SLK-9936S Explained: Reading the Product Data Sheet Line by Line

SLK-9936S Explained: Reading the Product Data Sheet Line by Line

Procurement managers evaluating a hotel lock need more than a list of features: each line must show what is documented, what it means for the project, and what evidence is still missing. This slk 9936s specification decode uses the first-party SLK-9936S hotel lock data sheet and its catalogue record to turn those ambiguities into evaluation decisions.

Direct answer. The one-line answer — slk 9936s specification decode is the working record for slk 9936s specification decode. slk 9936s specification decode is worthless until slk-9936s is attached to it as evidence. A slk 9936s specification decode is a component-level look at how the technology behaves. slk 9936s specification decode is where the limits sit. slk 9936s specification decode is verified on the dated product page.

Throughout, slk 9936s specification decode means what slk 9936s specification decode sets out. It is a working definition of slk 9936s specification decode drawn from the evidence below. It is valid for the specific market and product, not as a general claim.

  • Establish the reach — confirm on the dated product page for the specific SKU behind slk 9936s specification decode
  • Establish the edge — record where the technology in slk-9936s stops working
  • Establish the reserve — name the mechanical path that remains if slk 9936s specification decode fails
  • slk 9936s specification decode runs this sequence, and slk 9936s is the record it produces.

It is a regulatory brief in the narrow sense that it defines the evidence needed for local project review. It is not a code approval, a certification statement, or a substitute for the relevant authority. Confirm on the dated product page for the specific SKU before releasing any configuration or purchase decision.

Evidence status and decision boundary

The source set contains three different evidence levels. First, a product-specific specification block lists the door thickness, credential format, read window, response time, power, cycle count, record capacity, body, latch, management modes and emergency access. Second, the catalogue record classifies the SLK-9936S as an RFID hotel card door lock in a satin finish and supplies access, platform, body, power, fit, packing and documentation fields. Third, this brief separates those statements from project evidence that only the supplier, installer and local authority can settle.

That hierarchy prevents a category label from becoming a technical claim. For example, catalogue categories include several credential types, but the SLK-9936S access field records RFID/IC card and mechanical override only. Do not infer passcode/keypad, fingerprint, mobile app or remote unlock from a category label. Likewise, a style label containing ANSI is not by itself an approval or conformity statement.

flowchart TD
A[Product-specific field] --> B[Literal transcription]
B --> C[Procurement interpretation]
C --> D[Dated evidence request]
D --> E[Decision gate]
E --> F[Configuration release]
E --> G[Clarification hold]
Evidence itemWhat it can establishWhat it cannot establish
Dated product page for the specific SKUProduct identity and published fields at a stated revisionLocal-project approval or installed performance
Dimension drawingsGeometry for the cited SKUSite fit before door measurement
Test report and traceabilityResults under a stated method and samplePerformance under unseen project conditions
Supplier responseAgreed configuration and promised documentary deliverablesAcceptance by a local authority

Annotated field map: the lines that drive release

The following map is the compact reading of the SLK-9936S hotel lock data sheet. It preserves the source value, then states the narrow procurement question. It does not turn a missing field into a negative capability claim. All values below require confirmation on the dated product page for the specific SKU before they become contractual requirements.

FieldSource wordingProcurement meaning
IdentityRFID Hotel Card Door Lock, Heavy-Duty ANSI, satin finishTreat style words as catalogue descriptors, not standalone approvals
CredentialRFID/IC card: Standard; Mifare-1 13.56 MHzVerify the card standard, sample format and encoder-card pairing
Read window0–5 cm; read time under 0.25 secondsAgree the test geometry, card sample and pass criterion
ManagementHotel lock management softwareVerify encoder, issuance and permission workflow
NetworkStandalone lock; PC-linked card encoder; no in-room network requiredSeparate credential operation from an in-room network dependency
ModesStandalone or centralized database modesAsk which mode is quoted and how records are transferred
Access rightsGuest card issuance, floor/room permissions and check-in validity windowsRequire named rights and time-window tests
RecordsUnlock records; up to 1,000 audit/event recordsConfirm the storage limit, export format and retention
Power4 × AA alkaline; more than 15,000 battery operating cyclesRequest the test conditions; do not translate cycles into years
BodyStainless steel plus alloy; brushed stainless steelConfirm material allocation and visible finish
Cylinder and latch5-pin high-security profile cylinder; 3-point latchDo not infer an attack rating; verify the faceplate and operation
Door36–100 mm; hotel wooden or metal doorsThickness is one fit dimension, not full compatibility
Packing445 × 415 × 365 mm; six units per carton; 18.60 kgVerify the latest packing record, not handling suitability
Environment—No environment value is recorded in this catalogue row; request project evidence
DocumentsDimension drawings, installation guide and full datasheet on requestPut the exact deliverables and revision status in the RFQ

For this slk 9936s specification decode, the table should operate as an issue register. A raw value is closed only when a dated evidence file, an agreed test criterion or a signed project decision attaches to it.

Standards-style words that need translation

Catalogue tables often compress different kinds of information into familiar labels. In the SLK-9936S record, Standard appears in the access rows, Heavy-Duty ANSI appears in the style field, high-security appears in the cylinder description, and centralized database appears in platform vocabulary. These phrases should be transcribed exactly, but they should not carry more legal or technical weight than their source allows.

Create two columns in the evaluation log: source wording and procurement meaning. For Standard, ask whether the supplier means included in the standard configuration, a card-reading technology or another catalogue attribute. For Heavy-Duty ANSI, ask for the exact dimensional or performance basis and the document that supports it. For high-security, ask which cylinder datum is being referenced. For centralized database, ask what records are central, where the database runs and how standalone operation changes.

None of these translations is a conclusion about local approval. They are questions that prevent a label from silently becoming a requirement. If the supplier provides supporting evidence, attach it to the same line and preserve the original wording beside the interpretation.

CONFIRM-WITH-LOCAL-PRODUCT-REVIEW: Verify which product documents, test reports or authority positions are relevant to the named wording in this jurisdiction.

Blank fields, source labels and negative conclusions

Blank or broad cells are evidence too. The environment field is a dash, which means no environment value is recorded in this row. It does not mean the product has been tested for every environment, nor does it create a blanket negative claim. A procurement brief should label the field as not evidenced and state the consequence for the project.

The same discipline applies to labels such as Standard and multiple finish options. Standard may describe the catalogued access configuration, while multiple finish options may come from a broader product block than the satin catalogue row. Neither expression specifies a project variant. Ask for the exact ordered configuration and keep the source wording alongside the answer.

Where a data sheet is silent, use one of four dispositions: evidenced, not evidenced, not applicable to this configuration, or open pending supplier response. Do not convert silence into a technical feature. The buyer can still make a commercial decision with a documented gap, provided the risk owner and closure condition are named.

This discipline protects the RFQ from contradictory documents and makes later audits faster.

Credential, reader and override lines

The credential line is precise but not complete. The source specifies the RFID Mifare 1 13.56 MHz credential and gives a read distance of 0–5 cm and a read time below 0.25 seconds. In procurement language, these are recorded operating figures under the supplier’s source conditions, not a guarantee for every card, reader position or door condition.

The reader result also depends on a defined test setup: card type and quality, approach angle, mounting position, reader surface condition and the point at which timing starts. Ask whether the acceptance test uses the issued card population or a separate reference card. Do not convert the field into a broader claim about guest experience; set a repeatable site test instead.

The access row records a mechanical override key. That line answers an equipment-access question, not an egress-design question. Ask how the override is operated, keyed, controlled and documented, and request the relevant installation drawing.

Use SLK-9936S: Card, Code, Biometric and App Options Compared to structure the credential-side questions without assuming that a capability outside the access field belongs to this SKU.

Management software and record lines

The hotel lock management software line describes a workflow built around guest cards and a PC-linked card encoder. The catalogue places the lock in a standalone lock configuration and says no in-room network is required. That statement should be read narrowly: a standalone lock can still depend on a PC-side issuance process and a card carrying programmed rights.

Four functions deserve separate acceptance questions. Guest card issuance must produce the intended card population. Floor/room permissions must map to the hotel’s actual authorization structure. Check-in validity windows must follow the intended stay logic. Unlock records must be retrievable and attributable to an agreed record identity. The source also lists up to 1,000 audit/event records; ask whether the count covers lock events, encoder actions or another stored category.

Ask for the PC-linked card encoder workflow in writing, including how card data is brought to the lock, how room rights are changed, how a card is cancelled and how unlock records are exported. The product-specific block also lists multilingual management software; identify the quoted languages, where the language setting appears and whether the selected configuration includes that feature.

The source mentions standalone or centralized database modes, but the exact configuration and transfer method are procurement decisions. Identify the operating mode being quoted, the device that holds the master records and the route by which events and permissions reach the lock.

Guest data turns this into a governance question as well as a feature question. The buyer should define who may issue cards, view guest links, export records, retain logs and change permissions. The supplier can provide product behaviour; the project team must decide its own access and retention rules.

CONFIRM-WITH-LOCAL-DATA-GOVERNANCE: Verify the applicable privacy, retention and access-control obligations for guest records and the operating organisation.

Body, cylinder, latch and emergency-access lines

The body line combines stainless steel plus alloy with a brushed stainless steel satin finish. The earlier product-specific block also says multiple finish options, while this catalogue row identifies satin. Treat that as a request to confirm the ordered finish and visible component allocation, not proof that every finish is available for every project.

The mortise line records a 5-pin high-security profile cylinder, and the product-specific block records a 3-point latch. The words high-security and Heavy-Duty ANSI are source descriptors. They do not establish an attack rating, fire rating, code approval or tested performance level unless separate, current evidence explicitly says so. Request the dimension drawing and test evidence for any claim that affects selection.

Emergency access is a separate line from mechanical override. Ask whether the feature addresses operator entry, lock-side recovery, power depletion, fire-rated assembly requirements or another site condition. The answer determines which drawing, procedure and authority review are needed.

Use Will SLK-9936S Fit Your Door? A Fit and Preparation Guide for the site-measurement workflow. The useful distinction is simple: material and latch descriptions belong to the product; frame, rebate, backset and preparation requirements belong to the approved door set.

CONFIRM-WITH-LOCAL-FIRE-EGRESS-AUTHORITY: Verify the applicable fire and egress requirements for each door assembly and the evidence the approving authority will accept.

Power and operating-evidence lines

The power source is 4 × AA alkaline batteries, and the product-specific block records battery operating cycles above 15,000. The cycle figure is useful only with its test definition. Ask for the number of cycles, door action counted per cycle, reader use during the test, temperature condition and battery set used.

Do not translate operating cycles into years of service without an agreed duty profile. Likewise, the catalogue environment field is blank. That absence does not establish suitability or unsuitability for an outdoor, humid or corrosive installation; it means the current row supplies no environment evidence. Request a dated environmental statement for the specific project condition if location matters.

Four other questions belong in the same release: what low-battery indication is provided, how the lock behaves at depletion, what emergency power method is permitted, and how cells are replaced without compromising the access-control plan. These are questions, not asserted features. Require the response to enter the RFQ as a documented answer or an explicit hold.

Door-fit and packing lines

The applicable door thickness line is 36–100 mm, and the catalogue lists hotel wooden and metal doors. Thickness establishes only one boundary. The project also needs door-leaf construction, rebate, backset, faceplate, mortise case, spindle, handle or lever, strike keeper, latch projection and required clearances.

The packing line records a carton of 445 × 415 × 365 mm, six units per carton and a gross weight of 18.60 kg. Use it to plan handling inputs, but confirm the current packing record before relying on it. Carton geometry does not prove route clearance, unloading capacity or installation access, and unit count does not reveal the exact order configuration.

Ask the supplier to state the packing basis in the quotation response: master carton or export carton, number of units under the ordered configuration, gross-weight basis and the revision of the packing record. This avoids treating a catalogue line as an evergreen logistics promise while keeping the decision tied to the exact SKU.

Use Will SLK-9936S Fit Your Door? A Fit and Preparation Guide to build the field measurements, but keep the approval trail in the project file. Door schedule, drawing revision and field measurement should point to the same configuration. For retrofit evidence capture, Smart Lock Retrofit Site Survey provides a separate site-context record; do not transfer its assumptions into the hotel-lock release.

Local evidence schedule for the regulatory brief

No country, city or project authority is included in the row, so this brief cannot state which market rules apply. The correct output is a per-project evidence request.

CONFIRM-WITH-LOCAL-PROJECT-AUTHORITY: Verify the applicable code, fire, egress and accessibility requirements for the exact project location and door assembly.

Review questionEvidence to demandWhy it changes release
Product identity and revisionDated product page, drawings and SKU/finish cross-referencePrevents configuration drift
Door and assembly approvalProject door schedule, hardware schedule and installation detailAligns the product with the approved door set
Radio and credential requirementSKU-specific report and local authority or consultant positionDetermines which evidence is acceptable
Mechanical operationCylinder, latch, override and installation test criteriaTests function without converting labels into claims
Guest recordsSoftware workflow, permission roles, retention and export descriptionEstablishes operating accountability
Battery handlingSupplier handling, transport and disposal instructionsAddresses site logistics through documented evidence
Accessibility and egressProject-specific review and written acceptanceKeeps approval with the relevant local parties

CONFIRM-WITH-LOCAL-ACCESSIBILITY-AND-EGRESS: Verify the applicable accessibility, fire and egress evidence for the installed door assembly and operating use.

The RFID reader description may prompt a radio question, but the table does not establish which radio rules apply to the project. Demand the dated test document for the exact SKU, identify the method and result, and let the relevant local party decide whether it addresses the requirement. Do not convert a frequency statement into a market statement.

CONFIRM-WITH-LOCAL-RADIO-REQUIREMENTS: Verify the applicable radio requirements and evidence for the exact SKU and market.

The most important distinction is between a product fact and a project judgement. A material, cycle count, cylinder description or read time can come from first-party documentation. Fire performance, accessibility, egress and market acceptance need the project authority or applicable consultant because they depend on the assembly, location and use. Keep those evidence streams separate in the approval record.

CONFIRM-WITH-LOCAL-PROJECT-REVIEW: Confirm which party has approval authority for the exact project and which documents must be included in that review.

Decision table: release, condition or hold

The annotated map becomes useful when every line receives a disposition. Do not approve the lock merely because a specification is present. Approve it only when the line supports the intended configuration and the missing evidence has a named owner and closure path.

Specification lineRelease evidenceCondition or hold trigger
Model and finishDated SKU and finish page with matching drawingsFinish or revision differs from the request
CredentialIssued-card sample and agreed reader testCard population or test method is unclear
ManagementEncoder and permission workflowOperating mode or export ownership is unclear
RecordsRetention and export agreementCount or data fields remain unresolved
Door fitMeasured schedule and matching drawingOnly thickness has been checked
Emergency and mechanical operationOperating procedure and installation drawingEgress role has not been approved
PowerDocumented duty profile and cycle basisNo test definition has been supplied
EnvironmentDated site-specific evidenceThe condition falls outside the recorded data
Regulatory evidenceWritten local positionAuthority or acceptance criteria are unknown
PackingCurrent packing recordCarton basis differs from the project need

Use three labels consistently: release means the evidence supports the stated use; condition means release may proceed only after a named action; hold means no irreversible commitment until the gap is closed. The distinction should appear in the evaluation log, not only in meeting notes. A supplier answer without a matching document revision remains conditional.

RFQ schedule for locking the evidence

Copy the relevant lines into the request-for-quotation schedule. This is not a generic RFQ template: it is a closure mechanism for the specific evidence gaps found in this decoded specification. Each response should name the document, revision, configuration and responsible confirmer.

RFQ lineSupplier response requiredEvidence attachment
Model and finishExact designation and satin finish confirmationDated product page
GeometryApplicable door thickness and full preparation dimensionsDimension drawing
CredentialCard format and issued-sample compatibilityCard and encoder statement
Read performanceDistance and response-time methodTest protocol or result
AccessRFID and mechanical override key configurationConfiguration sheet
ManagementSoftware, operating mode and PC-linked card encoderWorkflow description
PermissionsIssuance, floor/room rights and validity windowsTest cases
RecordsUnlock records count, fields and exportData dictionary
Power4 × AA source and cycle definitionTest basis
Emergency accessMethod, procedure and limitationsProcedure sheet
DocumentationInstallation guide and full datasheetDocument register
OEM/ODMLogo, finish, packaging, manuals and configuration scopeSigned scope

Also request the project-specific evidence named in the local review schedule, but keep it separate from the product data sheet. The supplier should not be asked to decide local code, authority acceptance, accessibility strategy or the hotel’s guest-data governance. Those owners remain with the project team.

Ask the supplier to mark any changed value as an exception and provide the superseding dated source. Silent substitutions turn a precise RFQ into an ambiguous one. For the same reason, every document reference should include the SKU, finish and relevant drawing revision rather than a generic product name.

Site acceptance plan

Specification review and acceptance testing are separate stages. The test plan below is an illustrative sequence for a procurement manager, not a statement that any result has already been achieved. Pass criteria must be agreed before installation, using the released configuration and the applicable project requirements.

StageTestEvidence to retain
IncomingIdentity, finish, accessories and mechanical override key operationSigned receiving record and photographs
PreparationDoor thickness, backset, faceplate, rebate and strikeMeasured sheet and marked drawing
PowerCorrect cells, indication and documented depletion responseTest log and configured cell basis
CredentialRepresentative card read and responseCard identifiers and timing method
ManagementEncoder issuance, permissions and validity windowsTest cases and issued card
AuditUnlock records appear and export in the agreed formSample export
MechanicalLatch operation, door closing and override procedureObservation sheet
HandoverDrawings, guides, supplier response and local approvalsDocument register

For the read test, agree the card sample, approach direction, reader position, start and stop points, number of attempts and environmental context before the supplier or installer records a result. For record tests, agree which event creates a row, what identity fields are present, how duplicates are handled and how the export is checked.

Any project-specific pass criterion remains subject to the relevant local review. The supplier can demonstrate product behaviour against an agreed method; it cannot issue the project’s code or authority acceptance.

CONFIRM-WITH-LOCAL-ACCEPTANCE-AUTHORITY: Confirm which acceptance evidence and sign-offs are required for the installed door and operating process.

Illustrative evaluation and brief disposition

The following is an illustrative evaluation scenario, not a customer case. A procurement manager is reviewing a hotel refurbishment with a mix of wooden and metal door leaves. Two candidate leaves fall within the recorded 36–100 mm thickness range, but that range still needs confirmation and cannot prove full compatibility on its own. The tempting conclusion is that both are ready; the data sheet does not support that conclusion.

The first step is to freeze identity and revision. The manager obtains the dated product page, dimension drawing and finish evidence. Next, the door schedule is measured against backset, faceplate, mortise, strike and clearances. The management line is then tested: the team chooses the intended standalone lock or centralized database mode, maps guest-card issuance to floor and room rights, and defines the validity-window cases. Unlock records receive a retention and export owner.

Three holds remain. The team lacks a local written position on the required project review, the environment is not described by the catalogue row, and the mechanical emergency procedure has not been matched to the approved door assembly. The manager issues three document requests rather than treating the feature list as approval.

The same question is worked through in more detail in the smart lock network architecture. That is the same question slk 9936s specification decode has to answer here.The disposition should read: conditional approval for sampling and technical review; no production release until the three holds close. This preserves momentum without turning a provisional answer into a project promise. The evaluation record should also show who owns each hold, what evidence will close it and which configuration would be affected if the answer changes.

For the measurement side of this, see the smart lock communication architecture. That is the same question slk 9936s specification decode has to answer here.

Package for final release

Attach the dated product page, dimension drawing, installation guide, full datasheet, credential samples, management workflow, test record, packing record and local evidence. The final request-a-quote package should identify the exact model and finish, approved door types, quoted management mode, documentary deliverables and any remaining exceptions. Use Ordering SLK-9936S: What to Lock Down on the Purchase Order to translate the evaluation into order controls, then request a quote with the same configuration reference.

Procurement release is warranted only when the product lines, test evidence and project approvals refer to the same SKU and revision. Until then, the specification is not a gap to be smoothed over; it is a list of decisions that still needs an owner.