Backset and Bore Dimensioning: What Goes Wrong on Smart Lock Projects

Backset and Bore Dimensioning: What Goes Wrong on Smart Lock Projects

This fill-in workbook turns the question backset and bore dimensioning what goes wrong into a sequence of evidence checks. It is for the consultant who must let the client, installer and supplier move without another meeting. Complete one copy for each opening and retain it with the smart lock dimensional submittal.

Direct answer. The short answer is that backset and bore dimensioning what goes wrong is not one decision. It is a sequence. This article takes backset and bore dimensioning what goes wrong from backset and bore dimensioning what goes wrong through backset-and-bore-dimensioning to the record you keep. A backset and bore dimensioning what goes wrong gives the specifier working documents. backset and bore dimensioning what goes wrong is the document that decides the requirement. That is what backset and bore dimensioning what goes wrong turns into.

backset and bore dimensioning what goes wrong is taken here as backset and bore dimensioning what goes wrong, deliberately narrowly. It is a working definition of backset and bore dimensioning what goes wrong. It is specific to this market and product, and it is not a statutory or certified term.

  • State the requirement — use a template that names the physical constraints in backset and bore dimensioning what goes wrong
  • Compile the documents — attach the conformity file for the SKU behind backset-and-bore-dimensioning
  • Submit once, complete — issue one complete package per door class, not one per query
  • This is the sequence backset and bore dimensioning what goes wrong has to follow, anchored on backset and bore dimensioning.

Use the blanks to separate what the supplier states, what the site records and what the reviewer approves. A catalogue dimension, a door-schedule value and a field measurement are different evidence. Never let one silently replace another.

1. Open the door-set record

Give each door set a unique reference before any lock is compared. The reference must connect the schedule row, drawing, physical opening and product submittal. If the door leaf, frame or handing changes later, record the revision against the same opening reference. The second take on backset and bore dimensioning what goes wrong is Backset and Bore Dimensioning for a Hotel Project. Every commercial claim here has to be checked against the smart door locks.

Record fieldEntry
Project and phase[enter project name and phase]
Door set schedule[schedule number and row reference]
Drawing revision[revision number and issue date]
Opening and door-leaf reference[enter unique reference]
Record owner[name and role]

The client supplies design intent, the installer identifies the buildable condition, and the supplier states the product condition. Put each party’s entry in a separate field. A change to the leaf, frame, handing or scheduled hardware triggers another comparison rather than an informal email assumption.

Use this as the companion to Backset and Bore Dimensioning: A Smart Lock Specifier Guide, but keep the workbook as the dated working record. A guide explains the check; the completed fields show who checked what and when.

2. Capture every dimension separately

Backset is the distance from the door edge to the centre of the spindle or cylinder. Bore diameter and bolt-to-bore distance are separate dimensions, and a submittal that omits either cannot be checked. Record the datum and unit with every value; do not assume that the catalogue drawing defines the installed door.

Required fieldSupplier responseRequired format or datumSite recordResult
Backset[enter value][unit] from [door edge datum][enter value][match or discrepancy]
Bore diameter[enter value][unit][enter value][match or discrepancy]
Bolt-to-bore distance[enter value][unit] and stated datum[enter value][match or discrepancy]
Door thickness and stile width[enter values][unit][enter values][match or discrepancy]
Faceplate dimensions[enter values][unit][enter values][match or discrepancy]
Strike dimensions[enter values][unit][enter values][match or discrepancy]

Identify whether each field is a product limit, an installation requirement or a site observation. That label prevents a generous product dimension from being mistaken for evidence that the scheduled door will fit.

The smart lock dimensional submittal should trace every field to a dated product page for the specific SKU or a dimensioned supplier drawing. Ask the supplier to confirm on the dated product page for the specific SKU, and request the corresponding drawing. A brochure without dimensions is not a checkable answer.

CONFIRM-PER-SUPPLIER: [named SKU, dated source and document reference]

Use Backset and Bore Dimensioning: Documents a Specifier Should Demand as the evidence request, then paste its references into this table.

3. Reconcile scheduled data with field verification

A site measurement record closes the gap between scheduled and installed conditions. The record needs the opening reference, source drawing, measurement date, measurer and unit. For retrofit field verification, repeat the check at the actual door rather than carrying forward a new-construction assumption.

  1. Identify the actual leaf and establish the edge datum. Record any different door set reference.
  2. Measure the backset from the door edge to the centre of the spindle or cylinder.
  3. Measure bore diameter and bolt-to-bore distance independently; neither substitutes for the other.
  4. Record faceplate and strike dimensions from the same proposed door set.
  5. Use a photograph only as context; an unscaled image is not a dimensional record.

Use the same unit and level of precision across all sources. Record the instrument or method used. If two readings differ, open a discrepancy rather than selecting the preferred number.

SourceDrawing or document referenceDateMeasured or stated byStatus
Scheduled dimension[enter][enter][enter][open or closed]
Supplier dimension[enter][enter][enter][open or closed]
Site measurement[enter][enter][enter][open or closed]
Field change[enter][enter][enter][open or closed]

For retrofit work, use Smart Lock Retrofit Site Survey. For a multi-opening office, use Office Smart Lock Site Survey. Keep their references in this sheet and do not transfer an opening reference without checking it.

4. Match the lock case to the closing edge

Ask the supplier to identify the lock case before comparing dimensions. A mortise case sits inside the door; a rim lock is surface-mounted; a multipoint assembly operates several locking points with one gear. The faceplate and strike form the two halves of the closing edge and must be matched.

Case identifiedEvidence requiredSite checkDisposition
MortiseLock-case drawing and faceplate dimensionsBore, bolt-to-bore and faceplate agree[accept, revise or hold]
RimSurface-case dimensions and required door-edge conditionCase position and strike agree[accept, revise or hold]
MultipointLocking-point layout and related strike dimensionsEvery included point is located[accept, revise or hold]

For a multipoint assembly, confirm which locking points and strike positions the submitted configuration includes rather than assuming a standard layout.

The faceplate and strike dimensions are not interchangeable with the bore dimensions. If either closing-edge record is missing, mark the submittal incomplete and identify the document required.

5. Run the mock-up and site release gate

Use a physical mock-up or sample to verify fit, not performance. Record the door leaf, frame and hardware condition used for the check, then transfer the result to the opening reference. A sample proves fit only for the configuration represented.

Release gateQuestion for the reviewerEntryOwner
Dimensions completeAre all required fields populated?[yes or no][enter]
Sources traceableDoes every value point to a dated source?[yes or no][enter]
Site agreementDo scheduled, product and field dimensions agree?[yes or no][enter]
Closing edge matchedDo faceplate and strike correspond?[yes or no][enter]
Sample verifiedDoes the recorded configuration fit?[yes or no][enter]
Authority questions closedHave applicable decisions been recorded?[yes or no][enter]
Revision currentDoes the record match the latest door-set revision?[yes or no][enter]
flowchart TD
    A["Complete dimension fields"] --> B{"Sources agree?"}
    B -->|No| C["Log the discrepancy"]
    C --> D["Obtain corrected evidence"]
    D --> A
    B -->|Yes| E{"Sample fits the door?"}
    E -->|No| F["Hold installation release"]
    F --> C
    E -->|Yes| G["Record review and date"]

Follow the branch rather than treating a blank as a pass. Before release, attach the sample record to the opening reference and record any deviation encountered during fitting. A discrepancy remains open until corrected evidence is reviewed.

6. Diagnose the recurring failure patterns

During review, write the observed failure instead of a general concern. Use the following log to turn backset and bore dimensioning what goes wrong into a correction with an owner.

Failure observedFill-in correctionOwnerEvidence required to close
Catalogue value treated as the site factLink the value to a site measurement record[enter][drawing or measurement]
Opening lacks a door set referenceAdd the schedule row and opening identifier[enter][revised record]
Backset supplied without a datumState the edge and centre used[enter][dimensioned source]
Bore diameter omittedObtain the missing value and unit[enter][dated product evidence]
Bolt-to-bore distance confused with another dimensionSeparate the fields in the comparison[enter][dimensioned drawing]
Faceplate and strike come from different recordsReconcile the closing-edge pair[enter][matched documents]
Revised door or frame is absent from the submittalRe-run the comparison against the revision[enter][current revision]

Start with the lowest-level correction that removes uncertainty: add a missing datum, obtain the missing dimension or reconcile the two sources. Do not close an error by repeating the requested value in another document.

Escalate recurring omissions with the Backset and Bore Dimensioning: Reviewer Checklist. Keep the reviewer’s reason, the corrective evidence and the decision date in the submittal review record.

7. Compare the evidence before making the decision

When a supplier asks for a change or an or-equal substitution, put both dimensional cases side by side. The or-equal decision belongs to the specifier, and the reason must be recorded. Use procurement priorities only after the fit evidence has been compared.

Decision pointEvidence AEvidence BDecision and reasonOwner and date
Backset[source, value and datum][source, value and datum][accept, reject or hold][enter]
Bore diameter[source and value][source and value][accept, reject or hold][enter]
Bolt-to-bore distance[source and datum][source and datum][accept, reject or hold][enter]
Faceplate and strike[matched documents][matched documents][accept, reject or hold][enter]
Site conflict[measured record][scheduled or supplied record][accept, reject or hold][enter]

Attach source extracts rather than copying totals. The comparison should let another reviewer retrace the decision without contacting the supplier.

The Backset and Bore Dimensioning Versus Procurement Priorities guide can help order commercial questions, but it cannot replace the dimensional comparison. The submittal review record should name the selected evidence, rejected evidence, unresolved questions and approver. The submittal is not approved until the review is recorded and dated.

Readers comparing approaches usually start with slk 9936s sample testing checklist. That is the same question backset and bore dimensioning what goes wrong has to answer here.

8. Route authority-dependent questions

Some questions cannot be answered by a product drawing. Route them to the authority that decides and preserve the answer with the opening record.

For a door identified as a fire-door assembly, ask what evidence the fire authority requires for the proposed electronic component.

CONFIRM-WITH-FIRE-AUTHORITY: [decision, document reference and date]

For an escape route, ask which locking arrangement the building authority accepts for the door’s role.

CONFIRM-WITH-LOCAL-BUILDING-CONTROL: [decision, document reference and date]

Where accessible operation is in scope, ask the access consultant to review the operable part on the installed door.

CONFIRM-WITH-ACCESS-CONSULTANT: [review decision, document reference and date]

9. Transfer the completed record

At handover, transfer the workbook in a usable format. Name one holder for the final file and keep superseded revisions available to the project team. At each revision, preserve the previous file and mark the superseded version.

Handover artifactFinal referenceHolderTransfer date
Smart lock dimensional submittal[enter][enter][enter]
Site measurement record[enter][enter][enter]
Mock-up or sample record[enter][enter][enter]
Approved submittal review record[enter][enter][enter]
Authority correspondence[enter][enter][enter]
Final door-set revision[enter][enter][enter]

Send the completed workbook with the smart lock dimensional submittal and use any blank as a question in the RFQ. The result is a door set specification that the client, installer and supplier can build from without relying on a catalogue image or a remembered dimension.

Nothing is binding until a supplier prices it, so request a quote.