En 1155 smart lock tender evidence: build an EN 1155 smart lock tender pack with scope checks, traceable documents, supplier declarations and installation.

Publicat la: nov. 09, 2026

EN 1155 in a Smart Lock Tender Pack: The Evidence Checklist

EN 1155 in a Smart Lock Tender Pack: The Evidence Checklist

Procurement managers rarely need another description of EN 1155. At qualification, they need to know which evidence is relevant, which document establishes what, and which question remains open. This guide turns en 1155 smart lock tender evidence into a repeatable decision tree for a smart lock tender that may also include powered door-control hardware.

Direct answer. To put it plainly: en 1155 smart lock tender evidence has to hold for en 1155 smart lock tender evidence. en-1155 has to hold at the same time. The sections below describe the order en 1155 smart lock tender evidence is settled in. an en 1155 smart lock tender evidence turns conformity language into requests a buyer can send. en 1155 smart lock tender evidence is where those en 1155 smart lock tender evidence requests get written down.

en 1155 smart lock tender evidence is used here in the sense given under en 1155 smart lock tender evidence. It is a working definition of en 1155 smart lock tender evidence that carries no regulatory weight. The buyer still has to check it against the dated product page.

  • What comes from the factory — supplier declarations and drawings for en 1155 smart lock tender evidence
  • What needs an external body — third-party certificates covering the exact scope of en-1155
  • What to order — the document set that matches the SKU behind en 1155 smart lock tender evidence
  • In en 1155 smart lock tender evidence, this sequence is what en 1155 is checked against.

The tree starts with the function being offered, not the product name. It separates an electrically powered hold-open device from a manual closer, an electromechanical lock and a fire-door assembly. It then separates a test report, certificate, declaration of conformity and marking before matching any source document to the exact purchasable variant.

That sequence matters. EN 1155 is a test specification for electrically powered hold-open devices for swing doors, not a site-approval certificate. Every certification status stays CONFIRM-PER-SUPPLIER until a named document is supplied and checked against the bid. Clause-level requests must be checked against the current published edition.

CONFIRM-WITH-LOCAL-APPROVER: Confirm the jurisdiction, project specification, current published EN 1155 edition, and the authority or customer who must accept the evidence.

Begin with the function the bidder actually offers

A qualification review should start with a one-page scope extract, not a product brochure. The extract should identify what equipment is physically included in the tendered assembly and where each functional boundary sits.

Record at least these items:

  • Whether an electrically powered hold-open device is included.
  • Whether a manual door closer is included.
  • Whether the offer includes a smart lock, lock controller or separate door-control device.
  • Whether the proposed door is identified as fire-rated, smoke-control or subject to a special access-control requirement.
  • The offered power arrangement, described only as proposed.
  • The manufacturer’s exact product and variant identifiers.
Tender inputWhat to recordUse in the decision
Offered functionLock, powered hold-open device, manual closer or combined assemblyDetermines which standard scope branch applies
Door contextSwing door, fire or smoke door, or status still unknownDetermines whether an assembly-level route must be added
Product identityManufacturer, product family, type and variant identifiersEnables exact matching to source documents
Claimed evidenceReport, certificate, declaration, marking or an unnamed claimPrevents all four evidence types from being merged
Verification routeIssuer, document number and named verification channelAllows the reviewer to check the source independently

A device marketed as “smart” may provide electronic access control without providing an electrically powered hold-open function. Conversely, a tender may combine a smart lock with a separate powered hold-open unit. Create a separate evidence line for each function, even when both functions use the same commercial item number. What can be supplied is listed in the smart door locks.

If the tender system uses the internal discriminator en-1155, carry it onto every scope and evidence-index row. That makes it possible to trace one function through qualification without implying that the whole smart lock product sits within the same scope.

Route the bid through the function, door and document gates

The first gate asks whether the tender includes an electrically powered hold-open device for a swing door. If it does not, the EN 1155 branch closes for that offered function. The lock evidence must then be assessed against the published scope of the standard relevant to the electromechanical locking function. EN 14846 is the closer fit for that function than the mechanically operated lock standard EN 12209.

The second gate checks the current published title and scope of EN 1155. A bidder’s shorthand—such as “EN 1155 compliant”—does not reveal which functions, test conditions or product variants the supplier has considered. EN 1155 for Smart Locks: Scope, Tests and What the Standard Never Proves provides a deeper scope review before the tender team relies on a claim.

The third gate asks whether the opening is a fire or smoke door assembly. If it is, electrically controlled hold-open evidence for fire and smoke door assemblies must be considered under EN 14637, while EN 1634-1 addresses fire-resistance testing of the door or shutter assembly. The published scope of EN 14637 excludes battery-only systems. These are different scopes from ordinary powered hold-open equipment.

CONFIRM-WITH-LOCAL-FIRE-ENGINEER: Confirm whether the proposed opening is a fire or smoke door assembly and which assembly-level evidence the project and approving authority expect.

The final gate identifies what kind of evidence has actually been supplied. A test report, certificate, declaration and marking are not interchangeable labels. The decision tree below turns that distinction into a qualification route.

flowchart TD
    A["Tender package received"] --> B{"Powered hold-open function in scope"}
    B -- "No" --> C["Route to lock or closer evidence"]
    B -- "Yes" --> D{"Fire or smoke door assembly"}
    D -- "No" --> E["Check current EN 1155 scope"]
    D -- "Yes" --> F["Add assembly-level evidence routes"]
    E --> G{"Source document identified"}
    G -- "No" --> H["Hold for named evidence"]
    G -- "Yes" --> I{"Exact variant covered"}
    I -- "No" --> H
    I -- "Yes" --> J{"Scope and number visible"}
    J -- "No" --> H
    J -- "Yes" --> K["Check production-control evidence"]
    K --> L["Qualification disposition"]

A bidder that reaches the final node has not yet received product approval. It has supplied enough traceable evidence to move into technical evaluation. Installation acceptance, site suitability and the final tender award remain separate decisions.

Keep four evidence families in separate lanes

Ask the supplier to label every attachment with one of four evidence roles. Requiring this classification at upload prevents a logo, declaration or product page from being mistaken for a test report.

Evidence roleWhat the source establishesWhat remains openRequired index label
Test reportA sample was tested and the results were recordedWhether the sample represents the offered production variantTest report
CertificateA named body attests conformity within a written scope and validityWhether the scope covers the exact purchased itemCertificate
Declaration of conformityThe manufacturer or importer makes its own conformity claimIndependence of testing and the underlying evidence basisDeclaration of conformity
Product or label markingA mark such as CE, UKCA, RCM, KC or G-Mark appears on the product or labelWhich standard, market route and exact variant the mark relates toMarking evidence

A test report identifies tested samples and recorded results. It should name the standard and edition used, describe the test specimen, identify the report number and issuing body, and show the relevant result pages. A report for one sample does not automatically establish conformity across every later production batch.

A certificate requires an issuer, an identifiable certificate number, a written product scope and the validity stated by the issuer. The buyer should verify the number through the channel identified on the certificate. A valid-looking scan whose scope excludes the offered device remains weak evidence for that device.

A declaration of conformity is the manufacturer’s or importer’s own legal claim. It should identify the declaring entity, the product or variant, the applicable legislation or standards invoked, supporting annexes, a signature, a name, a date and a contact route. A declaration may reference a report or certificate, but the referenced document should be supplied or made traceable.

A product marking is physical evidence of what appears on the label. It should be connected to the exact product through photographs, label artwork and the declared product identifiers. Marking alone does not reveal the scope of an EN 1155 test report.

The statement “the supplier has CE” is therefore not a complete tender answer. It may mean a marketing image, a self-declaration, a report, a certificate or a printed mark. The clarification request should specify which source is intended. For en 1155 smart lock tender evidence, the position on this ladder is what the purchase decision turns on.

CONFIRM-WITH-LOCAL-LEGAL: Confirm which entity signs the declaration, which market-access route applies to the exact SKU and destination, and which documents the project or customer will accept.

Match each document to the purchasable configuration

Create one evidence-index row for every source document. Avoid a single row labelled “EN 1155 documents”, because that makes it impossible to see which variant each document covers.

Index fieldQuestion the buyer must answer
Evidence roleIs this a report, certificate, declaration, marking or other source?
Offered itemWhich manufacturer product and variant does it cover?
Functional scopeWhich lock, hold-open or door-control function was evaluated?
Standard editionWhich published edition is named in the source?
Sample descriptionWhat exact configuration was tested?
IssuerWhich body or organisation issued the source?
IdentifierWhat report, certificate or declaration number is visible?
DatesWhat issue date and validity dates are stated?
Scope statementWhich products, variants and limitations are included?
Production linkWhat evidence connects the source to routine production?
Verification routeHow can procurement confirm the document independently?
Review statusWhich items remain CONFIRM-PER-SUPPLIER?

Exact matching is more demanding than matching a brand name. A supplier may test a representative configuration and identify the tested model in a way that the commercial catalogue uses different names. Request a crosswalk from the tested description to the tendered product family, type and variant. Ask the supplier to identify every option or feature that differs between the sample and the item offered for delivery.

Reading an EN 1155 Test Report Page by Page: A Smart Lock Buyer Walkthrough helps reviewers read the report rather than treating the cover page as the whole evidence package. The buyer’s record should still include the report identifier, specimen description, relevant result pages, stated limitations and the signed report content.

Use validity exactly as stated by the issuer. Do not invent a procurement cut-off or assume that a date printed elsewhere in the pack applies to the certificate. If the source is silent on a required index field, record the gap rather than filling it from a brochure.

A useful review note states both what is proven and what remains outside the source. For example: “Report R identifies the tested powered hold-open configuration; the submitted certificate does not list the tendered variant, so the mapping is held pending a supplier clarification.” That note is more useful than either “pass” or “fail” without an explanation.

Move up the evidence-quality ladder

The evidence-quality ladder helps reviewers describe why one submission is stronger than another without implying that every category is interchangeable.

Evidence rungWhat the buyer gainsQualification limit
marketing imageA quick view of the supplier’s claimNo traceable source, scope or issuer can be checked
self-declared DoCA named manufacturer or importer claimNo independent test evidence or certificate scope is shown
test report on a sampleEvidence that a sample was testedSample-to-product and production links still need checking
third-party certificate with scope + numberA named body’s written attestationScope, number, validity and exact variant must be verified
certificate covering the exact SKU/variant you are buyingEvidence linked to the item being purchasedProduction-control continuity still needs confirmation
audit/production-control evidence that keeps it valid after the sample passedEvidence that the assessed configuration remains controlled in productionThe audit scope and applicability to this supplier must be checked

Do not average the ladder. A strong certificate cannot repair a report that covers a different function. A precise declaration cannot substitute for missing production evidence. A photograph of a label cannot replace the document that explains the label.

At qualification, record each row as CONFIRM-PER-SUPPLIER until the source has been identified and checked. Then record the actual evidence rung reached. This separates the supplier’s claimed status from the procurement reviewer’s verified documentary position.

Production-control evidence can include an applicable factory audit, change-control procedure, incoming inspection record, configuration-control process or traceability procedure. The buyer should ask which control keeps the tested or certified configuration aligned with the delivered product. This is especially important where an option, variant or supply source changes after assessment.

The ladder supports comparison between bids; it does not replace the published standard. Clause interpretation still belongs with the current edition and the relevant project authority.

Turn the decision tree into tender schedules

Convert the evidence rules into six schedules. A schedule gives every supplier the same submission structure while allowing the internal evidence index to remain the controlling record.

ScheduleSupplier deliverableQualification question
Scope mapOffered functions, door context and product identifiersDoes the offered configuration meet the relevant scope branch?
Evidence indexOne row per report, certificate, declaration and markingCan each source be independently identified and checked?
Configuration crosswalkTested description mapped to the tendered variantIs there an unbroken link to the item being bought?
Production-control fileApplicable controls that maintain the assessed configurationIs evidence continuity addressed after sample testing?
Exceptions scheduleGaps, exclusions, unresolved claims and proposed substitutionsCan procurement assign a disposition without guessing?
Disposition recordProcurement’s qualification decision and reviewer basisIs the next-stage decision auditable?

The tender instruction should request source documents rather than assurances. A concise evidence clause can state the required content without pretending to reproduce the published standard.

For each offered configuration, identify whether it includes an electrically powered hold-open device for a swing door. Identify the current edition of EN 1155 relied upon and submit each test report, certificate, declaration of conformity and product or label marking as a separate indexed item. For every source, state the product and variant covered, functional scope, issuer, document number, issue date, validity as stated, relevant limitations and verification route. Attach a crosswalk from the tested configuration to the item offered. Identify missing evidence, unresolved differences and production changes in an exceptions schedule.

The clause should also state that marketing images and screenshots of document headings are not substitutes for the underlying source. Asking for the complete document allows the reviewer to inspect scope, identification and stated limitations. For en 1155 smart lock tender evidence, the position on this ladder is what the purchase decision turns on.

Table 3 — en 1155 smart lock tender evidence: the qualification schedule set.

For detailed clause construction, compare this schedule with Electric Hold-Open on a Smart-Locked Door: The EN 1155 Clause, Buyer by Buyer. The schedule should remain the same across bidders even when their source documents differ.

Require a short clarification response for every exception. A useful response identifies the missing item, supplies it, states whether it replaces an earlier document, and explains the effect on the product-to-document mapping. Do not let a revised attachment arrive without a superseded-document marker and revised index version.

Compare branches without forcing a false fit

The central comparison is between the function in the tender and the scope of the evidence offered. The table below gives procurement a decision path without making the supplier choose a convenient label.

Offered branchRelevant evidence routeEvidence that must not be substitutedQualification action
Smart lock without powered hold-openCheck the published scope for the electromechanical locking function; EN 14846 is the closer fit than EN 12209An EN 1155 document for another deviceKeep the EN 1155 branch closed
Manual door closerCheck the published scope of EN 1154An electrically powered hold-open documentOpen a separate closer branch
Powered hold-open device on a non-fire swing doorCheck the current EN 1155 scope and source-document coverageLock-only evidence or an unrelated certificateProceed through EN 1155 evidence checks
Powered hold-open device on a fire or smoke door assemblyConsider EN 14637 for electrically controlled hold-open systems and EN 1634-1 for assembly fire-resistance testingA standalone document treated as assembly evidenceAdd the assembly route
Function or door context unknownRequest a description of the actual device and openingAssumptions based on product marketingHold at scope clarification

EN 1155, EN 14846, EN 1154, EN 14637 and EN 1634-1 answer different questions. The standards decision tree works only when each evidence item is kept inside its own branch.

For fire or smoke doors, the comparison is especially important because a lock component and a complete door assembly are not equivalent evidence objects. EN 1155 Versus EN 1634-1: Which One Applies to Your Smart Lock Door provides the adjacent applicability view, while the tender tree should keep both questions visible.

A combined smart-lock tender may need parallel schedules. One line may qualify the lock’s electromechanical function, another may qualify a powered hold-open function, and a third may address the complete fire-door assembly. Keeping the lines separate prevents the strongest evidence in one branch from masking a gap in another.

Control exceptions, substitutions and production changes

An exception is any unresolved difference between the submitted evidence and the offered configuration. Capture it rather than compressing it into a supplier assurance. Common exceptions include:

  • A report that describes a product family while the offer selects a different variant.
  • A certificate whose written scope omits the offered product.
  • A declaration without an identifiable signatory, date or product reference.
  • A marking image that cannot be connected to the tendered item.
  • A source with no visible verification route or stated validity.
  • A production change with no explanation of its effect on the evidence.
  • A proposed substitute supplied without a fresh product-to-document mapping.

Use a controlled disposition for each exception: accepted for evaluation, accepted with a recorded limitation, held for clarification, routed out of scope or escalated for project-specific review. This is a qualification decision, not an installation acceptance or a final approval of the product.

Production changes deserve their own field. Ask what changed, which offered variants are affected, whether the change touches the evaluated function or configuration, and which revised evidence applies. Require the supplier to identify the evidence that remains applicable. A supplier statement that “the change is minor” does not answer the question.

Do not let a clarification response silently replace the original bid. Keep the original source, revised source, reason for change and reviewer decision in the evidence index. That history lets another procurement manager reconstruct why a bid entered technical evaluation.

If the bidder cannot provide enough information to map any source to the item being purchased, hold the affected function. Other functions may still proceed if their evidence branches are complete.

Carry evidence through survey, installation and handover

Qualification evidence describes the offered product and function. A site survey describes the opening where that product may be installed. Keep both records, but do not substitute one for the other.

For retrofit projects, the Smart Lock Retrofit Site Survey should record the existing door, frame, closer arrangement, swing direction, proposed device position and any constraints affecting the tendered function. The survey can reveal that the EN 1155 branch is relevant—or that it is not. It cannot turn a report for a sample into evidence for the delivered product.

For workplace and access-controlled doors, the Office Smart Lock Site Survey provides a useful parallel record for door use, access-control interfaces and the proposed responsibility split. Again, the site record determines fit; the supplier document set determines the evidence behind the product.

The handover index should identify the as-built product and variant, the document versions supplied for that installation, the installed power arrangement as commissioned, functional test outcomes, unresolved exclusions and the responsible party for each item. A product marking photograph can close the link between the qualified variant and the installed item.

Keep the smart lock’s commissioning record separate from the powered hold-open device’s commissioning record when the functions are supplied separately. The test report is not a commissioning certificate, and a successful lock function does not establish that the hold-open assembly behaves as tendered.

Readers comparing approaches usually start with the smart locks for classrooms. That is the same question en 1155 smart lock tender evidence has to answer here.

Issue an auditable qualification disposition

Qualification closes with a disposition that another reviewer can understand without reconstructing the entire conversation.

DispositionMeaningNext action
Pass to technical evaluationScope, source identity, configuration mapping and exceptions are sufficiently documentedCarry the evidence index into technical and commercial evaluation
HoldA named source, exact mapping or significant exception is missingIssue a bounded clarification request
Out of scopeThe offered function does not fit the selected standards branchRoute the function to its applicable evidence process
EscalateThe remaining question depends on the project authority or door-assembly specialistObtain a written project-specific decision

Use this EN 1155 evidence checklist before signing the disposition:

  • The offered function is stated without marketing shorthand.
  • The current published EN 1155 edition is identified.
  • The tendered product and variant are fully identified.
  • The door and assembly context are recorded.
  • Every source document has one evidence role.
  • Report and certificate numbers are visible.
  • Scope and validity are recorded as stated.
  • The tested sample is described.
  • The tested configuration maps to the tendered item.
  • The certificate scope covers the required variant, or the gap is recorded.
  • The declaration identifies the declaring entity, signatory and date.
  • Product or label marking is tied to the exact item.
  • Production-control evidence addresses the assessed configuration.
  • Unresolved evidence gaps appear in the exceptions schedule.
  • Substitution and change-control routes are defined.
  • Site-survey dependencies are separated from product evidence.
  • The handover index will identify the as-built item and document versions.
  • The reviewer, date and disposition are recorded.

The qualification file should retain the final evidence index, the exception register, the disposition rationale and the versions of documents actually relied upon. Do not save only the supplier’s final summary; preserve the source trail that made the decision possible.

A disciplined qualification stage does not guess at coverage or treat a printed mark as a complete evidence package. It routes each function, identifies each document and exposes any gap before the bid moves forward.

Ready to turn the checklist into a supplier pack? Share the tender scope, candidate product list and target market with Smart Lock Factory for an evidence-gap review before clarification deadlines close.

When the file is ready, request a quote against the written requirement.

Coșul dumneavoastră
Experiența dumneavoastră pe acest site va fi îmbunătățită dacă permiteți utilizarea cookie-urilor. Politica privind cookie-urile
Chat on WhatsApp