En 1155 smart lock RFQ clause: four drafting lanes for an EN 1155 clause in a smart lock RFQ, compared round by round, with clause text that forces named.

Publicado el: jun. 12, 2023

Electric Hold-Open on a Smart-Locked Door: The EN 1155 Clause, Buyer by Buyer

Electric Hold-Open on a Smart-Locked Door: The EN 1155 Clause, Buyer by Buyer

This article separates what can be shown from what has to be confirmed, and en 1155 smart lock rfq clause is where that line is drawn. A smart lock RFQ line that reads "lock shall be EN 1155 compliant" has already failed, and it failed at the moment it was written. The sentence gives a supplier no way to answer that ends in a document, and it gives the buyer no way to check what came back. What arrives is usually a catalogue page, a certificate for a product nobody is buying, or a declaration signed by a company that has never had a sample tested.

Direct answer. In brief, this article covers en 1155 smart lock rfq clause from en 1155 smart lock rfq clause to en-1155. It states what to confirm about en 1155 smart lock rfq clause on the dated product page where a figure is involved. an en 1155 smart lock rfq clause works as a two-column evidence test. en 1155 smart lock rfq clause names the documents. Each column of en 1155 smart lock rfq clause closes with a paper.

  • What comes from the factory — supplier declarations and drawings for en 1155 smart lock rfq clause
  • What needs an external body — third-party certificates covering the exact scope of en-1155
  • What to order — the document set that matches the SKU behind en 1155 smart lock rfq clause
  • This is the sequence en 1155 smart lock rfq clause has to follow, anchored on en 1155.

EN 1155 is a standard for electrically powered hold-open devices for swing doors. Put that fact at the centre of the clause set and most drafting problems resolve themselves, because the standard answers one question only: how a powered device behaves when it holds a swing door open and when it releases it. Everything else a smart lock brings to an opening — the credential, the event log, the radio, the motorised bolt, the powered strike — belongs to a different question and a different piece of paperwork.

This article takes four drafting lanes that a buyer can realistically use to write that clause, and walks them head to head across five rounds: scope, evidence, variant binding, route boundary, and the response itself. Each round closes with a verdict and a running scoreboard. The lane that survives all five wins, and the clause language it produces is given in full further down so it can be lifted into an annex rather than written from scratch.

The Arena: Four Ways to Write the Same Clause

A clause that asks for EN 1155 evidence can be assembled in four ways, and the four ways generate four different supplier responses. The differences are not cosmetic. One lane produces a clean answer on a non-fire door and a wrong answer on a fire door; another produces an answer any supplier can satisfy with a page from a brochure. The hardware behind this is in the smart door locks.

Lane A, the standard-first lane, is what most RFQ templates produce. The specification line names EN 1155 and the edition, and a generic evidence line sits further down the annex asking for proof of compliance. It is quick to write, and it puts the burden of interpretation on the supplier.

Lane B, the evidence-first lane, starts from the document. The annex defines which documents will be accepted and which rung of the evidence ladder applies, then names EN 1155 inside that scaffold. The supplier is not asked to interpret the standard but to locate a specific document.

Lane C, the published-text-import lane, copies the published title and scope wording of the current edition into the clause and adds an explicit exclusion line. It is defensible because it tracks the standard's own vocabulary, and it is popular because it takes ten minutes.

Lane D, the functional-performance lane, describes the door behaviour the project actually needs and asks each supplier to propose the route and the evidence that supports it. It is the only lane that starts from the building rather than from the standard.

LaneWhere the clause startsWhat the supplier is asked to produceTypical failure
A Standard-FirstThe standard designation in the specification lineA general statement of compliance with attached proofEvidence arrives as a brochure page or a family certificate
B Evidence-FirstThe document type and the rung of the evidence ladderA named report, certificate, declaration or marking tied to the variantSlower to draft, and it exposes which suppliers hold nothing
C Published-Text ImportThe published title and scope of the current editionConformity with the standard's own wordingAccurate scope, but no instruction on what evidence counts
D Functional PerformanceThe door behaviour the project needsA proposed route with supporting evidenceAnswers drift into performance promises that no standard covers

Round 1: The Scope Test, Which Question Is This Clause Allowed

The first round asks whether each lane can survive the most common collision in this family: the powered hold-open device, the closing device, the fire-door hold-open system and the lock body are four different products, each answered by a different route, and clauses drafted around one of them quietly ask about the others.

EN 1155 describes electrically powered hold-open devices for swing doors. It does not describe a manual closer, and it does not describe a hold-open system installed into a fire or smoke door assembly, where the interface to fire detection and the expectation of a mains supply become part of the question. Those routes belong to EN 1154 and EN 14637 respectively, and the published title and scope of the current edition of each should be checked before the designation is used in a contract.

The door factThe question it raisesThe route that answers itWhat that route cannot answer
A swing door must stay open while stock passesHow does the powered hold-open behave under the standard's test conditions?EN 1155Whether the door can be locked, or who may open it
A swing door must close and latch unaidedHow does the closing device control the door swing?EN 1154Any behaviour of the powered hold-open
A swing door is a fire or smoke doorHow does the assembly behave with a hold-open fitted?EN 14637 for the hold-open system within a fire or smoke assembly, with the assembly fire-test route behind itDoors that carry no fire or smoke rating
A lock body must latch and unlock under powerHow does the lock perform?EN 14846 for an electromechanically operated lock, EN 12209 for a mechanically operated oneThe hold-open device
A hinge is cited in the same packageWhich component is the hinge actually specified for?EN 1935 covers single-axis hingesAnything about locking or holding open

The mapping below is the same separation drawn as the routing a clause actually follows. Each clause lands on one question, each question lands on one route, and only the first of those three links produces paperwork a supplier can hand over.

graph LR
  D["Door and hold-open function"] --> Q1["What closes the door"]
  Q1 --> R1["EN 1154 for the closing device"]
  D --> Q2["What holds the door open"]
  Q2 --> R2["EN 1155 for the powered hold-open"]
  Q2 --> R3["EN 14637 on a fire or smoke assembly"]
  D --> Q3["What latches and unlocks"]
  Q3 --> R4["EN 14846 for an electrically operated lock"]
  D --> Q4["How the whole door set performs"]
  Q4 --> R5["Assembly fire test route"]

Lane A fails this round because naming a designation and nothing else leaves the supplier free to treat EN 1155 as a general quality statement covering the whole offer. Lane D passes on awareness but loses on precision, because a supplier asked for a functional outcome may propose a different product and then answer a question the buyer never asked. Lane C scores well because the published scope wording naturally excludes the neighbouring routes. Lane B scores well because an evidence-first scaffold is written around the device, not the assembly.

LaneKeeps EN 1155, EN 1154 and EN 14637 apartMakes the obligation answerableRound scoreRunning total
A Standard-First1322
B Evidence-First4444
C Published-Text Import5344
D Functional Performance3333

Verdict. The published-text-import and evidence-first lanes lead after round one. The standard-first lane is eliminated as a drafting basis for anything other than a single, simple, non-fire swing door with a hold-open device offered as a separate item.

Round 2: The Evidence Test, Which Document Will Satisfy the Clause

The second round asks the question that decides most RFQ disputes: which piece of paper is the clause actually asking for. Buyers consistently use one word, "certified", to cover four different documents, and a supplier who reads it as a loose word will answer with the cheapest one available.

The four documents are a test report, which records that someone tested a sample; a certificate, in which a body attests conformity and states a scope and a validity; a declaration of conformity, the manufacturer or importer's own legal claim; and a marking, a symbol printed on the product or its label. A statement that a product "has CE" can mean any one of them. A clause that does not say which one it wants will receive all four and be satisfied by none.

Above those four sits the evidence-quality ladder, which runs from a marketing image, through a self-declared declaration of conformity and a test report on a sample, to a third-party certificate with scope and number, then to a certificate covering the exact variant being bought, and finally to audit or production-control evidence that keeps the result valid after the sample passed. The recurring commercial failure is buying at rung two or three and discovering at installation that nothing exists at rung five. For en 1155 smart lock rfq clause, the position on this ladder is what the purchase decision turns on.

Rung on the ladderDocument producedWhat it establishesWhat it leaves openAcceptance wording
1Marketing imageNothing that can be checkedEvery questionNot acceptable on its own
2Self-declared DoCThe manufacturer's own legal claimWhether any third party was involvedAcceptable only as a supplement
3Report from a sample testThat a sample of some type was testedWhether the offered variant was the sampleAcceptable with the sample description attached
4Certificate with scope and certificate numberThat a named body attested conformity within a stated scopeWhether the variant sits inside that scopeAcceptable when the scope is quoted in full
5Certificate naming the exact SKU/variant orderedThat the unit on the order is inside the attested scopeWhether production continues to matchThe target for a procurement clause
6Audit evidence showing the approval still holds after the sample passedThat the result stays valid after the sample passedNothing material for the buyerRequested for framework and repeat orders

Lane A collapses here. The designation tells the supplier what to be conformant with but never what to hand over, so the answer lands at rung one or rung two and the buyer learns nothing. Lane C also scores low: importing the published scope text says nothing about the evidence type, so a supplier holding a family certificate and a supplier holding a catalogue page look identical in the response. Lane D scores low for the same reason with an added complication, because a supplier proposing a route will propose the route it holds evidence for.

Lane B is built for this round. Its clause names the document, names the rung and asks the supplier to state which applies. The supplier must identify whether the answer is a report, a certificate, a declaration or a marking, and the buyer can then read it at the right level.

| Lane | Names the document type | Names the rung of The acceptance ladder behind en 1155 smart lock rfq clause runs:|---:|---:|---:|| A Standard-First | 0 | 1 | 1 | 3 || B Evidence-First | 5 | 5 | 5 | 9 || C Published-Text Import | 1 | 1 | 2 | 6 || D Functional Performance | 1 | 0 | 1 | 4 |

Verdict. The evidence-first lane wins this round outright, and it is the round that decides the commercial quality of the whole exercise. A clause that names the document converts a supplier's marketing into a checkable answer; a clause that names only a standard leaves the buyer reading brochures.

Round 3: The Variant-Binding Test, Does the Answer Cover

The third round asks whether a true answer can still be useless. It can, most often because a certificate covers a family of products while the purchase order names a variant with a different power source, housing or door size. The response is entirely accurate and covers an object the buyer is not buying.

Variant attributes for a powered hold-open device are short and specific: the device model and manufacturer part designation, the power source and supply model feeding it, the door leaf width and weight the device is sized for, the mounting side and fixing arrangement, the housing and finish if more than one is offered, and the configuration of any release input that forms part of the device. A smart lock programme adds one more, because the hold-open is often commanded by the lock's own controller rather than by a separate switch.

Clause lineWhat it bindsAnswer that satisfies itAnswer that does not
"Device model covered by the evidence shall match the model offered"The manufacturer part designationThe certificate schedule lists the same designationA family schedule that stops at the range name
"Power source and supply model shall be within the assessed configuration"Mains feed, transformer or supply typeThe evidence states the supply arrangement testedA report written for a different supply arrangement
"Door leaf width and weight shall be within the assessed range"The sizing envelopeA stated range that contains the offered doorA range that stops short of the door in the schedule
"Mounting side and fixing arrangement shall match"Push side, pull side, top jamb fixingThe evidence states the arrangement assessedA diagram showing the opposite arrangement
"Variant attributes shall be listed in the response, not assumed"Everything above, stated by the supplierA table of attributes and the evidence reference for eachA single sentence stating that all variants are covered

Lane A fails again, and this is the round where the standard-first lane does real damage, because a designation with no variant attributes invites the supplier to answer for the range rather than the unit. Lane C scores moderately, since the published scope text often includes a variant description that can be lifted and quoted. Lane D is weak, because a functional clause carries no variant attributes at all.

LaneBinds the answer to the variantRequires the variant attributes to be listedRound scoreRunning total
A Standard-First0114
B Evidence-First44413
C Published-Text Import2228
D Functional Performance1126

Verdict. The evidence-first lane extends its lead, and the published-text-import lane survives on the strength of a variant description it can quote from the scope. A working clause carries a short attribute table, and the supplier fills it in rather than the buyer inferring it.

Round 4: The Route-Boundary Test, Hold-Open Language

The fourth round catches clauses that look perfect and answer the wrong question. The vocabulary of door control is loose in trade, and the same word gets used for three different devices.

A closer and a hold-open are not alternatives. A door may carry a controlled door closing device with user-powered closing energy, the EN 1154 route, and an electrically powered hold-open device, the EN 1155 route, on the same leaf, doing different jobs. A clause asking for a compliant closer where the project needs a powered hold-open receives a good closer answer and no hold-open evidence.

The fire door is the harder case. Where a swing door sits in a fire or smoke door assembly, the hold-open question belongs to EN 14637, which addresses electrically controlled hold-open systems for fire and smoke door assemblies and carries the interface to fire detection and alarm along with the expectation of a mains supply. Battery-only systems sit outside that standard's own scope statement. A supplier answering "EN 1155 compliant" there may be truthful and still have answered the wrong question, because the device is being asked to do a job the standard it cited never covered.

The wording usedWhat it invites the supplier to sendWhat the clause should have said
"Door shall be fitted with an EN 1155 hold-open device"A device certificate with no statement about the fire rating of the door"Where the door forms part of a fire or smoke door assembly, the hold-open shall be assessed under the route applicable to that assembly"
"Hold-open shall be EN 1154 compliant"A closing device answer, since the designations are neighbours"Closing device and powered hold-open shall be evidenced separately, each against the designation that covers its function"
"Lock shall be fire rated"A standalone hardware claim, a concept that does not exist"Hardware shall be assessed as part of the door assembly, and the assembly evidence shall be referenced"
"System shall be battery powered, EN 1155"A battery device answer on a route that expects a mains supply"Where the hold-open forms part of a fire or smoke assembly, power supply arrangement shall be stated and shall match the assessed configuration"
"Hinges shall be to EN 1935"A hinge certificate offered as door hardware evidence"Hinges shall be specified under the designation that covers single-axis hinges, and shall not be offered as evidence for any other function"

Two project-level questions sit under this round and neither is answered by a product standard. Whether the powered hold-open is treated as a construction product in the destination market decides whether a Declaration of Performance accompanies any Declaration of Conformity. What the local fire strategy requires on a door that holds open in normal operation has to be settled by the project team, not by a catalogue.

CONFIRM-WITH-LOCAL-BUILDER: whether the electrically powered hold-open device is treated as a construction product in the destination market, and whether a Declaration of Performance is required in addition to any Declaration of Conformity.

CONFIRM-WITH-LOCAL-FIRE-STRATEGY: whether a hold-open is permitted in normal operation on the doors in the fire strategy, and what release arrangement the local approving authority expects.

CONFIRM-WITH-LOCAL-IMPORTER: which market-access marking the goods need in the destination market, and whether the holder of the import is the party that must make the conformity claim in that market.

Lane B scores highest because an evidence-first clause is written around the device and its configuration, forcing the power source and the door type into the answer. Lane C scores well because the published scope wording for EN 1155 excludes fire-door systems in terms the buyer can quote. Lane D scores moderately because a functional clause makes the supplier talk about the door rather than the product.

LaneSurvives the closer and hold-open swapSurvives the fire-route trapRound scoreRunning total
A Standard-First1015
B Evidence-First44417
C Published-Text Import34311
D Functional Performance3339

Verdict. The evidence-first lane holds a clear lead, with the published-text-import lane the only credible alternative once the door has a fire or smoke rating.

Round 5: The Response Test, What Comes Back and What Happens

The last round looks at the answer rather than the clause, because a clause is only as good as the response it produces. A working clause set fixes the response format before the RFQ is issued: which document, which variant attributes, what date it carries, who signed it, and what happens if it never arrives.

The consequence clause is the part most RFQs omit, and it decides whether a thin response is a negotiation or a rejection. Without it, the buyer receives no report, the supplier sends a statement that the device is compliant, and the conversation continues because neither side has agreed what silence means.

Response receivedWhere it sits on the evidence ladderWhat the buyer may concludeNext step to record
Marketing imageEvidence for en 1155 smart lock rfq clause (en 1155)Nothing about conformityRequest the named document; record no credit
Self-declared DoCRung 2The manufacturer's own claim, dated and signedAccept as a supplement and request the next rung
Test report naming a sampleRung 3A sample of some type was testedRequest the sample description and the variant comparison
Certificate whose scope names a familyRung 4Conformity within a stated scopeRequest the schedule and check the variant against it
Report from a sample testRung 5The unit on the order sits inside the attested scopeAccept for this award and record the certificate reference
Certificate with scope and certificate numberRung 6The result continues to hold in productionAccept and reference in the supply agreement

Lane A finishes last because its response format is undefined, so a thin answer is indistinguishable from a complete one. Lane B finishes strongest because it asked for a specific document in a specific form and therefore recognises a thin answer immediately. Lane C finishes respectably, since the published scope wording tells a supplier what to send. Lane D finishes weakly, because a supplier that proposed its own route answers for the route it already holds.

LaneProduces a usable responseDefines a consequence when evidence is thinRound scoreRunning total
A Standard-First1127
B Evidence-First45421
C Published-Text Import32314
D Functional Performance21211

Verdict. The evidence-first lane wins every round that carries commercial weight. The published-text-import lane is a defensible second and a good source of scope wording, but it needs the evidence-first scaffold bolted to it before it can be used on its own.

The Final Matrix

The five rounds plus two commercial criteria that do not belong to a single round produce the final ranking. The two added criteria are maintenance cost when the standard's edition changes, and how well the clause set defends itself in an audit or a dispute.

CriterionA Standard-FirstB Evidence-FirstC Published-Text ImportD Functional Performance
Round 1, scope separation2443
Round 2, evidence specificity1521
Round 3, variant binding1422
Round 4, route boundary1433
Round 5, response discipline2432
Maintenance when the edition changes1341
Defensibility in an audit or dispute1532
Total9292114

The evidence-first lane wins because it treats the standard as a reference inside a documented requirement rather than as the requirement itself. Its weakness is drafting effort, and it exposes early which suppliers hold nothing, which is uncomfortable but cheaper than discovering it at installation. The published-text-import lane is second, best used as a source of scope wording for the exclusions inside the winning lane. The functional-performance lane is worth reading once, because it catches a project asking for the wrong product. The standard-first lane is eliminated.

The Constraint-Driven Selection Map

Before a clause is drafted, two constraints decide which route the opening is on at all: whether the door has a power source available at the head, and whether the door sits on a fire or smoke route. Neither is a preference. Both determine which question the clause may ask.

quadrantChart
    x-axis No dedicated supply at the door head --> Dedicated supply already in the design
    y-axis Hold-open is a convenience --> Door sits on a fire or smoke route
    quadrant-1 Assembly route, no product clause
    quadrant-2 Two route clause plus assembly evidence
    quadrant-3 No powered hold-open line at all
    quadrant-4 One EN 1155 line on the evidence ladder
    "Office door with a mains feed": [0.78, 0.16]
    "Service door with no power at the head": [0.18, 0.14]
    "Fire rated door with a dedicated supply": [0.8, 0.86]
    "Battery only device on a fire route": [0.12, 0.9]

The bottom-left quadrant is the one most RFQs get wrong. A door with no supply at the head and no fire duty does not need a powered hold-open, so the honest clause is not an EN 1155 clause at all; it is a requirement on the closing device, and the project team should be asked why one was specified.

The top-left quadrant is the expensive one. A battery-only device on a fire route falls outside the scope of the fire-door hold-open standard, which expects an interface to fire detection and a mains supply, so no clause on that line can be satisfied by evidence anyone in the market holds. The route there is the project team, the fire strategy and the approving authority.

The top-right quadrant takes two clauses: one for the device and one for the assembly, with the device evidence expressed as the electrically powered hold-open route and the assembly evidence following the fire test route for door assemblies. The bottom-right quadrant is the ordinary case, where a single EN 1155 line written on the evidence-first scaffold does the whole job.

Constraint combinationQuestion the clause may askRouteClause count
No supply at the head, no fire dutyHow does the door closeClosing device routeOne, and it is not an EN 1155 clause
Supply available, no fire dutyHow does the powered hold-open behaveEN 1155One
No supply at the head, fire dutyWhether the hold-open arrangement is permissible at allProject and authority decisionNone in the product clause set
Supply available, fire dutyHow the device behaves and how the assembly behavesDevice route plus assembly routeTwo

The Winning Clause Set, Line by Line

The following set is written for the evidence-first lane and adapted for the opening named in the door schedule, ready to be pasted into an annex.

C1 Scope. The Supplier shall state which part of the offered product is the electrically powered hold-open device. Evidence under this clause shall relate to that device. If the product contains no such device, the Supplier shall state that in the response.

C2 Standard route. The device shall conform to the current edition of EN 1155. The published title and scope of that edition shall be confirmed by the Supplier before the response is submitted, and the Supplier shall list any part of the device the standard does not cover.

C3 Exclusion. Evidence relating to the door assembly, to a closing device, to a locking device, or to radio, electromagnetic compatibility and electrical-safety material shall not be submitted in response to this clause, nor relied on as evidence of conformity with it.

C4 Evidence type. Conformity shall be evidenced by a test report, by a certificate issued by a certification body, by a declaration of conformity, or by marking applied to the product or its label. The Supplier shall state which is being submitted, and shall submit only one type in response to this clause.

C5 Certificate particulars. Where a certificate is submitted, the response shall state the certificate number, the name of the issuing body, the scope, the dates of issue and validity, and the schedule of products covered, quoted in full rather than summarised.

C6 Variant binding. The response shall list the device model, the power source and supply model, the door leaf width and weight the device is offered for, the mounting side and fixing arrangement, and the release input configuration, with an evidence reference for each attribute.

C7 Report particulars. Where a test report is submitted, the response shall state the name of the testing body, the date of the report, the identification of the sample tested, and the clauses of the standard that were covered.

C8 Declaration particulars. Where a declaration of conformity is submitted, it shall be signed and dated, shall identify the manufacturer or the party placing the goods on the market, and shall be accompanied by the list of standards applied.

C9 Marking particulars. Where marking is submitted, the response shall state the marking, where it is applied, which regime it belongs to, and which party carries the obligations attached to it.

C10 Consequence. A response that does not satisfy C1 to C9 shall be recorded as no evidence received. The Supplier may submit a replacement response by the date stated in the RFQ. If no compliant response is submitted by that date, the line shall be treated as not met.

C11 Production continuity. Where the evidence on file is a certificate covering a variant rather than the variant ordered, the Supplier shall state what controls keep the manufactured product inside the scope of that certificate, and shall provide that statement with the response.

C12 Local confirmation. The Supplier shall state which party is responsible in the destination market for the conformity claim, for any marking on the goods, and for any declaration required by the destination market.

ClauseWhat it doesWhich round it earns its place from
C1Forces the supplier to identify what the clause is aboutRound 1, scope
C2Fixes the route and the editionRound 1, scope
C3Blocks evidence for the wrong productRound 1 and round 4, boundary
C4Separates the four document typesRound 2, evidence
C5Makes a certificate readableRound 2 and round 3, evidence and variant
C6Binds the answer to the unit on the orderRound 3, variant
C7Makes a test report traceableRound 2, evidence
C8Makes a declaration traceableRound 2, evidence
C9Makes a marking traceableRound 2, evidence
C10Gives silence a meaningRound 5, response
C11Protects the evidence after the sample passedRound 5, response
C12Locates the responsibility in the destination marketRound 4, boundary

Reading the Responses Without Reopening the RFQ

Once responses arrive, the buyer should be able to score them from the clause set alone, without reopening the tender text. A short response matrix makes that possible and gives a defensible basis for comparing quotations on conformity grounds rather than on marketing language.

Response columnReadingAction
Device identified as a powered hold-openThe supplier has answered the right questionContinue to the evidence column
No device identified, or the product has no hold-openThe line has been answered with a different productAsk for clarification before scoring
Certificate with number, scope, schedule and datesRung 4 or 5 depending on the scheduleCompare the schedule against the variant table
Report naming a sample and the clauses coveredRung 3Ask whether the offered variant matches the sample
Signed and dated declaration onlyRung 2Treat as a supplement, not a substitute
Marking onlyRung 1 for conformity purposesAsk which document sits behind the marking
Variant table incompleteThe response cannot be bound to the orderReturn it as an incomplete response

The comparison sheet used alongside this article is the Smart Lock Supplier Comparison Sheet, and the wider quotation checklist sits in What Should Be Included in a Smart Lock Quotation?. For programmes buying from several factories, the Smart Lock RFQ Guide for International Buyers sets out how the same annex is reused across a supplier panel without letting the evidence requirement drift between rounds.

Ten Clause Traps and Their Repairs

TrapWhy it failsRepair
"EN 1155 compliant" as a specification lineNames no document, so any answer satisfies itReplace with C4 and the four document types
One designation for the whole offerLets a device standard speak for the lock, the radio and the assemblyGive the lock, the closer and the hold-open their own lines
Evidence attached without a variant referenceThe evidence covers a range, the order names a variantRequire the variant table in C6
A certificate schedule paraphrased rather than quotedThe paraphrase is what the buyer is actually relying onQuote the schedule in full and attach it
A declaration accepted as a final answerA self-claim cannot survive an auditAccept it only as a supplement to a report or certificate
Marking treated as proof of conformityA marking is one of four document types and the weakest of themAsk which document sits behind the marking
EN 1154 and EN 1155 used as alternativesThey cover different functions that often sit on one leafAsk for both, each against its own designation
A fire door treated as a product questionHardware is assessed as part of the assemblyAdd an assembly line and reference the assembly evidence
A battery device proposed on a route expecting mainsThe power arrangement is outside the assessed configurationRequire the power arrangement as a named attribute
No consequence clauseSilence and compliance look the same in the response logAdd C10 and record what no evidence means

Where the EN 1155 Clause Meets the Rest of the RFQ

An EN 1155 clause is one line in a wider set, and it works only when the neighbouring lines follow the same discipline. The lock body itself is handled under EN 14846 for an electromechanically operated lock, with EN 12209 as the reference for mechanically operated locks, latches and locking plates. The wiring, the power arrangement and the commissioning steps belong in the installation and electrical sections, which is where the Smart Lock Installation Requirements and the Smart Lock Electrical Requirements sit. For a private-label programme, the clause set belongs with the technical specification document, and the Smart Lock OEM Technical Specification is the natural host for it.

The boundary work behind this article is set out elsewhere: the scope of EN 1155 in EN 1155 for Smart Locks: Scope, Tests and What the Standard Never Proves, the choice between closing device and powered hold-open in EN 1154 Versus EN 1155: Which One Applies to Your Smart Lock Door, and the fire-door question in EN 1155 Versus EN 1634-1: Which One Applies to Your Smart Lock Door. The neighbouring designations have their own clause sets, with Writing EN 1154 Into a Smart Lock RFQ: Clause Language that Gets Real Answers and Writing EN 14637 Into a Smart Lock RFQ: Clause Language that Gets Real Answers covering the two routes this article keeps separate. For a manufacturer taking this work on for the first time, the ownership question is covered in Who Pays for EN 1155 Evidence in a Smart Lock OEM Programme.

Once the clause set is settled, the practical steps are familiar: request a sample and check it against the evidence on file, using Smart Lock Sample Order Process and Smart Lock Supplier Due Diligence Checklist as the working structure. Samples can be arranged through the sample request page, and a programme quotation with the clause set attached through the quote request page.

Sending the RFQ: What to Ask For and When to Ask Again

The clause set is only half the job; the calendar decides whether it is ever used. Three moments carry the load, and each one has a defined ask.

At issue, the annex travels with the RFQ, so the evidence requirement is visible to every supplier rather than discovered during evaluation. At clarification, any response that has not named its document type under C4 is returned incomplete rather than scored. At award, the evidence is re-checked against the variant table and the schedule quoted in the response, because a certificate obtained a year before the order may have been issued for a configuration that has since changed.

Two requests follow the award. The first asks the supplier for the statement on production continuity that keeps the certificate valid for the units actually manufactured. The second asks for the current edition's published title and scope, since an edition change is the most common reason a clause that worked last year quietly stops matching the evidence on file.

A supplier who answers C1 to C9 properly has done more than satisfy a clause. They have told the buyer which document exists, what it covers, and which unit it covers, which is the difference between a compliant offer and an unverifiable one. That is the argument for writing EN 1155 as a set of named obligations on named documents rather than as a designation in a specification line.

Su carrito
Su experiencia en este sitio mejorará al permitir cookies Política de cookies