Slk 9962s door fit notes: procurement fit notes for the SLK-9962S covering door thickness, backset, mortise clearance, site measurement, approval and RFQ.

Közzétéve:: dec. 15, 2022

The SLK-9962S Fit Envelope: Door Thickness, Backset and Clearance

The SLK-9962S Fit Envelope: Door Thickness, Backset and Clearance

Use the slk 9962s door fit notes below as the technical annex to an SLK-9962S bid. Procurement should treat the published door-thickness range as only one part of the fit envelope: backset, mortise geometry, rebate, strike, frame, panel and service clearances must also be resolved against the actual door.

Direct answer. Condensed to the essential point, slk 9962s door fit notes turns a request into a decision record. slk 9962s door fit notes and slk-9962s are the two parts of slk 9962s door fit notes most often skipped. A slk 9962s door fit notes treats one component on its own terms. slk 9962s door fit notes names the tests that close it. slk 9962s door fit notes is not accepted on a headline figure.

  • Verify the function — confirm on the dated product page for the specific SKU behind slk 9962s door fit notes
  • Verify the boundary — record where the technology in slk-9962s stops working
  • Verify the backup — name the mechanical path that remains if slk 9962s door fit notes fails
  • For slk 9962s door fit notes, the order below is fixed and slk 9962s is the reference point.

The catalogue record identifies the SLK-9962S as an RFID Hotel Electronic Door Lock with Slim Handle. It records a door-thickness range of 36–100 mm and suitability for hotel wooden or metal doors, but it does not publish a backset, lock-case size, panel dimensions or complete cutting template. Confirm on the dated product page for the specific SKU before using any model-specific value for approval.

The procurement rule is straightforward: do not approve a door schedule from a nominal thickness alone. Issue the questions and evidence requirements below, require the supplier to identify the drawing revision behind each answer, and close every open interface in the signed fit record.

Catalogue boundary for the fit bid

The following table separates recorded facts from information the supplier must return. It is deliberately limited to interfaces that can affect installation or operation.

Bid fieldRecorded catalogue baselineRequired procurement response
ModelSLK-9962S RFID Hotel Electronic Door Lock with Slim HandleState the exact SKU and dated drawing revision
Door thickness36–100 mmConfirm the range on the dated product page for the specific SKU and compare it with site measurements
Door typesHotel wooden / metal doorsIdentify the actual leaf construction and any special fabrication requirement
Mortise and cylinder5-pin high-security profile cylinderObtain the lock-case drawing, cylinder datum and cut template; do not infer case size from the cylinder profile
MaterialStainless steel + alloyConfirm how the specified construction applies to the ordered configuration
FinishStainless steel brushed (satin)Confirm the finish selected for the project
Power4 × AA alkaline batteriesRequest battery-compartment and service-clearance drawings
Environment—Leave temperature and humidity unstated until the supplier supplies dated evidence
DocumentationDimension drawings, installation guide and full datasheet available on requestMake the applicable dated documents part of the bid response

Every value copied from the catalogue is a baseline for comparison, not final approval evidence.

Define the fit envelope as interfaces

A fit envelope is the combined set of physical conditions under which the lock can be installed, operated and serviced. For procurement, divide those conditions into three interfaces: the door-side interface, the frame-side interface and the user/service interface. A site can satisfy one category while still failing another.

For example, a door leaf may be within the recorded thickness band but have insufficient room for the panel cutout. Alternatively, the mortise opening may be correct while the strike keeper is positioned incorrectly for the frame. The approval record should therefore identify the interface, measurement, drawing, result and responsible signatory for each item.

flowchart LR
  A[Measure door leaf] --> B[Record thickness]
  B --> C[Measure spindle and cylinder datums]
  C --> D[Check rebate and lock case]
  D --> E[Check strike and frame]
  E --> F[Check panel and service space]
  F --> G[Compare with dated drawing]
  G --> H[Approve or hold]

This flow prevents an early thickness check from becoming an accidental approval of the complete installation.

Create one traceable door measurement record

Door leaf measurement should use the same units, tools and datum names throughout the project. Record the door identity, hinge side, opening direction, leaf construction, frame type and whether the door is new or retrofit. Include photographs with a scale visible, but treat them as supporting evidence rather than substitutes for dimensional data.

Use the Office Smart Lock Site Survey structure for a room-level record and the Smart Lock Retrofit Site Survey for an existing opening. The hotel door lock dimensions required below should be captured on a project-specific form before the lock order is released.

Measurement recordRequired observationAcceptance source
Leaf thicknessUpper, middle and lower readings near the lock axisDated product page and supplier drawing
Edge profileSquare, beveled, rounded or irregular; photograph each conditionSupplier cut template
Spindle datumDistance from the latch edge to the spindle centerlineDimension drawing
Cylinder datumDistance from the latch edge to the cylinder centerlineDimension drawing
RebateWidth, depth, position and square at the lock axisSite measurement and cutting template
Lock caseRequired case envelope through the leafDimension drawing
Bore interfacesCylinder and spindle opening requirementsInstallation guide and cut template
Strike and keeperFaceplate, keeper, latch and frame positionsSupplier interface drawing
Panel and handleCutout envelope, handle sweep and service accessPanel and handle drawings
Adjacent hardwareDoor closer, hold-open device and other intersecting hardwareCoordinated site record

Ask the supplier which dimensions are mandatory and which are reference dimensions. A reference dimension may aid site planning, but it should not be treated as permission to cut or modify the door.

Test the published thickness range against the actual leaf

Treat the published SLK-9962S door thickness range of 36–100 mm as an eligibility band rather than proof of fit. The catalogue does not state a manufacturing tolerance, edge-zone limitation or alternative for a leaf outside that band.

Take at least three thickness readings near the lock axis and record each one. Do not average a warped or tapered leaf into a single acceptable number. Check whether the edge and face remain consistent through the mortise zone, particularly on a metal door assembled from different sections or with a folded edge.

Wood and metal doors require different review methods. A timber leaf may need attention to its stile construction and machining condition, while a metal leaf may require coordination with the folded edge, weld seam and frame. Neither condition can be inferred from the catalogue’s door-type description.

If any reading is close to the published boundary, request the supplier’s dated guidance for that condition rather than extending the range informally. If a reading falls outside the recorded band, place the door on hold and ask for a documented alternative or approved project-specific resolution.

Resolve backset and spindle datums before approval

No backset value appears in the supplied SLK-9962S catalogue record. The procurement response therefore must not assign a nominal SLK-9962S backset from memory, a generic lock template or a comparable product.

At every relevant door, record two horizontal measurements separately: the distance from the latch edge to the spindle centerline and the distance from the latch edge to the cylinder centerline. These distances support different installation decisions and should not be combined under one ambiguous label. The applicable SLK-9962S backset must be identified from the supplier’s dimension drawing, with its datum stated explicitly.

Require the drawing to show the relationship among the lock edge, spindle, cylinder, latch and door edge. Also request the spindle diameter, length requirement and permitted relationship between the spindle and cylinder bore. These are drawing questions, not asserted SLK-9962S specifications.

Check the door edge for bevel, taper or an irregular machining profile. Ask whether the spindle and cylinder locations remain valid at that edge condition, and whether a particular handing or opening direction requires a different cut arrangement. Do not let an installer select a template without written approval of its revision.

Match the mortise case to the door rebate

The catalogue’s cylinder-profile field does not disclose the mortise case envelope. Obtain a dimensioned drawing that shows the case width, height and depth, faceplate position, screw centers, cylinder opening, spindle relationship and required door rebate. The cut template should use the same revision as that drawing.

The mortise clearance assessment must compare the supplier drawing with the measured rebate width and depth, the distance between the edge and the cylinder axis, and the space available around the case. Record the rebate’s straightness rather than relying on a single width reading. A nominally correct opening can still distort the case if its sides are not parallel.

For any alteration, identify the affected drawing, proposed operation and responsible approval before work begins. Keep a record of who accepted the change and whether the supplier issued a revised installation instruction.

CONFIRM-WITH-LOCAL-INSTALLER: Confirm project-specific door, egress, access-control and installation requirements with the responsible local authority or qualified installer, and retain dated evidence in the approval file.

Control the latch, strike and frame interfaces

The lock-side fit is incomplete until the latch, strike plate, strike keeper and surrounding frame are coordinated. The catalogue record does not provide these interface dimensions, so require them in the supplier’s drawing package rather than assuming a standard preparation.

The strike plate clearance check should confirm the faceplate position, screw pattern, latch engagement and frame material. Record the keeper location from the closed door position and check that the latch enters without striking the keeper edge. If the door must remain open for inspection, also record the frame rebate, reveal and any closing hardware.

A door closer, hold-open device or other intersecting hardware can change the relationship between the lock and frame. Include those items in the survey even when they are outside the lock supplier’s scope. Their final positions should be shown on the same coordinated drawing used for the lock.

The acceptance observation is functional as well as dimensional: the latch should engage without forced alignment, the door should close from the latched position, and the strike should remain seated without visible interference. These observations do not replace the supplier’s drawing; they verify that the installed geometry matches the approved basis.

Reserve panel, handle and service clearances

The product name refers to a slim handle, but that wording does not establish a panel size, handle projection or installation clearance. The supplied catalogue row does not publish panel dimensions. Request the cutout drawing, panel position, fixing pattern, handle geometry and the distance from the door edge to each relevant datum.

Check that the handle can move through its intended range without contacting the door face, frame, trim or adjacent hardware. At the same time, preserve access to the mechanical override, card-reading area and battery compartment.

Ask the installer to show how the escutcheon or panel seats against an uneven edge and how cable or service routes are handled, if any are part of the supplied configuration. Do not infer concealed routing, waterproofing or maintenance access from the product category.

The final fit record should identify which components must remain reachable after the door is hung and the frame is finished. This is especially important where a closer mechanism, access-control reader or inspection cover occupies the same working area.

Define the door and operating boundary

The catalogue records hotel wooden and metal doors as the applicable door types. It does not establish suitability for every timber species, metal gauge, edge construction or frame arrangement.

The catalogue’s Environment field is —, meaning that no environmental operating range is supplied in this record. Leave temperature, humidity, weather exposure and corrosion conditions outside the approved specification until dated evidence is provided for the exact SKU. Do not convert the absence into a statement of capability.

Separate mechanical fit from the management layer. Card permissions, guest-card issuance, unlock records and software configuration do not prove that the lock fits a door. Conversely, a good physical fit does not establish the operating environment or the management scope.

Ask the supplier to identify any conditions that would change the cutout, battery arrangement, finish, documentation or installation method. Put those conditions in the response schedule so that a site variation becomes a controlled change rather than an installer’s informal decision.

Classify each interface before scoring the bid

Use these slk 9962s door fit notes to classify every interface as baseline, conditional or open. A baseline has a recorded value and an identified source. A conditional item has a known requirement but still depends on the actual door or dated drawing. An open item has no adequate evidence and cannot support approval.

InterfaceEvidence available nowInitial statusClosure required
Leaf thicknessRecorded 36–100 mm rangeBaseline, subject to site comparisonThree-point site record and dated product-page confirmation
Backset and spindleNo catalogue value suppliedOpenDimensioned drawing with explicit datum and cut template
Mortise case and rebateCylinder profile recorded; case geometry absentOpenCase drawing, rebate schedule and approved cut template
Latch, strike and frameGeneral component scope onlyOpenInterface drawing and coordinated site measurement
Panel and handleSlim-handle name; no panel dimensions suppliedOpenPanel, handle and service-clearance drawings
Door constructionHotel wooden or metal doors recordedConditionalActual leaf and frame construction
Operating environmentEnvironment field is —OpenDated product evidence for the specific SKU
DocumentationDrawings, guide and datasheet available on requestConditionalIssue of current controlled documents

Do not convert the table into a weighted score before the evidence is complete. A commercially attractive response can still be technically unapprovable if the backset, cutout or strike geometry remains open. Resolve the physical interfaces first, then evaluate the complete bid against the project requirements.

Issue fit clauses that require evidence

The RFQ should ask the supplier to complete a technical response schedule instead of relying on a general statement that the lock is suitable. Each response should identify a document, revision and date, followed by the dimensions or acceptance condition proposed for this project.

ClauseSupplier response requiredSupporting evidence
F-01 IdentityConfirm the exact SLK-9962S configurationDated product-page extract and model identification
F-02 ThicknessState the applicable range and site-fit ruleDated product page plus measurement instruction
F-03 BacksetDefine the controlled datum and valueDimension drawing
F-04 CuttingSupply the case, panel, cylinder and spindle templateMarked installation drawing
F-05 StrikeShow latch, faceplate and keeper geometryInterface drawing
F-06 Service spaceShow access to override and battery compartmentPanel and service drawings
F-07 Door constructionState applicable and excluded door conditionsInstallation guide and dated product page
F-08 EnvironmentSupply dated limits or state that no limit is publishedDated product evidence
F-09 VerificationDescribe representative-door sample checksSample record and signed approval sheet

Require model-specific answers to be traceable to the dated product page for the specific SKU. If the supplier cannot provide a dimension, the response should say so and identify the technical owner who will close the item. Silence must not be interpreted as acceptance of the buyer’s proposed value.

Use a sample as verification, not as a substitute

A representative-door sample is useful when it tests the interfaces identified in the bid. Select a door with the same thickness range, edge construction, frame arrangement and relevant hardware as the project door. A convenient display door with different construction does not validate the project installation.

Begin with a paper or temporary fit where possible. Check the case position, spindle and cylinder locations, panel placement, latch alignment and service access before making irreversible changes. Record every interference and the corrective action proposed, then compare the corrected arrangement with the controlled drawing.

Operate the intended access and override methods named in the approved functional schedule. Observe closure from the latched position, frame seating and access to the battery compartment. Photograph the completed test and attach the observation record to the fit dossier.

Sample approval confirms one tested arrangement. It does not replace the dimension drawing, revision control or site measurement for other doors. Any production variation that affects thickness, edge profile, frame position or hardware must return to the same approval process.

Illustrative metal-door evaluation

The following is an illustrative evaluation sequence, not a customer case or a claim about a particular installation. It demonstrates how the bid should work when the thickness check is satisfactory but the backset remains unresolved.

First, the site record captures three door leaf readings near the lock axis, the edge profile, the frame arrangement and the positions of the closer and strike. The leaf readings fall within the published 36–100 mm band. That closes only the thickness eligibility question; it does not approve the lock for that opening.

Second, the supplier returns a dimension drawing with separate spindle and cylinder datums. The surveyor compares those datums with the recorded measurements, while the installer checks the proposed case against the metal leaf rebate and folded edge. Any required fabrication remains on hold until the affected drawing and site record are reconciled.

Third, the supplier supplies the panel and service drawing. The reviewer checks the handle sweep, override access and battery access against the installed frame and adjacent hardware. The strike and keeper are then checked against the final closed-door position.

The resulting decision record states that thickness is confirmed, backset is conditionally accepted against drawing revision X, mortise and strike clearances are accepted for the sample, and panel clearance is accepted subject to the recorded survey. Any field change returns the affected interface to hold status.

Return a bid-compliance schedule

The compliance schedule converts the fit bid into a document that can be marked and signed. A blank status cell is preferable to an unsupported compliance statement.

IDCompliance requirementEvidence referenceStatus and sign-off
FIT-01Exact model and configuration identifiedSupplier to completeSupplier to complete
FIT-02Thickness confirmed against dated product evidenceSupplier and surveyor to completeSupplier and surveyor to complete
FIT-03Backset and spindle datum definedSupplier to completeSupplier to complete
FIT-04Case and panel template issuedSupplier to completeSupplier to complete
FIT-05Latch, strike and frame interface verifiedSupplier and installer to completeSupplier and installer to complete
FIT-06Service and operating clearances verifiedSupplier and installer to completeSupplier and installer to complete
FIT-07Representative-door sample recordedSupplier to completeSupplier to complete
FIT-08Open deviations formally closedProject approver to completeProject approver to complete

Each completed row should show the document title, revision, date, measured result and approving role. A generic attachment list is not enough because the reader must be able to trace every physical interface to its source.

Place hold points where assumptions enter

Use four hold points to prevent an assumption from becoming an approved condition. At bid issue, hold the technical response if the supplier has not provided the applicable drawing or stated that the item remains open. At order release, hold any door whose backset, case geometry, strike interface or service clearance lacks evidence.

At installation, hold irreversible cutting or fabrication until the site record matches the approved drawing revision. If the door differs from the surveyed opening, document the variation and repeat the affected checks. At closeout, retain the sample record, final photographs, installation settings and signed compliance schedule.

The approval dossier should contain the dated product-page evidence, current dimension drawing, installation guide, cut template, door leaf measurement sheets, frame and strike records, panel and service drawings, sample test sheet and signed exceptions list. Keep the document revisions visible rather than replacing them with an undated attachment.

Do not close an open interface by average, verbal agreement or reference to a similar lock. Closure requires evidence that applies to the ordered SKU and the actual door opening.

Use the related SLK-9962S resources

Use Decoding SLK-9962S: Specifications, Gaps and What to Ask for to review the catalogue fields beyond physical installation and identify where evidence is missing. For the management and access layer, use SLK-9962S Access Options: What the Management Layer Adds so that software scope is kept separate from the mechanical fit envelope.

Use Before You Order SLK-9962S: The Project Checklist to connect these fit notes with the wider project approval sequence. The fit schedule should become one controlled attachment to that checklist, not a separate document that can drift from the order record.

Issue the completed schedule through the request-a-quote process, and use order samples when a representative-door verification is required. Ask for the fit annex to be returned with the technical response, including every unresolved item and the drawing revision that will close it.

The same question is worked through in more detail in smart lock user permission security. That is the same question slk 9962s door fit notes has to answer here.The bid is ready for supplier response when it asks for measurable evidence rather than a general compatibility statement. The order should proceed only when the dated model evidence, controlled drawings and site record establish one traceable fit envelope for each door type.

Kosár
A cookie-k engedélyezésével javítható a felhasználói élmény ezen a weboldalon. Cookie-szabályzat
Chat on WhatsApp