed to the door IDs
Installation methodPreparation sequence, specialist work, and proposed hold points
DeviationsEvery departure from this bid sheet, listed separately
ClarificationsUnresolved technical questions and required response dates
Authorised contactNamed technical contact with responsibility for the offer

The offer boundary must distinguish hardware supply from site preparation. State separately who removes existing hardware, modifies the glass or frame, supplies replacement parts, makes good finishes, installs the lock, configures credentials, and completes handover. Any door that cannot be covered by the bidder’s documented method must be identified before award rather than carried as an unqualified assumption.

Bidder substitutions require written approval. A proposed alternative lock may be offered as a separate line against the same opening, but it must not silently replace the SLK-B09 in the primary schedule.

What the catalogue record establishes—and leaves open

The published record identifies SLK-B09 as a Face Recognition Smart Lock for Double Glass Office Doors. Its Access fields record Passcode: Standard, Fingerprint: Standard, and 3D face: Standard. Its Body & panel field records Style: Glass Door Smart Lock. Platform & network, Power, and Door fit are recorded as unavailable entries in the supplied catalogue record.

That boundary is central to this tender. The product description indicates the intended door context, but it does not provide a dimensional compatibility schedule. The bidder must not derive panel dimensions, fixing centres, door thickness, backset, power arrangement, or glass-preparation requirements from the model name.

Published itemPermitted use in this tenderRequired bidder response
Access: Passcode, fingerprint and 3D face listed as StandardDefines the access methods to describe in the offerState configuration, enrolment process, and operating dependencies
Style: Glass Door Smart LockIdentifies the product formatProvide a dimensioned installation drawing and door interface
Platform & network entry unavailableNo connectivity assumption may be madeState the control arrangement and any interface dependencies
Power entry unavailableNo power source or emergency arrangement may be assumedState supply, servicing, and interruption arrangements
Door fit entry unavailableNo dimensional fit may be inferredSupply measured site evidence and the proposed fit method
Documentation available on requestThe bidder should identify the exact issue it will supplyList drawing, guide, datasheet, and revision details
OEM/ODM project options listedPermits a project-order discussionDefine which options are included in the submitted offer

The catalogue also records dimension drawings, an installation guide, and a full datasheet as available on request, together with project-order options for logo, finish, packaging, manuals, and product configuration. Confirm on the dated product page for the specific SKU before making any of these part of the contractual offer.

The review method in SLK-B09: Reading the Published Specification Without Guesswork is useful when checking the bidder’s technical attachment against the catalogue. The bidder should attach the dated document issue it intends to supply and identify every field that remains subject to confirmation.

Existing-door survey schedule for each opening

Survey the actual door rather than relying on the architectural schedule. Record both overall door geometry and the local mounting interface. Measurements should identify the unit used, the datum from which each value was taken, and whether the value was measured directly or copied from an identified drawing.

A complete smart lock retrofit site survey should distinguish a nominal opening from an installed condition. Existing frames can move, glass can sit differently from the drawing, and added hardware can alter the usable space. The surveyor should note discrepancies instead of reconciling them without evidence.

Survey fieldResponse required for each door
Door ID and active leafExact identifier and which leaf is active
Door opening directionRecord inside and outside viewing directions
Overall leaf dimensionsWidth, height, thickness, and measurement unit
Glass and visible panelVisible width, height, and panel arrangement
Rail or frame sectionsWidth, depth, face position, and available fixing zone
Existing mounting hardwareLock, patch fitting, keeper, screws, and adhesive residue
Handle and interface locationsHandle, spindle, cylinder, latch, and strike positions where present
Fixing centresExisting centres and proposed centres if different
Door closer and other interfacesMake, model where visible, mounting points, and swing effect
Floor and wall clearancesThreshold, floor finish, adjacent wall, and service access
Obstruction recordHandles, frames, readers, cabling, and adjacent equipment
Photographic recordOverall views plus close-ups keyed to the survey drawing

The double glass door lock fit check should include a physical trial at the proposed lock position rather than a tape measurement alone. Place the proposed panel or template against the door, check the approach to the reader, and record interference with the handle, door swing, or adjacent leaf.

Use the Smart Lock Retrofit Site Survey for a complementary measurement prompt. The Office Smart Lock Site Survey provides an office-context survey structure, while the opening schedule must still reflect the actual glass doors supplied for this project.

Where the glass supplier holds the original door record, the bidder should compare it with the site measurement and highlight differences. Unexplained differences become clarification items, not values to average or round away.

Critical fit dimensions to require from bidders

The bidder’s drawing must connect the SLK-B09 installation envelope to the measured door. It should state minimum, maximum, and target dimensions where a range is meaningful. A single nominal dimension is insufficient when the retained interface can vary across the door schedule.

The glass door lock dimension worksheet should also identify the inspection method. It should state whether a dimension was taken from the glass, rail, frame, patch fitting, or proposed template and whether the result includes the fixing hardware.

Fit-critical itemDrawing and schedule requirement
Lock panel envelopeLength, width, depth, and position relative to the door datum
Fixing centresCentre-to-centre dimensions, hole sizes, and edge clearances
Glass or rail interfaceContact zone, available flat area, and any edge or frame constraint
Handle and spindle interfaceAxis location, projection, and clearance around the proposed panel
Latch and strike geometryFunctional relationship to the existing or proposed strike and keeper
Cylinder interfaceExisting cylinder position and any proposed replacement arrangement
Operating-side clearanceApproach, hand, reader use, and door swing at the active leaf
Service accessBattery, wiring, configuration, and maintenance access where applicable
Existing component removalExtent of retained parts and resulting make-good requirement
Installation datumFixed reference used for every door in the same type group

A complete SLK-B09 glass door retrofit statement should identify which dimensions are fixed by the supplied product and which are controlled by the door fabric. It should also say whether the proposed arrangement is based on a released SLK-B09 drawing, a site-developed template, or a manufacturer-supplied installation guide.

The bidder must identify unresolved tolerances in the schedule. If the survey is insufficient to verify an interface, the door should remain in clarification status until a sample or site trial establishes the proposed arrangement.

Retrofit-route decision matrix

The preferred retrofit route is the one with traceable evidence, controlled preparation, and an acceptance method. It is not automatically the route requiring the least description. A bidder that proposes extensive work without dimensional evidence has not demonstrated a safer or more complete outcome.

Retrofit routeMinimum prerequisiteEvidence requiredPrincipal risk to resolveBid response
Reuse a prepared mounting zoneReleased, traceable preparation detailOriginal drawings, site verification, and matching dimensionsExisting preparation may differ from the current templateProvide door-by-door confirmation
Install into an existing compatible interfaceIdentified interface with repeatable geometryDetailed survey, interface drawing, and installer confirmationInterface may be suitable in form but wrong in position or clearanceState what is retained and why
Modify the glass or railApproval from the responsible door partyWork method, specialist responsibility, and make-good extentAlteration may be irreversible or outside the lock scopeObtain approval before release
Substitute another lockIdentified alternative and complete technical offerSeparate fit evidence and commercial responseDifferent access or management arrangementsOffer only as an approved alternative
Exclude the openingUnresolved material or interface riskRecorded reason and required corrective actionThe opening remains without the intended lockIdentify corrective action and responsibility

A bidder may combine routes for different door types, but it must not apply a single conclusion to all glass doors. Each excluded or conditional door needs a named owner for the next action. A generic statement that a door is “suitable for retrofit” is not acceptable without dimensions, drawings, and an agreed method.

Glass work and lock work should remain separate disciplines within the method statement. The bidder should identify who makes the opening, who protects and handles the panel, who closes the prepared area, and who inspects the completed interface.

Preparation method statement and hold points

The method statement converts the chosen route into controlled site work. It should start with conditions for starting, list the tools and temporary protections, describe removal and preparation, identify the lock installation sequence, and explain how the door is returned to service. It must identify any special trade needed for glass or frame alteration.

flowchart TD
    A[Survey package received] --> B{All critical fields complete}
    B -->|Yes| C[Desk fit review]
    B -->|No| D[Return incomplete survey]
    C --> E{Retrofit route evidenced}
    E -->|Yes| F[Approve preparation method]
    E -->|No| G[Approve alternate route or no bid]
    F --> H[Release installation work]
    G --> H
    H --> I[Record acceptance evidence]
Hold pointRelease conditionRequired record
Survey acceptanceCritical dimensions and door IDs completeAccepted survey and drawing register
Design clarificationFit route, interface, and responsibilities agreedApproved clarification response
Preparation releaseSite condition matches the approved surveyPre-installation condition photographs
Installation releaseRequired components and specialist work are availableInstallation checklist
Functional releaseOperating and interface checks passTest record linked to the door ID
HandoverAs-built information and deviations are closedHandover pack and asset register

The method must not rely on field improvisation around a critical dimension. Any need to enlarge a fixing, change the panel position, or substitute an interface part should become a recorded deviation before work proceeds.

The bidder should supply the applicable SLK-B09 installation guide revision, dimension drawings, and full datasheet as offered. If the documents do not cover the proposed existing-door arrangement, the bidder must provide a project-specific method and hold point for review.

Door-hardware, power, and operational interfaces

The existing-door review must examine more than the lock position. A proposed panel can fit geometrically while interfering with a closer, an escape device, a held-open arrangement, or the user’s approach to the reader. The bidder should show these interfaces on the same drawing used for dimensional review.

InterfaceInformation required from bidder
Door closerExisting or proposed closer, mounting position, swing effect, and adjustment responsibility
Hold-open devicePresence, location, movement envelope, and any required coordination
Escape deviceExisting arrangement, lever or panic hardware, and interaction with the proposed lock
Handle or leverProjection, return action, spindle position, and clearance
Strike and keeperExisting condition, retained or proposed arrangement, and engagement method
Mechanical emergency accessWhether included in the offered configuration and how it is demonstrated
Power sourceSupply location, connection method, service route, and interruption response
Credential managementConfiguration equipment or software required for the offered access methods
Enclosure environmentThe intended service environment and any condition outside the offer

Because the supplied SLK-B09 record does not populate Power or Platform & network, the bidder must not assume a USB emergency port, wireless gateway, remote function, application interface, or event-history capability. Each item must be identified as included, excluded, unavailable, or subject to confirmation.

The access record names passcode, fingerprint, and 3D face methods. Their availability on the proposed configuration should be evidenced, while the required enrolment, credential-management, maintenance, and handover resources should be stated separately.

CONFIRM-WITH-LOCAL-DOOR-CODE-OWNER: Before hardware alteration, obtain project-specific written confirmation of egress, access-control, fire-door, and site safety obligations from the authority or qualified professional responsible for the opening.

Sample and mock-up qualification

A physical sample or representative mock-up should resolve the interface questions that drawings cannot. For a glass-door project, the sample may need to reproduce the relevant rail, glass edge, fixing surface, handle position, and clearance around the proposed lock. The bidder should explain which features of the mock-up are representative of the actual doors.

Qualification itemRequired response
Sample configurationExact hardware, finishes, brackets, fasteners, and accessories to be supplied
Representative door sectionWhich rail, frame, glass, handle, and closer conditions are reproduced
Installation methodPreparation and fixing sequence used during the trial
Fit resultMeasured clearances and the location of any adaptation
Operating checkAccess method, latch engagement, and relevant door movement
Interference checkHandle, closer, escape device, frame, and adjacent leaf
Evidence packPhotographs, dimensions, test notes, and a list of unresolved issues
Approval statusApproved as a reference, revision required, or rejected

The mock-up should be reviewed by the installer proposed for the project, not only by a sales or design representative. If a mounting template or sample escutcheon is used, record its revision so that later site work does not rely on an obsolete item.

A successful sample does not automatically prove fit at every site location. It establishes a repeatable reference that the surveyor, installer, and acceptance inspector can use. The bidder should explain which variables remain door-specific and how those variables are checked before installation.

The preparation method should also demonstrate make-good, glass protection, and the sequence for returning the door to service after installation. Any temporary arrangement used during the trial should be recorded so it can be corrected before production work.

Installed-door acceptance schedule

Acceptance should link each installed door to the released drawing, preparation record, and operating configuration. Use pass, hold, or fail outcomes, with notes and photographs for anything not passed. An item remains on hold until the missing evidence is supplied and reviewed.

CheckAcceptance methodEvidence retained
Dimensional matchCompare installed position with the accepted drawingMeasurement sheet and photographs
Fixing conditionInspect fixings and prepared interface against the approved methodPreparation and installation checklist
Latch engagementOperate the door through the normal opening cycleDoor-specific test record
Passcode accessEnrol and use a test credentialConfiguration record and test result
Fingerprint accessEnrol and use a test templateConfiguration record and test result
3D face accessEnrol and use a test identityConfiguration record and test result
Emergency accessDemonstrate only if included in the confirmed offerInstruction and test record
Door movementCheck closer, handle, and escape-device interactionJoint interface test record
Power or configuration interruptionDemonstrate the stated service responseProcedure and observed result
DocumentationCompare installed product with the dated document setDocument register
As-built recordCapture final position and retained componentsDoor asset record

The credential workflow should match the selected delivery model. Configuring SLK-B09: Credential Choices and Management Tools provides a framework for comparing enrolment and management choices. It does not replace the bidder’s project-specific configuration record or the acceptance test at the installed door.

Do not require an event log, remote function, or software feature unless it is included in the confirmed offer. Conversely, do not allow a generic handover certificate to cover a door-specific defect. Each failed check needs a corrective action, an owner, and a retest record before the opening is accepted.

Clarification, deviation, and substitution control

A deviation is any departure from the bid requirement, the accepted survey, the released drawing, or the proposed installation method. Deviations should be numbered and cross-referenced to the affected door ID and requirement. “Subject to site conditions” is not an adequate response where the bidder has been required to complete the survey.

Control recordRequired information
Clarification questionExact requirement affected, site evidence, and proposed interpretation
Bidder responseAgreed answer or a clearly identified unresolved issue
Deviation entryOriginal requirement, proposed change, and affected doors
Fit consequenceEffect on dimensions, interfaces, preparation, or acceptance
Commercial consequenceIdentified effect stated in the separate approved quotation
Substitution entryOffered item, reason, full technical evidence, and approval status
Distribution recordAll bidders receive the same issued clarification

Use a controlled question-and-answer register with dated issues. The procurement manager should distinguish information that clarifies the bid from a change to the bid. Material changes should be acknowledged by every bidder before submission or carried as an explicit condition of their offer.

No unresolved deviation should disappear into the installation method. If a bidder proceeds after clarification, the acceptance record must link back to the approved answer. If a condition remains unresolved, retain the door-specific hold rather than transferring the risk to the facilities team after handover.

Evaluation method for fit, risk, and completeness

Use a two-stage evaluation. First apply the fit gate to every offered door and door group. A drawing gap, unresolved interface, or unsupported preparation method should be recorded as a risk even if the commercial response is favourable. Second, compare the bids using pre-agreed criteria and the evidence attached to each response.

Evaluation criterionEvidence examinedTreatment in recommendation
Survey completenessCompleted door schedule, photographs, and field measurementsReject incomplete critical information
Dimensional fitDrawings and interface comparisonPass or hold by door
Preparation methodSequence, specialist inputs, and hold pointsAssess completeness and control
Existing-hardware interfaceCloser, handle, escape device, and access arrangementRecord unresolved conflicts
Operational arrangementCredential, power, and configuration responseMatch the confirmed offer only
DocumentationDrawing, guide, datasheet, and revision scheduleIdentify missing or stale documents
DeliverabilityNamed parties and site controlsIdentify conditional exclusions
Commercial completenessSeparate approved quotationCompare only like-for-like scope

Set the weighting for non-critical criteria before opening the offers. Keep dimensional fit, safety of alteration, and required interface information as pass-or-hold items so a score cannot conceal missing evidence. The weighting sheet should name the evaluator and approval authority.

The recommendation should list approved openings, conditionally approved openings, excluded openings, and the evidence still required for each. It should also identify which bidder assumptions require written confirmation. Do not combine different preparation scopes into one averaged score.

Any commercial comparison should use the approved quotation route at Request a Quote. Keep the technical and commercial schedules linked by door ID so that a lower response is not evaluated against a broader or narrower physical scope.

Bid submission index and release instruction

The bidder should return the technical package as one controlled file with a page-level index. Every schedule, drawing, photograph, and deviation reference must carry the same project and door identifiers. Unmarked attachments should be returned for clarification rather than manually matched by the evaluator.

The same question is worked through in more detail in smart lock price by customization. That is the same question slk b09 door fit notes has to answer here.

Submission componentIncluded or not applicableReference and revision
Signed technical offer and authorised contact[ ][Bidder entry]
Completed door and survey schedule[ ][Bidder entry]
Dimensioned door and interface drawings[ ][Bidder entry]
Retrofit-route decision by opening[ ][Bidder entry]
Preparation and installation method statement[ ][Bidder entry]
Sample or mock-up plan and findings[ ][Bidder entry]
Acceptance schedule and test-record template[ ][Bidder entry]
Clarification and deviation registers[ ][Bidder entry]
Offered document and accessory schedule[ ][Bidder entry]
Separate approved commercial response[ ][Bidder entry]

Release these slk b09 door fit notes with the request for quotation, the door schedule, and the bidder’s return instructions. The procurement manager can then compare actual door evidence, preparation scope, and acceptance commitments rather than relying on a product description alone.

The repeat-order and project-control sequence can be completed through the SLK-B09 Order Checklist for Project and Repeat Purchases.