Smart Lock Glossary: FCA Definition for B2B Buyers
An fca definition that stops at the expansion of the three letters leaves a buyer in precisely the position the quotation left them in: agreeing on a phrase nobody in the chain reads the same way. Free Carrier is the name. The content is a boundary line, and the boundary says that the seller delivers the goods to a named carrier at a named place, cleared for export. What that boundary decides is the one thing every later argument depends on: where the seller's obligation ends and the buyer's begins.
Direct answer. To put it plainly: fca definition has to hold for fca definition. the decision record has to hold at the same time. The sections below describe the order fca definition is settled in. A fca definition is a reference entry. It holds definitions, options and trade-offs. fca definition is the entry point for fca definition.
- Set the conditions — use one vocabulary for fca definition across the project
- Set out the choices — list the routes available for six acts one line and what each is for
- Set out what each costs — record what you give up with each route in act one
- For fca definition, the order below is fixed and fca is the reference point.
This entry is written as a process document because a term whose whole meaning is a position in a sequence cannot be explained out of order. Read from the dictionary, FCA is two clauses. Read from the shipping file, it is a run of acts, and the acts have owners. Somebody names the place. Somebody books the carrier. Somebody clears the goods for export. Somebody presents them, and somebody else accepts them, and the acceptance is the moment the term is actually about. After it, everything in the transaction belongs to the buyer, including several things the buyer assumed were included in the price because three letters sat next to a number.
The depth below is deliberately uneven. The early acts carry most of the failure, so they get most of the space. The later acts are where an FCA line stops being a logistics question and becomes a customs, finance or site question, and those are short because the answers belong to a broker, a bank or a project team rather than to a glossary. Where a consequence is legal, fiscal or border-specific, it is routed to a confirmation line and phrased as the question to ask, never as an answer about a market.
Three things are absent on purpose. No freight figure, charge basis, duty rate or quantity floor appears anywhere, because those belong to a carrier, an authority or a commercial negotiation and none of them is ours to publish. No compliance wording either: a delivery term says nothing about the standing of the goods it moves, and this entry makes no claim about our own products. And no named importers, operators or suppliers: the worked sequence below is an illustrative scenario drawn from ordinary buyer experience.
CONFIRM-WITH-CUSTOMS-BROKER: Treat the handover line described in this entry as a contractual allocation to be checked against the booking, the documents and the destination rules for one specific consignment, not as a customs determination.
Six acts, one line: the shape of an FCA delivery
The fastest way to use this term badly is to treat it as a price instruction. It is not. An Incoterm allocates cost, risk and delivery obligations between a seller and a buyer, and it does so by naming a place. Without the named place the term decides nothing, which is why a quotation line reading only "FCA" is not yet an agreement about anything. Where the two versions part company is set out in Smart Lock Glossary: Yield Rate Definition for B2B Buyers. The catalogue entry point for this is the smart door locks.
The sequence below is the one the term assumes. Each act has an owner, and the ownership changes exactly once. That single change is the whole commercial content of FCA; the rows around it exist to show where the change is buried. The second take on fca definition is Smart Lock Glossary: Read Range Definition for B2B Buyers.
flowchart TD
A["Quotation and order line names a place"] --> B["Carrier for the buyer's leg is identified"]
B --> C["Goods cleared for export"]
C --> D["Seller presents goods to that carrier at that place"]
D --> E{"Carrier takes the goods"}
E -->|"No"| F["Seller obligation still open"]
F --> D
E -->|"Yes"| G["Buyer leg begins"]
G --> H["Terminal handling, import file, consignee instructions"]
H --> I["Arrival at the buyer's receiving point"]
| Act | What happens | Who carries it | Evidence it occurred |
|---|---|---|---|
| One: place named | The delivery place is written into the order, not just the quotation | Agreed between both, owned by the buyer's spec | Purchase order line naming the place and the term |
| Two: export cleared | The goods are cleared for export before the handover | Seller, under FCA | Export declaration and clearance record |
| Three: presentation | Goods are delivered into the hands of the named carrier at the named place | Seller, up to this point | Carrier receipt at that place |
| Four: acceptance | The carrier takes the goods and issues transport documents | The handover itself | Booking confirmation, carrier's receipt, bill of lading where applicable |
| Five: buyer's leg | Uplift, main carriage, arrival handling, import formalities | Buyer | Freight documents, entry papers, release instruction |
| Six: receiving | Cargo reaches the buyer's own warehouse or project dock | Buyer | Delivery receipt, discrepancy note if any |
A buyer who reads only the middle of that table reads the wrong thing. The rows that decide whether the term worked are row one and row six: the place named at the start, and the receiving point the term never mentions.
Act one: the named place is agreed before anything is built
The first act happens before the locks leave a production line, and for most programmes it is the only act that is still cheap to fix. FCA is a term built around a place, and the place is not implied by the letters. It is written down, or it is missing.
In practice the gap looks like this. A quotation carries the term and a city. A purchase order repeats the quotation. Nobody records whether the place is the manufacturer's own premises, a forwarder's warehouse in the same city, a freight terminal, or a border point. All four are the same city. All four produce different obligations, because the seller's duty is to deliver the goods to the named carrier at the named place, and a carrier cannot take goods that are standing at a location nobody told it about.
Ask three questions in writing at this act, and put the answers in the order rather than in an email thread.
Which place completes the delivery obligation? Not the city. The address, the facility, and the party operating it.
Which carrier, or which carrier's agent, is the named one? FCA hands the goods to a carrier the buyer has nominated. If that nomination has not happened by the time the goods are packed, they stand finished with nowhere contractually to go, and the delay reads to everyone downstream as a supplier problem rather than as an empty slot in the order.
What is the agreed instruction route for the nomination? The failure here is procedural rather than legal: a forwarder changes, an email goes to a retired address, and packed cartons sit in a corridor while two teams each wait for the other to move.
There is a fourth question specific to hardware programmes. If the order is staged across several sites, one named place may be wrong for part of the cargo. A batch destined for a distributor's rack and a batch destined for an occupied hotel floor are the same product and a different arrival problem, and the term cannot express that difference unless the order can. Some buyers make the delivery plan a schedule attached to the order, with its own place per line. That is a drafting decision rather than a shipping one, and it should be made before the price is agreed rather than discovered at the loading dock.
CONFIRM-WITH-LOCAL-LEGAL: Confirm the effect of a delivery place recorded in an order but not carried into the governing contract text under the law chosen for that transaction.
Act two: export clearance is inside the obligation, whatever
This is the act that separates FCA from the term it is most often confused with, and it is usually the first thing a buyer learns too late.
Under FCA the goods are delivered cleared for export. The export-side formality belongs to the seller. Under EXW, Ex Works, the seller only makes the goods available at its own premises and the buyer takes over almost everything at the factory gate, including export clearance. Buyers frequently assume the seller handles the export paperwork under EXW because someone has to; under EXW that someone is the buyer. FCA moves that single responsibility back across the line, and that is a real difference in what the buyer is buying, not a difference in wording.
Why does it matter on a lock order? Because export clearance is where a shipment becomes a documented one. The declaration describes the goods, and the description used there is the one the whole chain inherits. If the cartons are described loosely at that stage, the buyer discovers the looseness at the far end, in a different language, in front of an officer asking about a shipment that is already unloaded.
Two of the descriptions that matter are set here rather than later.
Classification. The harmonised tariff classification used by customs decides the duty applied to the goods and any import restrictions attached to them, and the complication here is definitional: the same physical lock can classify differently by material, power source and function. A mortise-body device with electronics in it and a surface-mounted keypad unit are not obviously the same article. The determination is made by the customs authority on the facts of the specific product, so a supplier who offers one without evidence behind it has offered an opinion wearing a document.
Origin. Country of origin is the country in which goods were produced under the applicable rules: a substantive determination with evidence behind it rather than a supplier's assertion, and for some buyers it decides the whole bid, because tender forms and marking requirements read origin directly. Whatever the buyer needs origin to say, it has to be settled before the export declaration is filed, not corrected afterwards.
The evidence to demand at this act is a copy of the export-side record for the specific shipment, carrying the goods description the buyer can recognise as the ordered product. Asking what the goods were called on the way out is a verifiable question; asking a supplier to confirm a classification gets a statement to compare against your own import file.
CONFIRM-WITH-CUSTOMS-BROKER: Confirm the classification, the origin basis and the marking consequences for a specific lock shipment before the export declaration is filed; both are per-product determinations and neither is answered by a catalogue.
Act three: the handover, which is the whole term
Everything FCA means lives in this act. The seller delivers the goods to the named carrier at the named place. The moment the carrier has them, the seller's delivery obligation is discharged, and from that point the buyer is the party with an interest in the cargo's safety and a problem with everything that happens to it.
Notice what the definition does not say. It does not say the seller will see the goods loaded, sealed, document-checked or insured for the voyage. It says delivered to a named carrier at a named place. Two readers can stand in the same yard and disagree about whether the duty ended when the cartons were presented at the dock, when they left the ground on a forklift, or when they were placed in the collecting vehicle. That is a drafting question rather than a memory test, and a freight quote does not answer it: state which act completes delivery at that place, and state who performs it.
For a buyer of smart locks, three practical things ride on getting this act written down rather than assumed.
Damage responsibility. Cartons of locks are dense, and dense cartons are damaged by handling rather than by weather. A finish scratched at a loading stage, a housing cracked by a clamp, an escutcheon flexed during a lift, all become attributable only if the chain of custody records who held the goods when. That chain is a documented, unbroken record of who held the goods; it is a process rather than a document, and it starts before the container is closed. If the handover is not recorded as an event with a time, a place and a receiving party, the record has its first hole exactly where the buyer's exposure begins.
Loading and sealing on a shared container. If the cargo goes less than container load, the goods are consolidated with other shippers' cargo and the container is not sealed to you. Whoever presents the goods at the named place is the party the receiving terminal will associate with them, and the handover record is what tells you whether that party was the seller or someone else.
Cost of the tail. Under FCA the main carriage is the buyer's. If the carrier's instruction has to reach further than the named place because the buyer expected delivery to a warehouse, the extra leg is bought after the fact, at whatever price the moment allows.
The evidence to demand at this act is the carrier-side receipt for the specific goods at the specific place, issued on the day. Not a despatch note from the seller, which records what left. A receipt from the party that took them, which records what arrived into custody.
CONFIRM-WITH-LOCAL-LEGAL: Confirm, in the order text and under the governing law of the transaction, which act discharges the delivery obligation at the named place and who bears the cost of that act.
Act four: the buyer's leg, compressed on purpose
This act gets four paragraphs because the term stops working here. Once the carrier has the goods, FCA has told you everything it intends to tell you, and the rest of the journey is governed by documents that have nothing to do with it.
The buyer's obligations after the line are: the contract of carriage or the instruction that creates it; the arrival handling; the import formalities; the onward movement; and the receiving. Every one of these is a separate supplier relationship with its own paperwork, and a shipment that fails after the handover almost always fails because the buyer treated these as one continuous service provided by one continuous company.
Freight mode is a decision the term leaves open, and the difference between a container moved by sea and a consignment moved by air is not only speed: it changes which documents exist, which terminal holds the cargo, and who is standing at the receiving end when they arrive. The published guidance on Smart Lock Sea Freight Shipping and Smart Lock Air Freight Shipping covers those two files in more depth than this entry needs.
What is worth carrying from this act is one sequencing rule: nominate the carrier before production finishes, not after, because the sitting of finished goods is nobody's contractual problem until a shipment date has been missed.
The reading that costs money: free at the factory
It is often read as "free at the factory". It is not. EXW is.
That single sentence is the common confusion attached to this term, and it deserves its own section because the two readings produce different contracts out of identical quotations. Read as free at the factory, FCA sounds like a low-service term: come and collect, we have done our part. Read correctly, it is a mid-service term: the seller clears the goods for export and takes them to a carrier at a stated place, and the buyer's job starts after that.
The cost of getting it wrong arrives in three shapes.
The shape that appears first is a booking gap. A buyer who reads the term as come-and-collect assumes the supplier will hand cartons to any vehicle that turns up. The term actually names a carrier, and if the buyer has not appointed one, no valid handover can occur. The goods are finished. Nobody is contractually obliged to move them.
The shape that appears second is a clearance surprise. A buyer who reads the term as factory collection often expects the seller to handle the export side anyway, because that is what happens under most delivered arrangements. Under this term the seller does handle it, which is the opposite of the EXW assumption and one of the few places the confusion works in the buyer's favour. It works in the buyer's favour only if the buyer checks that it happened, because an export clearance the seller performs silently is one the buyer cannot reconstruct later.
The shape that appears third is a quotation nobody can compare. Two suppliers quote the same three letters against two different places, one at their own gate and one at a terminal with handling built in, and the buying team ranks them on price. The difference between the two figures is where the line was drawn, and it is exactly what a bid levelling exercise exists to expose before the award.
One sentence to put in the file for anyone who inherits this order later: FCA is not a cheaper version of a delivered term, and it is not a slightly nicer version of Ex Works. It is a different division of the same journey, and it names a place rather than a service level.
Four letters, four different contracts
Read side by side, the trade terms on a lock quotation separate into positions along the journey rather than into tiers of generosity. The table below is the comparison a buyer actually needs at award stage, and it is deliberately built around where each seller stops.
| Term | What the seller does | Where the seller stops | The confusion it causes |
|---|---|---|---|
| EXW, Ex Works | Makes the goods available at its premises | The factory gate; the buyer takes over almost everything, including export clearance | Buyers assume the seller handles export clearance; under EXW the buyer does |
| FCA, Free Carrier | Delivers to a named carrier at the named place, cleared for export | At the handover to that carrier at that place | Read as "free at the factory", which is EXW |
| FOB, Free on Board | Delivers on board the vessel at the port of loading | The loading port | Treated as though it said something about the destination, customs or inland delivery |
| CIF | Pays cost, insurance and freight to the destination port | Risk still passes at origin, not at destination | Buyers assume the risk travels with the freight paid; it does not |
| Delivered at Place | Delivers to a named destination, ready for unloading | The named destination | Read as a mode rather than as a place |
Two observations matter at award stage.
FOB and FCA are used interchangeably in freight emails and are not interchangeable on an order. FOB is a sea-freight term with risk transferring on board at the port of loading; FCA transfers at a named place that may be nowhere near a berth. An order naming FCA but quoted as though the goods had to be alongside a vessel contains a gap, and somebody pays for the leg inside it.
The risk line and the cost line are not the same line, on any of these terms. CIF is the classic case: the seller pays freight and insurance to the destination while the risk of the goods passing during the main carriage sits with the buyer from origin. A buyer who learned the wrong lesson from CIF will learn it again from FCA somewhere else on the map. The habit that protects you across all five rows is to ask two separate questions of any term: how far does the seller pay, and how far does the seller carry the goods' fate. They rarely match.
When the named place is a terminal and not a factory gate
FCA does not care what kind of place the named place is. That neutrality is the reason a terminal handover needs its own treatment in the file.
A Container Freight Station is the terminal where a container is received, stripped and released. It is not the port, it is not the buyer's warehouse, and goods sitting there are not in the buyer's possession. Under an order whose named place is a CFS, the seller's obligation can be discharged into a building the buyer cannot enter without an appointment, on cargo then consolidated with other shippers' goods.
The consequences are documentary. The buyer needs a receipt trail that survives the move from one party's custody to another's, and the records most often confused in that trail are:
| Record | What it actually is | What it proves | What it does not prove |
|---|---|---|---|
| Advance shipping notice | Electronic notice sent before arrival with contents and documents | That the terminal can receive and release the cargo | Title; it is not the bill of lading |
| Bill of lading | The carrier's document for goods shipped on a vessel | Title, and often the ability to sell cargo in transit | That you have received the goods you ordered |
| Carrier's receipt at the named place | Handover record at that place on that day | That the seller's delivery act occurred | That the goods were undamaged or complete |
| Delivery receipt | Receiving-party signature at destination | That cargo reached the receiving point | Anything about the earlier custody if the chain has holes |
A single line in the order saves a week of reconstruction later: the handover must produce a dated receipt naming the place, the carrier and the cargo, and a copy of it must reach the buyer rather than only the forwarder's file.
Capacity language is a separate trap at the same location. A terminal may quote in twenty-foot equivalent units, which measures container capacity and nothing else; it is a volume measure and not a weight measure, and a dense lock consignment can reach a mass reality long before it fills a volume allocation.
CONFIRM-WITH-CUSTOMS-BROKER: Confirm which party holds cargo at each named location on the route, and what that location's status does to import formalities for this consignment.
What the documents prove, and what they only appear to prove
The glossary frame asks for the evidence to demand, and on this term the answer is a short list with strict definitions attached, because each of these documents is habitually credited with a proof it does not carry.
A proforma invoice is a non-binding indicative document issued before the order. It is not a tax invoice and it creates no obligation to pay, which means an FCA line sitting on a proforma has no life until it is carried into the order. Several shipping disputes are really disputes about a phrase that only ever existed on a quotation.
A bill of lading is the carrier's document for goods shipped on a vessel; it governs title and often the ability to sell the cargo in transit, and it is not proof of delivery of the goods ordered. A clean bill of lading says the goods were shipped in a stated apparent order and condition, and buyers who read apparent as inspected are holding a different document than the one they believe they hold.
An advance shipping notice is not the bill of lading and does not transfer title. It exists so the terminal can receive and release the cargo, which makes it an operational document people keep mistaking for a proprietary one.
A payment mechanism inherits the same confusion. Where payment runs against conforming documents, a bank checks the documents and not the goods, so a clean-looking invoice is not the test of whether the shipment was right. The set a credit requires has to be a set the seller can produce at the handover point; an instruction asking for on-board documents where the delivery act happens at an inland terminal cannot be performed by anyone, and that is a term-and-payment mismatch rather than a supplier failure.
A declaration of conformity is a manufacturer's own legal statement that a product meets applicable requirements; it is not a third-party certificate and not a test report, and a report from a third-party laboratory is issued on a sample in a configuration and does not extend to variants. That belongs on this list because freight papers and compliance papers travel in the same envelope and are read by the same receiving clerk, who cannot tell which of them the buyer relied on.
Track and trace is the serial-level record of where a unit is in the chain, and it is only as good as the discipline of entering each event. On a lock order that record is unusually easy to demand, because the units already carry identifiers for the access-control system's benefit: serial capture at the handover turns a later claim into an identifiable subset.
The smart-lock specifics that sit on the FCA line
A delivery term is product-neutral, which is precisely why hardware surprises arrive on top of it rather than inside it.
Packing is a shared responsibility in practice. The seller packs, but the packing has to survive a journey the buyer is now paying for and a handling chain the buyer has chosen. Export packaging that suits a full container may not suit a consolidated load that is stripped at a freight station by somebody with no idea what the cartons contain. The published article on Smart Lock Export Packaging goes further into that mismatch than this entry does.
Loading is inspectable and should be inspected. Whatever the term says about risk, the buyer's only cheap look at the cargo is before the container closes. What was loaded, how it was restrained, whether the cartons match the packing list, and whether the serial ranges correspond to the ordered configuration are all visible then and invisible afterwards. See Smart Lock Container Loading Inspection.
Mixed cartons create classification questions. A shipment pairing a deadlatch body, a strike plate, a spindle and a reader is a shipment whose goods description has to hold, because the description written at the export stage propagates into the import file with it. A vague one becomes a question asked at the far end, in a language the buyer does not read.
Configuration changes break the handover quietly. A Product Change Notification is the notice a supplier gives that a product or its specification has changed, and it decides whether a delivered product is still the product that was approved. A change that improves the product is still a change to an approved configuration. On this term the change can arrive between handover and arrival, so the buyer learns about it from the door rather than from the document.
Credentials are the one thing a deferral cannot help. Electronic locks are not the whole order; cards, fobs and templates are. A bonded warehouse is a customs-controlled place where duty is deferred until the goods leave, and goods sitting in one are not free of the obligation, only postponed. Credential issuance that depends on material still under customs control is a programme schedule waiting on a deferral it never negotiated; where provisioning depends on arrival timing, the planning assumption is the buyer's to name, and no delivery term shortens it.
Where the term stops being logistics: consignee, duties
The consignee is the party named to receive the goods. That single name decides who the carrier will deliver to and who pays duties, and the consignee is not always the buyer: a forwarder may be named, and that changes the paperwork.
Put the two facts together and an FCA programme acquires a shape most buying teams never expect. The seller's obligation ends at a named place; everything after it runs against documents the buyer controls, and the most consequential field on those documents is a name. If the consignee on the arrival paperwork is a forwarder rather than the importing entity, then the entity that needs to stand as importer of record is not the party the carrier is looking for. If the receiving entity differs from the buying entity across a staged programme, that field has to be right on every consignment rather than once.
Demurrage is where the abstraction becomes a line item. It is a charge for a container staying beyond the free time at the terminal, it lands on whoever named the consignee, and it is triggered when clearance slips. Clearance slips most often on documents rather than on cargo: a description that does not match, a value question, an origin record nobody can produce, a permit that applies to this product configuration and not that one. The buyer who has drawn the line at the named place has also taken the exposure to the terminal clock, and the only defence available is an import file assembled before arrival rather than during it. The same logic in more detail is in Smart Lock Import From China, and the wider importer view in Smart Lock Importer Guide.
Duty, tax rate and the treatment of any consumption tax on the import are not answerable in a glossary. VAT in most markets is a consumption tax charged and collected at the point of sale, and whether a VAT number held by the buying entity makes an import exempt is a local answer, as is the point at which an import becomes taxable for a distributor who has not yet sold anything.
CONFIRM-WITH-LOCAL-TAX: Confirm whether the buying entity's registration status changes the treatment of the import, whether the tax is recoverable, and which entity must appear on the entry documents for that to hold.
A worked sequence, from purchase order to release
An illustrative scenario, one consignment, no figures. Its only purpose is to show the acts running in order and to show where a real programme would have stopped.
Order stage. A buyer of access hardware for a multi-building project accepts a quotation carrying the term against a city. The order text records the city and not the facility. Nothing else changes at this point, and it is the first of two moments the programme later spends time recovering.
Production stage. Units are built to an approved first-article configuration. The first article is the sample approved as the production reference, and the approval binds only the configuration that was approved, with its stated tolerances. Asking that approval to cover more than the configuration is asking a document to do a job it was never written for. The sequence continues in Smart Lock Mass Production After Sample Approval and, upstream, Smart Lock Sample Approval Process for OEM Buyers.
Nomination stage. The buyer's forwarder is appointed and the named carrier is communicated. It reaches the supplier's sales mailbox and is forwarded, eventually, to someone who has left. The cartons finish and wait. Nobody's obligation has been breached, which is the uncomfortable part: an order whose nomination never landed has no owner for the delay.
Export and handover. The seller clears the goods for export; a copy of that record, with its goods description, is requested only after arrival, when the broker asks for the entry file. It exists, and it says something broader than what was ordered, so the description now has to be reconciled rather than read. The goods are then presented at a freight station and taken by the carrier's agent. A receipt exists in the forwarder's system, and the buyer sees it weeks later. The chain of custody holds a record of the goods leaving the factory and a record of them reaching the destination terminal, and the act in between, which is the act the term is about, carries the thinnest evidence.
Arrival and receiving. Clearance slips on a description question. The container sits, and the charge attached to that sitting lands on the party named as consignee, which in this file is the forwarder, which will re-invoice it to whoever it has contracted with. Cargo reaches two of three project docks. The third is occupied and has no storage, so the buyer's own staging decision becomes the last unpriced element of a term chosen partly because it looked bounded.
Nothing in that sequence is exotic, and almost all of it was preventable at act one, which is the cheapest stage in the programme and the one every buyer rushes.
Questions to have in the RFQ before the term is agreed
An fca definition settled at this stage is cheaper than the same question raised at the booking. The term is not a shipping detail appended at the end of a commercial negotiation; it is a set of questions, and asking them in the RFQ rather than after award is the only point at which they are free. The structure of such an enquiry is covered in Smart Lock RFQ Guide for International Buyers.
| Question to put in writing | Who answers it | Why it must be written down |
|---|---|---|
| Which facility, at which address, discharges the delivery obligation | Both parties | The letters alone decide nothing; the place is the term |
| Which carrier or agent is named, and how is the nomination given | Buyer | An unmade nomination stalls the handover with no owner |
| What exactly is cleared for export, and what copy of that record reaches the buyer | Seller | The export description propagates into the import file |
| Which act completes the presentation: delivery to the vehicle, to the terminal, or into the carrier's custody | Both, then the contract text | This is where the two readings of the term diverge |
| What documents are issued at the handover, to whom, and within what window | Seller and forwarder | The receipt is the only proof the boundary was crossed |
| Who is named consignee on each consignment in a staged delivery | Buyer | It decides who the carrier delivers to and who pays duties |
| Which goods description and classification are used, and against which configuration | Buyer's broker, not the supplier | Classification is a per-product determination, not a catalogue field |
| What product paperwork accompanies the shipment for the tender file | Seller | Freight and compliance documents are filed by different people |
A supplier who answers all eight in writing has told you something about the rest of the relationship as well. The same discipline is worth applying when you verify a smart-lock manufacturer before placing an order, because a term this specific is only ever honoured accurately by a team that has done it before and can show the file.
The confirmation lines this entry cannot skip
Three boundaries in this term are not answerable in a glossary, and a buyer is better off holding them as open questions than accepting a confident sentence.
CONFIRM-WITH-LOCAL-LEGAL: The discharge point of the delivery obligation at the named place, the loading act and its cost, and the effect of any clause that restates the term with additions, all turn on the contract text and the governing law chosen for it.
CONFIRM-WITH-CUSTOMS-BROKER: The classification applied to a specific lock configuration, the origin basis and its evidence, the marking consequences, and whether any permit or pre-arrival formality attaches to this product rather than to that one.
CONFIRM-WITH-LOCAL-TAX: Whether the import is a taxable event for the entity named on the entry, whether any consumption tax charged at import is recoverable, and how a bonded or deferred arrangement changes the timing of that answer.
None of these lines weaken the definition. They locate it. The term decides a boundary between two parties; it does not decide anything about the relationship between either party and an authority, and the programmes that go wrong are the ones where somebody assumed a shipping term carried a regulatory consequence with it.
The glossary card, in the shelf's five fields
What it is. Free Carrier: the seller delivers the goods to a named carrier at a named place, cleared for export.
What it actually decides. Where the seller's obligation ends and the buyer's begins, which in practice sets who books the main carriage, who owns the arrival paperwork, who carries the terminal clock and who pays for everything past the line.
The common confusion. It is often read as free at the factory. It is not; EXW is. Read wrongly, the term produces a missing carrier nomination, an assumed export-handling role, and two quotations that look comparable and are not.
The evidence to demand. An order line naming the place and not only the city; a nomination instruction with an acknowledgement; the export-side record with its goods description; a dated handover receipt naming place, carrier and cargo; the consignee identity for each consignment; the product documents the destination file needs, checked against the configuration that ships rather than the one that was approved.
Where it bites. At three points, in this order: in the order text if the place is missing, at the terminal if the receipt is thin, and on the entry document if the consignee is wrong. Everything else about the term is documentation; these are the points where it becomes money, delay or a container nobody can move.
If your own file needs the term drawn against a specific order, the commercial place to start is a request a quote, so that the delivery line, the place and the document set are agreed before the order rather than reconstructed after it; the freight side of the question lives at logistics shipping rather than in this entry. Pull the receiving-side document list from What Documents Should You Request From a Smart Lock Supplier? and keep it beside this card, because the two files answer one question at opposite ends of the boundary: what the product paperwork has to say, and what the freight paperwork has to prove. For the evidence layer this term never touches, see What Test Reports Should I Request From a Smart Lock Factory?, and to test whether the party answering the eight questions above has answered them before, work through the Smart Lock Supplier Due Diligence Checklist.

