A terminal chokepoints checklist for smart lock importers, with six checkpoints from container closure to collection and the evidence each one needs.

Diperbarui pada: Jan 16, 2024

Terminal Chokepoints Checklist for Smart Lock Buyers

Terminal Chokepoints Checklist for Smart Lock Buyers

The cost question behind terminal chokepoints checklist is really a list of drivers, and the sections below take them one at a time. Editorial checklist. Six checkpoints across the terminal part of a shipment, the evidence each one closes on, and the questions that properly belong to the broker, the forwarder and the terminal itself.

Direct answer. Smart lock cargo stops in more places than a factory gate and a customer's loading bay, and the least forgiving of them is the terminal. By the time a container of locks reaches one, most commercial decisions have already been taken: the model, the finish, the packing, the price, the delivery term, the route. What remains is a series of physical and administrative acts performed by parties the buyer has never met, under rules published by a terminal and an authority the buyer does not control. The buyer arrives at that moment holding one asset

Chokepoint is a logistics word with a precise sense here. A terminal chokepoint is any point in the movement of the goods where one actor can stop the cargo for a reason of its own, and where that reason does not have to be anybody's fault. The customs authority can ask for a second look at the contents. The terminal can hold a container because a document has not arrived or a charge has not been settled. A carrier can decline to hand over the transport document until it is instructed. A description on the invoice can fail to match what the surveyor finds in the carton. None of these are disputes. They are ordinary operations that happen to have your shipment inside them, and an unprepared buyer pays for them in days rather than in money.

This checklist is built backwards from that moment. It works in six checkpoints, arranged in the order they bite, and each checkpoint has the same four parts: the question that has to be answered, the evidence that closes it, the role that answers it, and what it means when the answer is not yet on file. A checkpoint is closed when the evidence is on file with a name and a date against it, never because the question was asked.

Three things are deliberately missing from the text. No duty rate, no tariff percentage, no storage charge and no terminal allowance appears below, because each belongs to the authority, the terminal or the broker for the specific consignment. No classification answer is offered either, because that is a determination made on the facts of the particular product by the authority. Where a number is needed, the checklist names the party who holds it and the form the answer takes.

Nothing here is legal advice. It is a working method for an importing team to discuss with its broker and its own counsel before a purchase order is signed, not a position ready to sign. Any project described below is an illustrative scenario assembled from common buyer experience; it names no customer, supplier or company and describes no real consignment.

CONFIRM-WITH-CUSTOMS-BROKER: no figure in this page states what a shipment will cost, what it will be charged, or which heading its goods take. Rates, allowances, charge bases and classification are confirmed per consignment, in writing, before the entry is filed.

Why the Terminal Is Where Your Programme Becomes Somebody

A terminal is a shared queue with published rules and heavy traffic, and your container is one unit in it. The people running that queue decide about your box in minutes, with no interest in your installation date, your client's opening or the crew you have already booked. That asymmetry is the whole problem. A pause of half a day costs the terminal nothing; half a day costs a programme with a fixed date attached to it.

The useful conclusion is not that terminals are hostile. It is that the decisions which cause the pause have to be taken earlier, by you, while they are still cheap to change. Once the container is closed, the description of the goods is a fact on paper. Once the container is gated in, the consignee is a fact on a system. Once the box is opened, the count is a fact on a report. Each of those decisions was a choice at an earlier point, and each one is now expensive to revisit. The product family this applies to is the smart door locks.

So the checklist runs backwards from the terminal towards the factory gate. It asks, at each point, what can still be influenced, and what has already hardened into a fact.

DecisionWho holds it before the container is closedWho holds it once the container is at the terminalWhy the handover point matters
The delivery place named on the contractYou and the supplierNobody reopens itA term without a named place decides nothing, so the paperwork inherits the ambiguity
The description of the goodsYou and the supplierThe broker files it and the authority reads itThe words on the invoice are the words an examination is compared against
Who is named as consigneeYou and the supplierThe terminal bills itThe terminal's charges land on the party named in the transport document
Whether a cell travels with the goodsYou and the supplierThe carrier checks itThe declaration has to match what is physically in the carton
When the box may be movedYouThe terminal schedules itA position in a yard queue is not a delivery date
Who pays if the box is openedUsually unsettledSettled by contract, or not at allUnsettled means the argument happens under time pressure, at the terminal

The last row is the one worth dwelling on. Opening a container is not a hostile act; it is routine, and often scheduled. What is unusual is opening your container with nobody having agreed in advance who carries the handling and the repacking. That question belongs in the purchase documents, and this checklist treats it as a checkpoint rather than an incident.

The Six Checkpoints in One View

The six checkpoints follow the container's physical position rather than the shipment's paperwork sequence, because the physical position is what determines what is still possible.

stateDiagram-v2
    [*] --> BoxShut
    BoxShut : Checkpoint 1 container closed at the supplier gate
    GateIn : Checkpoint 2 gate in seal and condition record
    Queued : Checkpoint 3 waiting period and the running clock
    Opened : Checkpoint 4 the box is opened on instruction
    Released : Checkpoint 5 released and collected
    Frozen : Checkpoint 6 the shipment will not move
    BoxShut --> GateIn : arrival notice received and matched
    GateIn --> Queued : condition record accepted and no query open
    GateIn --> Opened : examination ordered before release
    Queued --> Opened : opened for a count or a physical check
    Queued --> Released : release order accepted and charges settled
    Opened --> Queued : findings recorded and carton repacked
    Opened --> Frozen : finding that no answer can close
    Frozen --> Queued : answer filed and the hold lifted
    Released --> [*]

The loop between the waiting state and the opened state surprises first-time importers. An instruction to open the box rarely ends the shipment; it produces a count, a repack, a new seal and a revised document set, after which the box returns to the queue. Buyers often treat the examination as the end of the delay. It is more often the middle of it, and the repacking turns an inspection into a second one, because the repacked carton no longer matches the filed packing list.

Run the checkpoints three times rather than once. Run the first two before the container is closed, because those are the only ones where a change costs nothing. Run checkpoint three on a fixed daily rhythm while the box waits. Run checkpoints four and five on the day the box is opened and the day it leaves. A checklist run once, at the end, is a record of what happened. A checklist run three times is a control.

Checkpoint 1 — The Last Hour Before the Box Is Shut

This is the last hour at the warehouse, when the container is being stuffed and every document is being printed at the same time. It is the cheapest hour in the entire chain and the one most often spent on autopilot, because the goods are made, the money has moved and the pressure is to close the box.

Eight checks belong to that hour, and each is a precondition for something that happens thousands of kilometres later.

CheckThe question it answersEvidence that closes itWho holds the answer
The description on the invoiceIs the article described on the paper the article in the carton?The invoice description plus the product fact sheet for that exact model, confirm on the dated product pageSupplier, checked by the importer
The line to carton mappingDoes every invoice line tie to a carton count, a model reference and a weight?The packing list with carton count, model references, gross and net weightSupplier
Free-standing cellsIs any battery or cell packed loose alongside the goods?The carton contents list, and the cell test summary the carrier accepts for the cell actually fittedSupplier and forwarder
Marks and legibilityCan a handler identify every package without opening it?A marking photograph of a sample package against the forwarder's requirementSupplier
The seal number at loadingWhich seal was on the box when it left the gate?The stuffing or loading record showing the number, countersignedSupplier or freight forwarder
The consignee and notify partyWho is named as consignee, and who receives the arrival notice?The transport document draft showing the consignee, the notify party and the release instructionForwarder
The release instructionWill the box be released against the original document or on the carrier's authority?The carrier's written release instruction, held before arrivalForwarder and carrier
The physical countHow many cartons and units actually went in?A carton-by-carton count against the packing list, signedSupplier

The count row has the longest tail. A count taken at the loading gate is evidence in every later dispute — at gate-in, at examination, at delivery, and years afterwards over which units came from which batch. A count reconstructed from memory after a shortage is weaker, because the person recalling it is recalling a packing list rather than a yard.

The cells row carries weight for a different reason. A smart lock that arrives with batteries already fitted is a different shipment from one that arrives without, and the carrier's paperwork has to describe what is actually in the box. The evidence that closes this check is the test summary for the specific cell fitted in the specific model, with the forwarder confirming which summary the carrier takes. Nothing about a product's compliance status is asserted here; it is a question about the cell in that carton, answered from the supplier's own record.

CONFIRM-PER-SUPPLIER: ask the supplier to confirm, in writing and per model, which cell is fitted and whether it ships inside the lock carton or as a separate packed item. Ask the forwarder which declaration and which summary the carrier requires for that cell. Two answers, both on the record, close the check.

Checkpoint 2 — Gate-In, Seal and the Condition Record

Gate-in is the moment the container leaves the vessel's custody and enters the terminal's. It is also the only moment at which the container's condition is cheap to establish, because the box has not yet been moved, shifted or opened.

Everything in this checkpoint is evidence that expires. The seal number can be photographed now and never again. The condition of the doors and the corner castings can be recorded now and never again. Once the box is in the yard and has been shunted, the question of what condition it arrived in becomes an argument rather than a record.

CheckThe question it answersEvidence that closes itWho holds the answer
The arrival noticeWho received it, and does it carry the container number and the seal number?The notice itself, with the name of the person who received itForwarder
The seal matchDoes the seal at gate-in equal the seal recorded at loading?Gate-in photographs against the loading recordTerminal, verified by your inspector
Corner marks and door conditionWhat did the corners, doors, hinges and locking bars look like on arrival?Photographs of each, taken before the box is movedTerminal
The terminal condition recordWhat did the terminal itself write down at gate-in?A copy of that record in your own file, requested the same dayTerminal
Discrepancy noticesHas a short-land, over-weight or seal discrepancy been issued?The notice, its text and the date it was issuedTerminal and carrier
The free-time positionWhen did the clock start, and what allowance applies to this box?The terminal's published allowance, confirmed in writingCONFIRM-WITH-CUSTOMS-BROKER
The person who can authorise a moveWho can order a release, a re-delivery or an examination?A named contact with a tested number, written into the shipment fileForwarder
Where the box is parkedWhere is it, and is it likely to be shifted?The daily yard status from the terminalTerminal

Two rows carry more weight than the others. The terminal's own condition record is the document the carrier's surveyor will use later if damage or shortage is claimed; a buyer who asks for it on the day of gate-in has it for nothing, and one who asks later often has to approach a different party. The named contact row matters because the terminal does not release cargo to whoever asks. It releases it to the party named as consignee or that party's instructed agent, and the instruction has to exist before it is needed.

CONFIRM-WITH-CUSTOMS-BROKER: the allowance that applies to a container waiting at a terminal, the point from which it starts, and how it is calculated are the terminal's published terms for that port and that period. Get them in writing for the shipment in front of you, and write the date on the copy you file.

Checkpoint 3 — The Waiting Period and the Clock Nobody Reads

Most of the exposure here is accumulated, not caused. Nothing dramatic happens on the third day after discharge. The container is simply still there, and a clock nobody was watching has been running since gate-in.

The daily rhythm is the answer, and it is boring on purpose. One named person, one fixed time each day, one short entry. Three lines are enough: where the box stands, what is blocking it, and who is chasing. The entry does not need to be a narrative; it needs to be dated, because its value is in showing what was known on a given day.

CheckThe question it answersEvidence that closes itWho holds the answer
The daily status checkDid somebody look, and did they write it down?The dated daily logImporter
The two clocksWhich clock is running, the one for the box inside the terminal or the one for the box outside it?The terminal's published terms for each, and where each accrual startsCONFIRM-WITH-CUSTOMS-BROKER
Who receives the chargesWhich party is the terminal billing?The naming on the transport document and the billing instructionForwarder
Outstanding document requestsWhat is the terminal still waiting for, and who is chasing it?A written request list with an owner against each lineImporter and broker
Queries from the authorityWhat was asked, what was sent, and on what date did the answer arrive?The query log, with the authority's own wordingBroker
The examination bookingWhen will the box be opened, and who may attend?The booking confirmation and the attendance rulesBroker
The programme effectWhich installation date moves because of this box?A note in the delivery plan carrying the revised assumptionImporter
Insurer notificationDoes the cover require notice of an interruption or of a claim?The notice conditions in the policy wordingInsurer and broker

The two clocks row is the one buyers get wrong most often. A container standing inside the terminal and a container released to the customer's yard that has not gone back are two different positions, and in most terminals they are governed by two different allowances with two different accrual points. A buyer who assumes that taking the box out of the terminal ends the exposure has simply moved it to a second clock.

The last row belongs to the policy rather than to the terminal, and it is worth keeping in the same file: what does the cover require you to notify, how quickly, and with what detail. Those answers come from the insurer's wording, not from the terminal.

Checkpoint 4 — The Moment Somebody Opens the Box

An examination, a physical count, a scanner request or a spot check all end with the box open and the contents spread across a surface somewhere. The handling risk at that moment is real and it is not the terminal's fault; it is the nature of the operation.

The first question is who may be there. A buyer who wants its own inspector present has to book the attendance in advance, usually has to pay for it, and faces rules that differ by terminal and by the nature of the check. A buyer who assumes an inspector can be summoned on the day will find the box closed by the time it arrives.

CheckThe question it answersEvidence that closes itWho holds the answer
AttendanceCan your own inspector or a third party be present, and on what terms?The booking confirmation and the terminal's attendance rulesBroker
What the check coversIs this a document check, a physical check or a count?The instruction received, in writing, before the box is openedAuthority via the broker
How the box is emptiedIs it unstuffed to a floor, a pallet or a scanner area?The terminal's own practice, confirmed before the dayTerminal
The pack recordWhat was opened, what was counted, and what was put back?The examination report, the count sheet and the photographsTerminal and surveyor
The new sealWhich seal is on the box after it is closed again?The number, photographed, with the timeTerminal
The lot and serial linkWhich cartons and which units came out?The serial and lot list held against that containerImporter
The repacking consequencesHave the palletisation, the labels and the count changed?A revised packing list carrying the new countImporter and terminal
Damage found at the openingWhat was damaged, where, and in how many units?Photographs of each affected carton and unit, plus the countSurveyor, insurer and terminal

An illustrative scenario, and a common shape: a forty-door apartment order ships as three models with a shared controller. Two extra cartons of mortise bodies are added at the warehouse to cover a shortage on an earlier project, and the invoice is never amended because the addition is small and the order was already paid. The box is then opened during a count check, and the count comes back higher than the invoice by two cartons. Nothing is wrong with the goods. Three documents now describe the shipment differently, and the terminal's system, the entry and the packing list cannot be reconciled without a correction that has to be agreed by people who are not in the same room.

The repacking row exists because of this. A box that is opened and repacked rarely goes back exactly as it was: carton labels are replaced, the stack, the count and the weight all change. The revised packing list is the document that keeps the shipment coherent afterwards, and it should be requested as part of the examination rather than days later.

Checkpoint 5 — Release, Collection and the Container Coming Back

Release is where the paperwork ends and the haulier begins, and it is the checkpoint where a small administrative slip produces a full additional day.

Two things decide how quickly a box leaves a terminal: the release instruction, which tells the terminal who may collect, and the settlement of the charges it has raised, which it will not move without. Neither is difficult. Both are easy to leave until the morning of collection.

CheckThe question it answersEvidence that closes itWho holds the answer
The release instructionWhat does the terminal require before it will release this box?The release request and the evidence the terminal acceptsBroker
Settlement of the chargesWhich invoice arrives, who receives it, and how is it approved and paid?The charge invoice and the approval recordImporter
Payment channel safetyAre the bank details on the invoice ones you can verify?A callback to a number already held, before any first paymentImporter
The transport documentIs an original to be presented, or is the release on the carrier's authority?The document couriered and tracked, or the written authorityCarrier and forwarder
The haulier and the slotWhat is the booking reference, who is the driver and what vehicle arrives?The booking confirmationHaulier
The gate-out handoverWhat was on the box as it left, and does the receipt exist?Photographs taken before departure and the gate receipt, filed the same dayDriver, filed by the importer
The empty containerWho returns it, to where, and when does the second clock stop?The release instruction for the equipment and the return referenceForwarder
Terminal equipmentHave the seals, twistlocks and lashing gear been returned at gate-out?The equipment checklist with the return referenceDriver

The payment channel row is there because terminal charges arrive as an invoice from a party the buyer may have never paid before, often while a shipment is stuck. Instructions to pay a new account quickly, from an unfamiliar sender, with a cargo hold running, is the pattern that opportunistic payment fraud follows. The mitigation takes one phone call and it is the cheapest control in this checklist.

The last two rows get forgotten, because they concern the container rather than the goods. A container emptied at the customer's yard and then left there does not stop accruing simply because the goods have gone. And the equipment that came off the container has to go back with it, or the return becomes a separate conversation with the terminal.

Checkpoint 6 — The Shipment That Will Not Move

At some point every importing team meets the container that does not move. The first four hours decide whether it becomes an incident or a delay, because the difference is almost always the speed and form of the response, not the underlying difficulty.

What kind of stop it isThe usual triggerThe first moveThe record that closes it
A documentary queryA mismatch between the entry and the invoice, packing list or transport documentSend the answer pack the same working dayThe query log entry with the answer and its date
A missing original documentRelease is conditional on a paper document that has not arrivedChase the courier and confirm the carrier's authorityThe tracking record and the release confirmation
Charges unpaid or unapprovedThe terminal will not release until the charges are settledApprove and pay on the verified channelThe paid invoice and the release order
An examination pendingThe box is open or queued to be openedConfirm the booking and attendThe examination report and the reseal record
Short-land or seal discrepancyA notice issued at gate-inSurvey, then notify the carrier and the insurerThe survey report and the notice
Congestion or yard spaceThe terminal is holding the box for spaceAsk for the expected slot and the daily planThe daily status and the appointment
A conditional arrangementA deferral or bonded arrangement whose conditions must keep being metConfirm the condition and the review dateThe written confirmation of the condition

The response that works has a fixed shape. One page, in writing, sent to the party who can act: what was asked, in their words; the answer; the evidence attached; and the date. A telephone call that produces nothing in writing leaves the importer with a memory and a container that is still there. A one-page response leaves a dated record the terminal, the carrier or the broker can point to, and it can be reused next shipment.

The escalation that follows has a standard commercial shape: narrow the question, attach the evidence that was not considered, give a date, and move to a person with the exposure attached. A stop with a name, an owner and a date on it is a manageable commercial problem. A stop without those three is a delay that simply happens to you.

CONFIRM-WITH-LOCAL-LEGAL: where a stop touches a contractual remedy, a limitation period, a claim against a carrier or an insurance condition, the consequence is settled with your own counsel in your own jurisdiction. Nothing on this page predicts what any court, tribunal or authority will decide.

What Only a Person on the Ground Can Confirm

Six things in this checklist cannot be read off a document. Each is confirmed by a person standing in front of the container, and they are listed separately because they are where a well-run shipment still goes wrong.

The seal number is the first. It is written on the box, it is read at gate-in, and it is recorded by whoever applies the next seal. A photograph of the number with the door open and the container identifier visible settles a dispute that no amount of paperwork can settle, because the alternative is two written records and no evidence.

The count is the second, and it has to be a count of the physical goods rather than of the cartons. Carton counts are quick and reliable when cartons are intact, and they stop being reliable the moment a carton is opened, and a carton's nominal contents are only as good as the packing list that describes it. For a product where the configuration matters, a reader with its own carton and a controller with its own carton, counting cartons is not counting the saleable units.

The marks are the third. A shipping mark that is faint, or a carton label that has been covered by another label, slows a handler down and invites a decision to open rather than to move. Marks are cheap to print well and expensive to fix in a yard.

The cell is the fourth. Whether a loose battery sits in the carton is visible to anyone who looks into it, and it is the kind of thing that is checked in an examination and reported rather than noticed at loading.

The condition is the fifth, and the condition that matters is the one at gate-in, before anything has moved. Doors, hinges, locking bars, corner castings and the paintwork around the stack are what a surveyor will want to see.

The signature is the sixth, the least technical and the most frequently missing. A count taken over the telephone is not a count. A count confirmed by a photograph of a loaded container is not a count of what is inside it. Someone physically present who has counted and put their name to the count closes more disputes than any other single act in this list.

Scoring a Run: Three Results, Not Two

A checklist that returns pass or fail will be gamed. The middle case is where every real shipment lives: one check is open, the cargo can still move, and the open check has to be carried forward with a name and a date against it. Treat that as a result in its own right, not as a soft pass.

ResultWhat it meansWhat you do nextWho you tell
ClosedEvery check has evidence on file with a name and a date against itMove to the next checkpoint and leave the evidence where it is filedNobody beyond the file
Open with a conditionOne check is outstanding but the cargo can still moveName an owner and a date, and carry the condition on the daily logThe owner, and the client if a date moves
StoppedThe cargo cannot progress and a clock is runningRun the escalation path and price the exposure as your own assumptionThe decision maker who carries the exposure

The scoring rule is one sentence long: a checkpoint closes on evidence, not on assurance. The second half of the rule matters just as much. A condition that is open is only different from a failure if it is visible to somebody who can act, on a date, with the exposure stated. An open condition with no owner is a failure that has not been declared yet, and the programme learns about it later, from the customer.

Score per container rather than per shipment. Several containers mean several positions in the terminal, several sets of seals and several count records, and one being stuck does not mean the others are. A single status for the whole shipment is how a problem stays invisible until the last box is due.

What This Checklist Cannot Answer

Several questions arrive at the terminal and cannot be answered there, and a checklist that pretends otherwise gets ignored by the people who work with it. These are the ones to hand over explicitly.

Classification and valuation belong to the authority, on the facts of the specific product and the specific transaction. The buyer supplies the facts; the broker assembles the position; the authority determines. Origin questions work the same way, including whether a preference scheme applies to a given model on a given route. Terminal allowances, the point from which they start, the charge bases and any storage or handling charge belong to the terminal's published terms for that port and that period. None of these are supplied here, and every one of them is a written answer from the party who owns it.

Question a terminal raisesWho answers itIn what form it has to arrive
Which heading do these goods takeThe customs authority, through your brokerA written assessment per model and configuration, with the scope stated
What is the declared value based onYour broker, on the authority's methodThe filed entry and the supporting documents
Does a preference apply to this model on this routeThe authority, through your brokerA written position naming the scheme and the model
What allowance applies and from whenThe terminal, through your broker or forwarderThe terminal's terms, dated on the day you relied on them
What does the inspection cover and who may attendThe authority and the terminal, through your brokerThe booking confirmation and the written instruction
What happens if a claim period runs outYour own counsel in your own jurisdictionA written opinion on your facts, before the shipment

One further limit is worth stating plainly. Terminal rules, local practice and carrier instructions change, sometimes within a season. A checklist run from a copy of last year's terms is worse than no checklist, because it produces a completed form and a false sense of coverage. Every answer filed from an external party should carry the date and version it came from, and the file should show when it was last reviewed.

CONFIRM-PER-SUPPLIER: anything about the supplier's own operation — whether it will produce a loading or stuffing record, which seal it applies, whether it will count before the box is closed, how it handles a cell in the carton — is the supplier's to state and the buyer's to record. Ask it in writing, at quotation stage, and treat the answer as part of the offer rather than as a courtesy.

Where the Rest of the Terminal Story Sits

The terminal is one part of a longer chain, and the parts around it are covered from their own angles. Use these when the next shipment raises a question this checklist does not answer.

If your next shipment raises thisRead this
Which costs accumulate while the box waitsTerminal Chokepoints Cost Drivers for Smart Lock Shipments
Which documents the terminal and the authority will ask forDocuments Required Because of Terminal Chokepoints
How the recurring failures actually happenTerminal Chokepoints: Three Ways it Goes Wrong
Who carries the risk at each stepTerminal Chokepoints: Who Owns the Risk at Each Step
How the delivery term shapes what happens at the terminalTerminal Chokepoints and Incoterms: How They Interact
What to put to the supplier in writingTerminal Chokepoints Conversation Script for Your Supplier
How the wait moves your datesTiming Dependencies Created by Terminal Chokepoints
What the cover has to answerInsurance Questions Raised by Terminal Chokepoints
What to keep once the container is goneRecords to Keep After Terminal Chokepoints
How the two clocks turn into costDemurrage and Detention Exposure Checklist for Smart Lock Buyers
How the clearance paper is assembledClearance Documentation Bundle Checklist for Smart Lock Buyers
How the cell in the carton is handledLithium Battery Shipment Checklist for Smart Lock Buyers
How the box is packed before it is closedSmart Lock Container Loading Inspection and Smart Lock Pallet Packaging
How the shipment was planned in the first placeSmart Lock Shipment Planning and Smart Lock Import From China

Putting the First Run on the Calendar

Do not wait for a new programme to start using this. The next container is already booked, and the first run is cheap because the shipment already exists: attach each of the six checkpoints to a person and a moment. The loading record and seal number go to the supplier's shipping desk before stuffing. The arrival notice, seal and condition record go to the forwarder on the day of gate-in. The daily log goes to one named person at a fixed time. Examination attendance and the release request go to the broker. The gate-out photographs go to the driver.

The version to hand to other people is shorter than this page. Each party receives the three or four lines that belong to them, with the date their part is due, and the question written as a question rather than an instruction to confirm. The supplier's part is the count, the seal, the carton contents and the cell; the forwarder's is the notice, the release instruction and the contacts; the broker's is the entry, the query log and the booking.

The commercial side follows from that. Ask for the loading record, the carton contents and the cell paperwork at the stage where a specification is still being written, and the first checkpoint becomes a line in a document rather than a rescue. The request a quote route is where the named delivery place, the consignee and the documentation set get written down together before anything is loaded, and order samples is where a first carton can be moved through the same six checkpoints while the volume decision is still open.

CONFIRM-WITH-CUSTOMS-BROKER: the six checkpoints are a working method for your import operation. The figures, the classifications and the local consequences behind them are confirmed per consignment with your broker, your carrier and the terminal, in writing, before the container sails.