SLK-118 Purchase-Order Checklist: What to Confirm Before Ordering
This slk 118 purchase order checklist for project orders converts an approved project scope into release-ready purchase-order clauses. It is designed for a defined hotel or B&B door schedule, not a generic quote request. The SLK-118 is the RFID Card Lock for Hotels and B&Bs, while the SLK-118E is a separate keypad hotel combination lock for wooden doors.
Direct answer. Condensed to the essential point, slk 118 purchase order checklist for project orders turns a request into a decision record. slk 118 purchase order checklist for project orders and slk-118 are the two parts of slk 118 purchase order checklist for project orders most often skipped. A slk 118 purchase order checklist for project orders is a component-level look at how the technology behaves. slk 118 purchase order checklist for project orders is where the limits sit. slk 118 purchase order checklist for project orders is verified on the dated product page.
Do not release a PO that only names a lock. Attach the SKU, finish, door reference, access scope, packing basis, documentation list and approval owner to each applicable line.
Release gate: turn the scope into written clauses
Build the purchase order from approved drawings, the project schedule and the dated product record. For every catalogue-driven entry, confirm on the dated product page for the specific SKU before it becomes contractual.
| Clause | Purchase-order wording | Evidence held before release |
|---|---|---|
| Model | Name the exact SKU and finish on every line. | Dated product-page extract and signed finish selection |
| Door | Assign a door reference and state the required panel, mortise, frame and finish. | Marked door schedule and dimension drawing |
| Access | Name guest card issuance, permission, validity and record functions. | Signed configuration sheet |
| Branding | List logo, finish, packaging and manual deliverables. | Approved artwork and packaging proof |
| Documents | List the drawing, installation guide and datasheet required. | Revision-controlled document list |
| Receipt | State the agreed carton and unit-identification basis. | Final packing list and receiving reference |
This release sequence prevents a partially approved door schedule from becoming an ambiguous factory instruction:
flowchart TD
A[Approved door schedule] --> B[SKU and finish]
B --> C[Door fit and mortise]
C --> D[Access and software scope]
D --> E[Branding and packaging]
E --> F[Final PO release]
F --> G[Production evidence]
Model identity: do not merge the two variants
The catalogue lists SLK-118 and SLK-118E as separate models. Put one exact model reference on each PO line rather than using a family label. For the SLK-118, the recorded access methods are RFID/IC card and a mechanical override. Its platform is hotel lock management software for PC, with a standalone lock and PC-linked card encoder; no in-room network is required.
Use the What the SLK-118 Data Sheet Actually Tells a Buyer to separate recorded functions from assumptions. If the software scope also needs review, use the SLK-118 Credential and Software Configuration Options as the adjacent configuration reference rather than adding unspecified functions to the PO.
Door fit: make every missing field visible
The SLK-118 project order checklist should treat the catalogue’s blank Door fit field as a question, not permission to assume fit. The recorded panel is 242 × 77 × 19 mm and the mortise is No. 2 hotel mortise, but those specifications do not establish compatibility with a particular door.
Require the door schedule to show leaf thickness, frame rebate, backset, handing, strike arrangement and available clearance.
The SLK-118 Door Fit and Replacement Notes for Buyers covers replacement questions. For project-wide hotel lock door fit checks, the Office Smart Lock Site Survey and Smart Lock Retrofit Site Survey provide survey structures that can be added to the purchasing file.
Access and software: state the operating scope
Write the access requirement as a sequence rather than a general promise. For the SLK-118, the catalogue records guest card issuance, floor/room permissions, check-in validity windows and unlock records. The PO should identify which of these functions are required, how the PC-linked card encoder is supplied, and what evidence demonstrates the selected guest card issuance workflow.
Include mechanical override confirmation as a separate acceptance item: identify the required key function and the evidence expected during inspection. Do not infer network operation, extra access methods or reporting functions that are absent from the ordered record.
Power, finish and physical specification
The RFID hotel lock specification records 4 × AA alkaline batteries, a low-battery alert, 201 stainless steel for the material, and Silver or Gold finishes. State the selected finish on the PO and require the inspection reference to match it. Keep power and finish acceptance tied to the exact SKU rather than to a visual approximation.
The same question is worked through in more detail in the smart lock hub. That is the same question slk 118 purchase order checklist for project orders has to answer here.The catalogue does not provide values for capacity, environment or model versions. Do not add claims about operating conditions, user capacity, weather resistance or additional versions unless they appear on the dated product record for the SKU being ordered.
Packing: distinguish catalogue data from custom orders
The recorded carton is 570 × 355 × 346 mm, with 10 units per carton and a gross carton weight of 23.15 kg. These values support receiving and carton planning, but a project-specific packaging instruction may change the final basis. State whether the catalogue packing data applies or whether the PO is governed by a signed custom packing list.
The custom finish packaging approval should cover the logo artwork, finish reference, packaging labels, manual presentation and the evidence format required before production.
Documentation and approval evidence
The catalogue records dimension drawings, an installation guide and a full datasheet available on request. It also records OEM/ODM options for logo, finish, packaging, manuals and product configuration for distributor and project orders.
Convert those items into an attachment schedule containing the document title, revision, language, format, approval owner and required release stage. Require production evidence for approved artwork, the selected finish reference, packaging proof and the access-configuration sheet.
Send the approved scope through Request a Catalog, use Order Samples when physical verification is required, and submit the commercial instruction through Request a Quote.
Final release decision and change control
CONFIRM-WITH-LOCAL-AUTHORITY: Confirm site-specific installation, access-control and inspection requirements with the responsible authority for the project location before PO release.
The hotel lock purchase order is ready only when each decision below has evidence and an accountable approver:
| Decision | Approve when | Hold when |
|---|---|---|
| SKU and finish | The line matches the dated product record and signed finish selection | SLK-118 and SLK-118E are mixed or left unidentified |
| Door fit | Drawings and the marked door schedule cover every ordered opening | Compatibility is inferred from panel size alone |
| Access scope | The card, permission, validity, record and override requirements are written | Functions are described only as “smart lock” features |
| Branding | Artwork, finish and packaging have named approvals | Approval responsibility is blank |
| Documentation | Every required document has an owner and revision rule | “Latest version” is the only acceptance condition |
| Packing | The governing carton and identification method are documented | Standard and custom packing data conflict |
Keep the slk 118 purchase order checklist for project orders attached to the released PO. Any change to SKU, finish, door design, access workflow, carton format or document list should trigger written reapproval before production instructions are issued.