What Makes Two Identical Lock Prices Different: The Version a Procurement Team Needs
Two quotations land with the same printed figure, and the committee reads that as agreement. It is coincidence on one line of a document that has many. This workbook is the what makes two identical lock prices different procurement version of the question: fill five sheets, and the difference surfaces as either a written entry or a blank cell. A blank cell is a finding — it names the document you have not been given yet.
How to Use This Workbook If the what makes two identical
Direct answer. Fill every cell from the documents in front of you, never from a call summary. One row per question, one column per quotation; an unfillable cell records the document you are requesting, with an owner and a date. Sheet One records what each paper is; Sheets Two to Four test where two identical figures legitimately differ — scope, components
flowchart TD
Q[Two quotations one printed figure] --> W[Sheet One record both as written]
W --> S[Sheet Two scope legs and named place]
W --> C[Sheet Three configuration and approval]
W --> K[Sheet Four commitments that bind]
S --> V[Sheet Five verdict and evidence requests]
C --> V
K --> V
V --> L[Comparable bids ready to level]
V --> R[Gaps requested in writing]
Sheet One — Record Both Quotations as Written
Classify each paper before comparing anything. A proforma invoice is a non-binding indicative document: it records what was discussed and creates no obligation to pay; an acknowledged order is a different artefact.
| Field to record | Quotation A | Quotation B |
|---|---|---|
| Document type: proforma, quotation, or order acknowledgement | ||
| Trade term and named place, written together as one phrase | ||
| Consignee named on the transport documents | ||
| Specific model and configuration quoted, not the family name |
If the term-and-place row is half-empty, stop: an Incoterm names a place, and without the named place it decides nothing. The term-by-term vocabulary sits in What Makes Two Identical Lock Prices Different: Terms, Tables and Definitions.
Sheet Two — Where the Scope Differs
Identical figures diverge first on legs. EXW leaves export clearance to the buyer; FCA delivers to a named carrier at a named place and is misread as factory-free when it is not; FOB speaks only to the loading port; CIF has the seller paying cost, insurance and freight to the destination port while risk still passes at origin; Delivered at Place moves the last leg and the arrival paperwork to the seller. The misreads are collected in What Makes Two Identical Lock Prices Different: Common Misunderstandings.
| Leg or obligation | Who in A | Who in B | Evidence to demand |
|---|---|---|---|
| Export clearance and main carriage booking | Named place inside the term | ||
| Insurance, and whose interest it covers | Policy line on the quote | ||
| Arrival formalities and the named consignee | Transport document naming the party | ||
| Terminal charges if clearance slips | Demurrage exposure note |
A container held beyond free time generates a terminal charge that lands on whoever named the consignee — that is where a cheap CIF stops being cheap. Duty, tax and every percentage on this leg are determinations the customs authority makes on the specific goods — this workbook prints none.
CONFIRM-WITH-CUSTOMS-BROKER — classification of the specific SKU, the duty and tax treatment on your import, and the documents the destination authority expects before release.
Sheet Three — Where the Components Differ
The second divergence hides inside the product line. A family name is not an item: a third-party listing covers a specific model in a specific configuration, and a test report binds a sample, not every variant around it. First-article approval binds only the configuration approved, and a Product Change Notification that improves the product is still a change.
The build-up behind that decision is in what smart lock is best for retrofit projects. That is the same question what makes two identical lock prices different procurement version has to answer here.
| Configuration field | Quote A | Quote B | Settled by |
|---|---|---|---|
| Lock format: mortise, rim or cylindrical body | Dated datasheet per model | ||
| Fail-safe or fail-secure behaviour | Written mode confirmation | ||
| Credential mix: card, fob, code or fingerprint | Credential matrix | ||
| Door preparation assumed: backset, spindle, frame | Survey record |
Sheet Four — Where the Commitments Differ
The third divergence is what each paper binds. A letter of credit turns on conforming documents — the bank checks the documents, not the goods. Cash against documents is neither cash on delivery nor an open account; open account is a credit decision, not a shipping one. An Acceptable Quality Limit is a sampling threshold for judging a lot, not a defect rate and never a guarantee on every unit. Minimum order quantity, delivery dates and warranty periods are supplier terms — verify any stated figure against the supplier's dated terms.
It is worth pairing this with smart lock manufacturer what b2b buyers should know before choosing a supplier. That is the same question what makes two identical lock prices different procurement version has to answer here.
| Commitment line | What binds in A | What binds in B | Document to demand |
|---|---|---|---|
| Which paper the order references | Order acknowledgement wording | ||
| Payment mechanism and trigger | Term sheet or credit decision | ||
| Inspection standard and consequence of failure | Sampling plan reference | ||
| Change control after approval | Notification procedure |
CONFIRM-WITH-LOCAL-LEGAL-ADVISER — which paper constitutes the binding contract in your jurisdiction, and what the payment term is enforceable against once goods and documents disagree.
Sheet Five — Verdict, Blanks and Evidence Requests
Return to every blank cell. A blank on the named place, the configuration reference or the binding document means the figures are not yet comparable — send the blank back as a written question, never an averaged assumption. Run this way, the what makes two identical lock prices different procurement version grid does its job: symmetric blanks become one request, asymmetric ones become the difference, documented in the suppliers' own words.
| Blank or mismatch found on | Sheet | Request it from | Owner and date |
|---|---|---|---|
| Named place behind the trade term | Two | Both suppliers | |
| Model and configuration reference | Three | Quoting supplier | |
| Which document the order references | Four | Buyer side first |
Carry the completed sheets into your next enquiry: the structure doubles as a checklist for the smart lock RFQ guide for international buyers, and Sheet Two's legs turn a unit figure into total cost of ownership. Commercial figures are quoted per project — send both recorded sheets, blanks marked, to request a quote. For a visual route through the same three divergences, walk the fields one by one in What Makes Two Identical Lock Prices Different: Diagram-led Walkthrough.

