SLK-B09 on an Existing Door: Fit, Preparation and Retrofit
This bid sheet turns the subject of an existing glass-door installation into a measurable tender response. It is built around the slk b09 door fit notes a Procurement Manager needs before accepting a supplier’s claim of fit. The document separates published product information from site facts that each bidder must measure and evidence. It also reserves a route for a no-bid where the proposed preparation cannot be made technically clear.
Direct answer. The short answer is that slk b09 door fit notes is not one decision. It is a sequence. This article takes slk b09 door fit notes from slk b09 door fit notes through slk-b09 to the record you keep. A slk b09 door fit notes treats one component on its own terms. slk b09 door fit notes names the tests that close it. slk b09 door fit notes is not accepted on a headline figure.
slk b09 door fit notes is used here in the sense given under slk b09 door fit notes. It is a working definition of slk b09 door fit notes that carries no regulatory weight. The buyer still has to check it against the dated product page.
- Confirm the feature — confirm on the dated product page for the specific SKU behind slk b09 door fit notes
- Confirm the constraint — record where the technology in slk-b09 stops working
- Confirm the contingency — name the mechanical path that remains if slk b09 door fit notes fails
- slk b09 door fit notes runs this sequence, and slk b09 is the record it produces.
Use the blanks as mandatory response fields. A completed answer must identify the door, the proposed SLK-B09 arrangement, retained and removed components, preparation work, installer method, and acceptance evidence. Any dimension used in a purchasing decision must be confirmed on the dated product page for the specific SKU.
Bid instrument control and offer boundary
Issue this sheet with the request for quotation and require the bidder to return one completed package for every door or door group included in the offer. A photograph, catalogue description, or nominal door schedule cannot establish site-specific fit. The bidder must mark each dimensional or operational item as measured, confirmed by the installer, or still unresolved.
| Control item | Required bidder entry |
|---|---|
| Project and opening reference | Project name, building, floor, room or zone, and unique door ID |
| Offered product | SLK-B09 and the exact proposed configuration |
| Door status | Existing door, existing glass panel, or separately supplied door |
| Offer type | Direct installation, retrofit, alternate product, or door excluded |
| Drawings | Dimensioned survey drawings keyed to the door IDs |
| Installation method | Preparation sequence, specialist work, and proposed hold points |
| Deviations | Every departure from this bid sheet, listed separately |
| Clarifications | Unresolved technical questions and required response dates |
| Authorised contact | Named technical contact with responsibility for the offer |
The offer boundary must distinguish hardware supply from site preparation. State separately who removes existing hardware, modifies the glass or frame, supplies replacement parts, makes good finishes, installs the lock, configures credentials, and completes handover. Any door that cannot be covered by the bidder’s documented method must be identified before award rather than carried as an unqualified assumption.
Bidder substitutions require written approval. A proposed alternative lock may be offered as a separate line against the same opening, but it must not silently replace the SLK-B09 in the primary schedule.
What the catalogue record establishes—and leaves open
The published record identifies SLK-B09 as a Face Recognition Smart Lock for Double Glass Office Doors. Its Access fields record Passcode: Standard, Fingerprint: Standard, and 3D face: Standard. Its Body & panel field records Style: Glass Door Smart Lock. Platform & network, Power, and Door fit are recorded as unavailable entries in the supplied catalogue record.
That boundary is central to this tender. The product description indicates the intended door context, but it does not provide a dimensional compatibility schedule. The bidder must not derive panel dimensions, fixing centres, door thickness, backset, power arrangement, or glass-preparation requirements from the model name.
| Published item | Permitted use in this tender | Required bidder response |
|---|---|---|
| Access: Passcode, fingerprint and 3D face listed as Standard | Defines the access methods to describe in the offer | State configuration, enrolment process, and operating dependencies |
| Style: Glass Door Smart Lock | Identifies the product format | Provide a dimensioned installation drawing and door interface |
| Platform & network entry unavailable | No connectivity assumption may be made | State the control arrangement and any interface dependencies |
| Power entry unavailable | No power source or emergency arrangement may be assumed | State supply, servicing, and interruption arrangements |
| Door fit entry unavailable | No dimensional fit may be inferred | Supply measured site evidence and the proposed fit method |
| Documentation available on request | The bidder should identify the exact issue it will supply | List drawing, guide, datasheet, and revision details |
| OEM/ODM project options listed | Permits a project-order discussion | Define which options are included in the submitted offer |
The catalogue also records dimension drawings, an installation guide, and a full datasheet as available on request, together with project-order options for logo, finish, packaging, manuals, and product configuration. Confirm on the dated product page for the specific SKU before making any of these part of the contractual offer.
The review method in SLK-B09: Reading the Published Specification Without Guesswork is useful when checking the bidder’s technical attachment against the catalogue. The bidder should attach the dated document issue it intends to supply and identify every field that remains subject to confirmation.
Existing-door survey schedule for each opening
Survey the actual door rather than relying on the architectural schedule. Record both overall door geometry and the local mounting interface. Measurements should identify the unit used, the datum from which each value was taken, and whether the value was measured directly or copied from an identified drawing.
A complete smart lock retrofit site survey should distinguish a nominal opening from an installed condition. Existing frames can move, glass can sit differently from the drawing, and added hardware can alter the usable space. The surveyor should note discrepancies instead of reconciling them without evidence.
| Survey field | Response required for each door |
|---|---|
| Door ID and active leaf | Exact identifier and which leaf is active |
| Door opening direction | Record inside and outside viewing directions |
| Overall leaf dimensions | Width, height, thickness, and measurement unit |
| Glass and visible panel | Visible width, height, and panel arrangement |
| Rail or frame sections | Width, depth, face position, and available fixing zone |
| Existing mounting hardware | Lock, patch fitting, keeper, screws, and adhesive residue |
| Handle and interface locations | Handle, spindle, cylinder, latch, and strike positions where present |
| Fixing centres | Existing centres and proposed centres if different |
| Door closer and other interfaces | Make, model where visible, mounting points, and swing effect |
| Floor and wall clearances | Threshold, floor finish, adjacent wall, and service access |
| Obstruction record | Handles, frames, readers, cabling, and adjacent equipment |
| Photographic record | Overall views plus close-ups keyed to the survey drawing |
The double glass door lock fit check should include a physical trial at the proposed lock position rather than a tape measurement alone. Place the proposed panel or template against the door, check the approach to the reader, and record interference with the handle, door swing, or adjacent leaf.
Use the Smart Lock Retrofit Site Survey for a complementary measurement prompt. The Office Smart Lock Site Survey provides an office-context survey structure, while the opening schedule must still reflect the actual glass doors supplied for this project.
Where the glass supplier holds the original door record, the bidder should compare it with the site measurement and highlight differences. Unexplained differences become clarification items, not values to average or round away.
Critical fit dimensions to require from bidders
The bidder’s drawing must connect the SLK-B09 installation envelope to the measured door. It should state minimum, maximum, and target dimensions where a range is meaningful. A single nominal dimension is insufficient when the retained interface can vary across the door schedule.
The glass door lock dimension worksheet should also identify the inspection method. It should state whether a dimension was taken from the glass, rail, frame, patch fitting, or proposed template and whether the result includes the fixing hardware.
| Fit-critical item | Drawing and schedule requirement |
|---|---|
| Lock panel envelope | Length, width, depth, and position relative to the door datum |
| Fixing centres | Centre-to-centre dimensions, hole sizes, and edge clearances |
| Glass or rail interface | Contact zone, available flat area, and any edge or frame constraint |
| Handle and spindle interface | Axis location, projection, and clearance around the proposed panel |
| Latch and strike geometry | Functional relationship to the existing or proposed strike and keeper |
| Cylinder interface | Existing cylinder position and any proposed replacement arrangement |
| Operating-side clearance | Approach, hand, reader use, and door swing at the active leaf |
| Service access | Battery, wiring, configuration, and maintenance access where applicable |
| Existing component removal | Extent of retained parts and resulting make-good requirement |
| Installation datum | Fixed reference used for every door in the same type group |
A complete SLK-B09 glass door retrofit statement should identify which dimensions are fixed by the supplied product and which are controlled by the door fabric. It should also say whether the proposed arrangement is based on a released SLK-B09 drawing, a site-developed template, or a manufacturer-supplied installation guide.
The bidder must identify unresolved tolerances in the schedule. If the survey is insufficient to verify an interface, the door should remain in clarification status until a sample or site trial establishes the proposed arrangement.
Retrofit-route decision matrix
The preferred retrofit route is the one with traceable evidence, controlled preparation, and an acceptance method. It is not automatically the route requiring the least description. A bidder that proposes extensive work without dimensional evidence has not demonstrated a safer or more complete outcome.
| Retrofit route | Minimum prerequisite | Evidence required | Principal risk to resolve | Bid response |
|---|---|---|---|---|
| Reuse a prepared mounting zone | Released, traceable preparation detail | Original drawings, site verification, and matching dimensions | Existing preparation may differ from the current template | Provide door-by-door confirmation |
| Install into an existing compatible interface | Identified interface with repeatable geometry | Detailed survey, interface drawing, and installer confirmation | Interface may be suitable in form but wrong in position or clearance | State what is retained and why |
| Modify the glass or rail | Approval from the responsible door party | Work method, specialist responsibility, and make-good extent | Alteration may be irreversible or outside the lock scope | Obtain approval before release |
| Substitute another lock | Identified alternative and complete technical offer | Separate fit evidence and commercial response | Different access or management arrangements | Offer only as an approved alternative |
| Exclude the opening | Unresolved material or interface risk | Recorded reason and required corrective action | The opening remains without the intended lock | Identify corrective action and responsibility |
A bidder may combine routes for different door types, but it must not apply a single conclusion to all glass doors. Each excluded or conditional door needs a named owner for the next action. A generic statement that a door is “suitable for retrofit” is not acceptable without dimensions, drawings, and an agreed method.
Glass work and lock work should remain separate disciplines within the method statement. The bidder should identify who makes the opening, who protects and handles the panel, who closes the prepared area, and who inspects the completed interface.
Preparation method statement and hold points
The method statement converts the chosen route into controlled site work. It should start with conditions for starting, list the tools and temporary protections, describe removal and preparation, identify the lock installation sequence, and explain how the door is returned to service. It must identify any special trade needed for glass or frame alteration.
flowchart TD
A[Survey package received] --> B{All critical fields complete}
B -->|Yes| C[Desk fit review]
B -->|No| D[Return incomplete survey]
C --> E{Retrofit route evidenced}
E -->|Yes| F[Approve preparation method]
E -->|No| G[Approve alternate route or no bid]
F --> H[Release installation work]
G --> H
H --> I[Record acceptance evidence]
| Hold point | Release condition | Required record |
|---|---|---|
| Survey acceptance | Critical dimensions and door IDs complete | Accepted survey and drawing register |
| Design clarification | Fit route, interface, and responsibilities agreed | Approved clarification response |
| Preparation release | Site condition matches the approved survey | Pre-installation condition photographs |
| Installation release | Required components and specialist work are available | Installation checklist |
| Functional release | Operating and interface checks pass | Test record linked to the door ID |
| Handover | As-built information and deviations are closed | Handover pack and asset register |
The method must not rely on field improvisation around a critical dimension. Any need to enlarge a fixing, change the panel position, or substitute an interface part should become a recorded deviation before work proceeds.
The bidder should supply the applicable SLK-B09 installation guide revision, dimension drawings, and full datasheet as offered. If the documents do not cover the proposed existing-door arrangement, the bidder must provide a project-specific method and hold point for review.
Door-hardware, power, and operational interfaces
The existing-door review must examine more than the lock position. A proposed panel can fit geometrically while interfering with a closer, an escape device, a held-open arrangement, or the user’s approach to the reader. The bidder should show these interfaces on the same drawing used for dimensional review.
| Interface | Information required from bidder |
|---|---|
| Door closer | Existing or proposed closer, mounting position, swing effect, and adjustment responsibility |
| Hold-open device | Presence, location, movement envelope, and any required coordination |
| Escape device | Existing arrangement, lever or panic hardware, and interaction with the proposed lock |
| Handle or lever | Projection, return action, spindle position, and clearance |
| Strike and keeper | Existing condition, retained or proposed arrangement, and engagement method |
| Mechanical emergency access | Whether included in the offered configuration and how it is demonstrated |
| Power source | Supply location, connection method, service route, and interruption response |
| Credential management | Configuration equipment or software required for the offered access methods |
| Enclosure environment | The intended service environment and any condition outside the offer |
Because the supplied SLK-B09 record does not populate Power or Platform & network, the bidder must not assume a USB emergency port, wireless gateway, remote function, application interface, or event-history capability. Each item must be identified as included, excluded, unavailable, or subject to confirmation.
The access record names passcode, fingerprint, and 3D face methods. Their availability on the proposed configuration should be evidenced, while the required enrolment, credential-management, maintenance, and handover resources should be stated separately.
CONFIRM-WITH-LOCAL-DOOR-CODE-OWNER: Before hardware alteration, obtain project-specific written confirmation of egress, access-control, fire-door, and site safety obligations from the authority or qualified professional responsible for the opening.
Sample and mock-up qualification
A physical sample or representative mock-up should resolve the interface questions that drawings cannot. For a glass-door project, the sample may need to reproduce the relevant rail, glass edge, fixing surface, handle position, and clearance around the proposed lock. The bidder should explain which features of the mock-up are representative of the actual doors.
| Qualification item | Required response |
|---|---|
| Sample configuration | Exact hardware, finishes, brackets, fasteners, and accessories to be supplied |
| Representative door section | Which rail, frame, glass, handle, and closer conditions are reproduced |
| Installation method | Preparation and fixing sequence used during the trial |
| Fit result | Measured clearances and the location of any adaptation |
| Operating check | Access method, latch engagement, and relevant door movement |
| Interference check | Handle, closer, escape device, frame, and adjacent leaf |
| Evidence pack | Photographs, dimensions, test notes, and a list of unresolved issues |
| Approval status | Approved as a reference, revision required, or rejected |
The mock-up should be reviewed by the installer proposed for the project, not only by a sales or design representative. If a mounting template or sample escutcheon is used, record its revision so that later site work does not rely on an obsolete item.
A successful sample does not automatically prove fit at every site location. It establishes a repeatable reference that the surveyor, installer, and acceptance inspector can use. The bidder should explain which variables remain door-specific and how those variables are checked before installation.
The preparation method should also demonstrate make-good, glass protection, and the sequence for returning the door to service after installation. Any temporary arrangement used during the trial should be recorded so it can be corrected before production work.
Installed-door acceptance schedule
Acceptance should link each installed door to the released drawing, preparation record, and operating configuration. Use pass, hold, or fail outcomes, with notes and photographs for anything not passed. An item remains on hold until the missing evidence is supplied and reviewed.
| Check | Acceptance method | Evidence retained |
|---|---|---|
| Dimensional match | Compare installed position with the accepted drawing | Measurement sheet and photographs |
| Fixing condition | Inspect fixings and prepared interface against the approved method | Preparation and installation checklist |
| Latch engagement | Operate the door through the normal opening cycle | Door-specific test record |
| Passcode access | Enrol and use a test credential | Configuration record and test result |
| Fingerprint access | Enrol and use a test template | Configuration record and test result |
| 3D face access | Enrol and use a test identity | Configuration record and test result |
| Emergency access | Demonstrate only if included in the confirmed offer | Instruction and test record |
| Door movement | Check closer, handle, and escape-device interaction | Joint interface test record |
| Power or configuration interruption | Demonstrate the stated service response | Procedure and observed result |
| Documentation | Compare installed product with the dated document set | Document register |
| As-built record | Capture final position and retained components | Door asset record |
The credential workflow should match the selected delivery model. Configuring SLK-B09: Credential Choices and Management Tools provides a framework for comparing enrolment and management choices. It does not replace the bidder’s project-specific configuration record or the acceptance test at the installed door.
Do not require an event log, remote function, or software feature unless it is included in the confirmed offer. Conversely, do not allow a generic handover certificate to cover a door-specific defect. Each failed check needs a corrective action, an owner, and a retest record before the opening is accepted.
Clarification, deviation, and substitution control
A deviation is any departure from the bid requirement, the accepted survey, the released drawing, or the proposed installation method. Deviations should be numbered and cross-referenced to the affected door ID and requirement. “Subject to site conditions” is not an adequate response where the bidder has been required to complete the survey.
| Control record | Required information |
|---|---|
| Clarification question | Exact requirement affected, site evidence, and proposed interpretation |
| Bidder response | Agreed answer or a clearly identified unresolved issue |
| Deviation entry | Original requirement, proposed change, and affected doors |
| Fit consequence | Effect on dimensions, interfaces, preparation, or acceptance |
| Commercial consequence | Identified effect stated in the separate approved quotation |
| Substitution entry | Offered item, reason, full technical evidence, and approval status |
| Distribution record | All bidders receive the same issued clarification |
Use a controlled question-and-answer register with dated issues. The procurement manager should distinguish information that clarifies the bid from a change to the bid. Material changes should be acknowledged by every bidder before submission or carried as an explicit condition of their offer.
No unresolved deviation should disappear into the installation method. If a bidder proceeds after clarification, the acceptance record must link back to the approved answer. If a condition remains unresolved, retain the door-specific hold rather than transferring the risk to the facilities team after handover.
Evaluation method for fit, risk, and completeness
Use a two-stage evaluation. First apply the fit gate to every offered door and door group. A drawing gap, unresolved interface, or unsupported preparation method should be recorded as a risk even if the commercial response is favourable. Second, compare the bids using pre-agreed criteria and the evidence attached to each response.
| Evaluation criterion | Evidence examined | Treatment in recommendation |
|---|---|---|
| Survey completeness | Completed door schedule, photographs, and field measurements | Reject incomplete critical information |
| Dimensional fit | Drawings and interface comparison | Pass or hold by door |
| Preparation method | Sequence, specialist inputs, and hold points | Assess completeness and control |
| Existing-hardware interface | Closer, handle, escape device, and access arrangement | Record unresolved conflicts |
| Operational arrangement | Credential, power, and configuration response | Match the confirmed offer only |
| Documentation | Drawing, guide, datasheet, and revision schedule | Identify missing or stale documents |
| Deliverability | Named parties and site controls | Identify conditional exclusions |
| Commercial completeness | Separate approved quotation | Compare only like-for-like scope |
Set the weighting for non-critical criteria before opening the offers. Keep dimensional fit, safety of alteration, and required interface information as pass-or-hold items so a score cannot conceal missing evidence. The weighting sheet should name the evaluator and approval authority.
The recommendation should list approved openings, conditionally approved openings, excluded openings, and the evidence still required for each. It should also identify which bidder assumptions require written confirmation. Do not combine different preparation scopes into one averaged score.
Any commercial comparison should use the approved quotation route at Request a Quote. Keep the technical and commercial schedules linked by door ID so that a lower response is not evaluated against a broader or narrower physical scope.
Bid submission index and release instruction
The bidder should return the technical package as one controlled file with a page-level index. Every schedule, drawing, photograph, and deviation reference must carry the same project and door identifiers. Unmarked attachments should be returned for clarification rather than manually matched by the evaluator.
The same question is worked through in more detail in smart lock price by customization. That is the same question slk b09 door fit notes has to answer here.
| Submission component | Included or not applicable | Reference and revision |
|---|---|---|
| Signed technical offer and authorised contact | [ ] | [Bidder entry] |
| Completed door and survey schedule | [ ] | [Bidder entry] |
| Dimensioned door and interface drawings | [ ] | [Bidder entry] |
| Retrofit-route decision by opening | [ ] | [Bidder entry] |
| Preparation and installation method statement | [ ] | [Bidder entry] |
| Sample or mock-up plan and findings | [ ] | [Bidder entry] |
| Acceptance schedule and test-record template | [ ] | [Bidder entry] |
| Clarification and deviation registers | [ ] | [Bidder entry] |
| Offered document and accessory schedule | [ ] | [Bidder entry] |
| Separate approved commercial response | [ ] | [Bidder entry] |
Release these slk b09 door fit notes with the request for quotation, the door schedule, and the bidder’s return instructions. The procurement manager can then compare actual door evidence, preparation scope, and acceptance commitments rather than relying on a product description alone.