Door hardware schedule coordination: A bid and specification sheet for coordinating door hardware schedules across design, procurement.

게시일: 3월 10, 2026

Door Hardware Schedule: Coordination Between Architect and Supplier

Door Hardware Schedule: Coordination Between Architect and Supplier

Document type: Bid and specification sheet

Door hardware schedule coordination begins when the schedule stops acting as a product list and starts identifying complete door sets. This sheet converts each architectural line into a bounded question for the supplier, a response for the consultant to review, and a dated decision that the installer can use. The objective is to make architectural coordination visible in the project record before fabrication or purchase.

Direct answer. In short, door hardware schedule coordination is the subject of this piece. door hardware schedule coordination is where the work on door hardware schedule coordination sits. door-hardware-schedule is what has to be evidenced before anyone signs. A door hardware schedule coordination is a resource for whoever writes the requirement. door hardware schedule coordination turns a request for door hardware schedule coordination into something a supplier can price.

door hardware schedule coordination is used here in the narrow sense set out in door hardware schedule coordination. It is a working definition built for door hardware schedule coordination. It is not a statutory one, and it has to be read against the market and product concerned.

  • Write the requirement — use a template that names the physical constraints in door hardware schedule coordination
  • List the evidence — attach the conformity file for the SKU behind door-hardware-schedule
  • Send it once — issue one complete package per door class, not one per query
  • door hardware schedule coordination runs this sequence, and door hardware schedule is the record it produces.

It is intended for the door hardware consultant working between the architectural team, the supplier and the installer. Each question is designed to be answered by evidence rather than an assumption. For existing openings, the site information should be combined with an Office Smart Lock Site Survey or Smart Lock Retrofit Site Survey, as applicable.

flowchart TD
    A[Schedule basis and boundaries] --> B[Door set and dimensional review]
    B --> C[Submittal and operating evidence]
    C --> D{Recorded review decision}
    D -->|Clarification required| E[Traceable supplier response]
    E --> C
    D -->|Accepted| F[Installation evidence]
    F --> G[As built handover and ownership]

Bid basis: scope, status, and response boundaries

State the project and drawing revision against which the supplier is responding. A schedule response is not a current document merely because it was issued in the same year. Every response should identify the schedule line, door designation, door type, quantity, drawing revision and product or option being reviewed. This prevents a revised lever set from being mistaken for the intended electronic lock. The hardware behind this is in the smart door locks.

The bid basis should also distinguish three kinds of information. The first is an architectural requirement, such as swing direction, opening construction or the required locking arrangement. The second is a supplier statement, such as the dimensions and operating behavior of the offered option. The third is an unresolved design decision that still requires an architect, consultant, authority or client response.

Include the following boundaries in the request:

  • The schedule defines the intended door set and the information needed to evaluate it.
  • The supplier answers product-specific questions and identifies any exceptions.
  • The architect or consultant records design decisions; the supplier does not resolve them through a catalogue assumption.
  • The installer confirms site conditions that the survey or drawing could not establish.
  • The client or nominated authority confirms matters affecting egress, fire performance, accessibility and other consequential requirements.

A response that leaves any of these boundaries undefined is incomplete. The requester should return it with the affected schedule lines and the missing evidence identified.

Door set specification: the unit of coordination

Treat each schedule entry as a door set rather than an isolated lock. The door set includes the leaf, frame, hardware, locks, closing interfaces and the egress route or locking arrangement associated with that opening. The door set specification should therefore connect product selection to the actual door construction.

For each opening, identify the architectural conditions that affect fit and operation. These normally include door swing, leaf construction, frame type, wall build-up, handing, the surrounding wall condition and the intended clearance for the hardware. Mark any condition that remains provisional. A provisional mark should identify who will confirm it and what record will close it.

The supplier should answer against those conditions rather than restating a nominal configuration. If an offered product has options that change dimensions, interfaces, power arrangements or credentials, each option needs its own evidence. Do not allow a single brochure to stand in for every option shown on the same product page.

For a door set with different requirements on each face, include both faces in the same coordination record. This is particularly important where the pull side, push side, frame profile, adjacent wall or door swing affects the installation. The supplier should state which side the submitted dimensions and details describe.

Responsibility split across design, supply, and installation

The review succeeds when each party owns the evidence it can produce. Architectural coordination does not mean that the architect must verify every product dimension, nor does it mean that the supplier can decide the building's functional requirement.

ActivityArchitect or consultantSupplierInstallerAcceptance record
Define the door's function and locking arrangementState the intended use and design decisionIdentify whether the offered option fits that useFlag site conditions inconsistent with the designApproved schedule line and recorded design decision
Establish door and frame conditionsProvide drawings, door type and known site informationAsk for missing architectural dataVerify actual field conditionsCurrent survey or marked-up record
State dimensional informationDefine required dimensions and datumsSupply dimensions, tolerances and installation detailsConfirm that the opening matches the reviewed basisDimensioned submittal and fit check
State operating behaviorDefine the required state and interfaceDescribe the proposed behavior and its conditionsTest against the approved sequenceFunctional acceptance record
Coordinate special functionsIdentify the required authority decisionSupply relevant evidence for reviewInstall only the approved arrangementAuthority response and dated approval
Coordinate finishDefine the finish reference and interfaceProvide a current physical sample and product informationProtect and match the approved finishSample approval and delivery record
Complete handoverConfirm required close-out documentsSupply certificates, settings and product recordsRecord installed configurationAs-built register with document owner

Where a product-specific statement affects selection, retain the supplier's response and date.

CONFIRM-PER-SUPPLIER

Schedule line fields that prevent a phone call

A hardware submittal is easier to evaluate when each schedule line uses the same data fields. The fields below form the minimum response requested from the supplier. Missing fields should be marked “not provided” with an explanation, rather than omitted.

FieldQuestion the field answersEvidence expectedReason to hold the response
Schedule identityWhich opening and drawing revision are being answered?Line code, door designation and revisionResponses cannot be matched to the design
Offered optionWhich exact configuration is proposed?Product designation, option code and dated documentA family-level description is not reviewable
ApplicationIs the option intended for the stated door type and swing?Annotated schedule entryFit and handling remain uncertain
DimensionsWhat lock, frame and door data must be checked?Dimensioned drawing with units, datums and tolerancesThe installer cannot test fit
BacksetWhere is the spindle or cylinder centre relative to the door edge?Stated dimension and measurement methodThe lock case may not align with the intended edge reference
Bore and bolt relationshipHow do the bore and bolt positions relate?Bore diameter and bolt-to-bore distanceOne value cannot substitute for the other
Faceplate and strikeHow will the closing interface be matched?Faceplate and strike detailsThe door set may not close or latch correctly
Power arrangementHow is normal and backup power provided?Schematic, wiring plan and state descriptionOperation during supply changes is undefined
InterfacesWhich external systems or exit devices connect?Interface schedule and point listIntegration sequence is unresolved
Credential controlHow are access rights issued and removed?Administrative description and audit featuresOperational ownership is unclear
FinishHow is the approved appearance identified?Colour reference and current sampleA photograph does not specify the finish
Installation dataWhat conditions govern installation?Instructions, fixing details and site limitationsField decisions may change the product
ExceptionsWhat remains unresolved?Marked exception listAn apparent approval may hide unresolved scope

These fields also give the installer a usable instruction. The schedule should not ask the installer to infer the required dimensions from a marketing image or select a compatible option without a written cross-reference. For door hardware schedule coordination, the position on this ladder is what the purchase decision turns on.

Lock and frame fit: dimensional questions

Lock and frame fit is decided by several independent dimensions. Backset is the distance from the door edge to the centre of the spindle or cylinder. Bore diameter and bolt-to-bore distance are separate dimensions. A response that provides one of them does not answer the others.

The dimensional request should state the edge datum, measurement direction, unit and any tolerance required by the project. It should also distinguish the nominal door condition from field verification. Where the door is already installed, ask the installer to confirm the actual condition and record the method used.

The supplier's dimensional drawing should show the relationship between the lock case and the door edge rather than presenting isolated catalogue dimensions. It should identify whether the stated backset is measured to the spindle centre, cylinder centre or another feature for that lock type. It should also show the relevant bore positions, faceplate geometry and fixing locations.

Coordinate these dimensions with the frame and closing interface. Door thickness, frame profile, reveal, door stop position and the route of any services can affect the installation even when the lock case itself fits. If the supplier cannot confirm one of those relationships, that item becomes a clarification rather than an assumed field adjustment.

The dimensional dimension the installer needs is stated in the format used on the approved door survey: the feature, unit, datum, tolerance and verification condition. No supplier dimension should be presented as an actual site dimension unless the installer or surveyor has confirmed it.

Mortise, rim, multipoint, faceplate, and strike

State the lock construction required by the design before asking for product alternatives. A mortise lock uses a case installed within the door. A rim lock has a surface-mounted case. A multipoint arrangement operates several locking points through one gear. These descriptions affect the door preparation, faceplate, frame interface and maintenance assumptions.

The schedule should not use these terms as interchangeable product categories. If the design permits more than one construction, define the decision criteria: permitted door thickness, existing preparation, required locking points, handing, frame compatibility, space behind the door and the operating sequence. The supplier should then show how its offered construction meets those criteria.

Faceplate and strike are the matching halves of the closing interface. Ask for their dimensions, profile and fixing arrangement as one set. A compatible-looking faceplate does not establish that the supplied strike belongs to the same configuration.

For multipoint doors, include a point schedule and the relationship between the primary operation and the secondary locking points. Confirm whether adjustment is required at installation and whether that adjustment is documented. This turns an uncertain field operation into an identified task with a responsible party.

Electronic operating context: power, state, and supervision

An electronic lock cannot be evaluated as an isolated device. Its operating context includes the door role, power source, power-loss behavior, backup arrangement, controller connection and the required door state. Each of these needs a written answer.

Ask the supplier to distinguish loss of mains power from depletion of the lock's own battery. These are different conditions and may call for different instructions. The response should identify the state intended under each condition, including which parts of the system remain available. For any SKU-specific statement, confirm on the dated product page for the specific SKU and retain that dated evidence with the review.

Fail-safe and fail-secure describe the intended state on power loss. The state is selected from the door's role and approved design, not from a generic product preference. The supplier's role is to describe the behavior of the offered option accurately and identify any conditions or accessories that affect it.

Battery backup describes the arrangement intended to keep the door operable when the normal supply fails. The record should identify what the arrangement protects, where its energy source is located, who inspects it and how a fault would be noticed. It should not leave “battery backup” as an unsupported feature label.

Line supervision describes how a controller learns that a door is open or closed. An egress interface describes how the system is told that an exit device has been operated. Request the point list, event definitions and behavior during loss of communication. Then assign the responsibility for testing those events after installation.

Egress, panic, and access-controlled doors

Where an opening belongs to an escape route, the schedule must identify the relationship between the locking arrangement, the door swing and any exit device. Panic hardware is the device that releases the door on the escape route. Free egress describes operation of the escape route without special knowledge or effort beyond what the applicable requirement allows.

The supplier should not decide this combination through a generic statement that the product is suitable. Ask which interfaces are involved, which events are reported, how the door behaves in each approved state and which evidence supports the proposed arrangement. A mock-up may demonstrate the physical arrangement, but it does not replace the authority's decision.

Where a door is identified as fire-related, request the assembly information and the authority's approved arrangement. Do not infer the treatment of an electronic component from the lock's use elsewhere in the project. The schedule records the decision; it does not create it.

CONFIRM-WITH-LOCAL-BUILDING-CONTROL

CONFIRM-WITH-FIRE-AUTHORITY

Where accessibility also affects the operable part, approach, force or motion, coordinate that review with the access decision rather than treating it as a finish item.

CONFIRM-WITH-ACCESS-CONSULTANT

Credential control and deliberate exclusions

The schedule should identify who may use each opening and which administrative system owns that decision. “Electronic access” is not a sufficient description because it leaves open whether credentials are issued per person, per group, through a visitor process or under a local key-control hierarchy.

Credential-standard selection is a project decision. Where different spaces carry different risks or user populations, document the basis for treating them separately. For each space, request the credential type, administrative owner, issuing method, revocation method and audit requirement.

Key control remains relevant even when an electronic lock is introduced. Master key and hierarchical key decisions determine which openings remain under physical control and which deliberately sit outside that system. Show those doors explicitly in the schedule rather than allowing them to disappear when a product option changes.

The supplier response should not imply that the offered lock replaces the client's policy or operating procedure.

Finish, frame interface, and physical sample

The finish is the surface treatment and its identified colour reference. RAL or another agreed colour reference is the identifier. A photograph shows the finish; it does not specify it. The schedule should state the finish family, the exact reference, the component or face to which it applies and the visible interfaces with the frame or adjacent hardware.

Coordinate the lock finish with the frame, door pull, hinges and any existing hardware. If the design permits a limited selection, record the selection method and the date of approval. Do not use “satin stainless” or “dark bronze” alone when the project needs a repeatable match.

A physical mock-up or sample proves fit and appearance at the reviewed conditions. It does not prove operating performance, installation on every field opening or the outcome of later site changes. Record the door or representative construction used for the sample, the options fitted, the people present and the limitations of the review.

A sample approval should identify what was checked. “Finish accepted” and “fit accepted” are different decisions. If the sample does not represent the actual door construction, state that limitation and keep dimensional verification open.

Supplier clarification sheet: one question, one traceable answer

Use a supplier clarification sheet for every issue that cannot be answered from the current schedule and supporting documents. Each entry should affect a defined schedule line and request a defined form of evidence.

FieldEntry rule
Clarification IDUse a unique reference that can be cited in drawings, emails and the review record
Schedule lineState the door designation, lock type and drawing revision
QuestionPhrase one issue that can be answered without a meeting
Reason unresolvedIdentify the missing drawing, dimension, decision or document
Evidence requestedName the drawing, table, test record, sample or authority response required
Supplier responseEnter the factual answer and identify the supporting document
DependenciesState any design decision needed before the answer can be used
DispositionRecord accepted, accepted with conditions, revised or returned
Reviewer and dateName the person who made the recorded disposition

CONFIRM-PER-SUPPLIER

A useful supplier clarification asks “Does the offered option use the same spindle-centre datum as the dimension shown on the door survey, and what tolerance applies?” It does not ask whether the lock “fits the door,” because that phrase leaves the datum, condition and evidence undefined.

Submittal package and review sequence

Request the hardware submittal in a fixed order so the reviewer can stop when information is missing. Begin with a cover sheet identifying every included schedule line and revision. Follow it with the option schedule, dimensioned drawings, installation instructions, power and interface documents, finish information and the list of exceptions.

The dimensioned drawing must contain enough information to perform lock and frame fit without opening a catalogue. The operational document must distinguish the proposed behavior from the behavior required by the door role. Any authority response should be identified by document, scope, issuer and date without repeating an unsupported certification claim.

Review in the same sequence. First check identity and schedule alignment. Second check door-set dimensions. Third check the intended operating state and interfaces. Fourth check special-function evidence. Fifth check the finish and any physical sample. Sixth record exceptions and disposition. This order prevents a visually persuasive sample from obscuring unresolved dimensional or operational questions.

The Door Hardware Schedule: A Smart Lock Specifier Guide can support the field-level review, while Door Hardware Schedule: Documents a Specifier Should Demand provides a broader evidence request.

The submittal is not approved until the review is recorded and dated. A supplier's unqualified issue of documents is not acceptance, and an email saying “looks fine” does not define the conditions attached to the approval.

Substitution and design-change control

An or-equal request begins with a proposed substitute, not a general complaint that the specified product is unavailable. Compare the proposed item against the approved schedule line using the same dimensions, door construction, locking function, operating state, interfaces, credential method, finish, installation requirements and documentary evidence.

The decision belongs to the specifier and must be recorded with reasons. Record which criteria were equal, which were improved and which remain conditional. If the change affects the door role, egress arrangement, fire-related assembly or accessibility, route the change through the relevant authority before approval.

A visual match or a shared product family is not enough. The substitute may use a different case, interface, power arrangement or installation basis even when its finish appears identical. If the supplier cannot provide a side-by-side comparison, return the request and identify the missing criteria.

Keep the approved product, the proposed substitute and the recorded decision on the same schedule line. When drawings or the door schedule change again, reopen the affected clearances rather than carrying a former approval forward by assumption.

Installation evidence and handover ownership

Before fabrication, compare the approved dimensional basis with the actual opening or verified survey. Record who checked the condition, what method was used and which discrepancies remain. This is the point where the schedule becomes an installation instruction rather than an aspiration.

At handover, provide an as-built register containing the installed product and option for every schedule line. Include actual dimensions where verification was required, the finish reference, power and interface settings, credential allocation references, configuration records, operating instructions and the location of supplier documentation. Identify test or commissioning records by door and date.

The handover also needs an owner. The client should know which party maintains the operational configuration, which party updates the credential register, who receives fault reports and where the original review records are held. A document repository is useful only when responsibility for its accuracy is named.

Where the installed condition departs from the reviewed basis, retain the deviation and its acceptance. Do not rewrite the approved submittal to make it appear that the installation matched it. The as-built record should show what was installed, while the submittal shows what was reviewed.

Decision-comparison sheet for supplier responses

Use this comparison sheet when two responses appear possible. It keeps the decision on evidence that can be tested and prevents a preference for one presentation style from becoming an undocumented technical choice.

Decision pointOption AOption BEvidence required before selectionRecorded outcome
Lock constructionMortise, rim or multipot option stated by openingAlternative stated for the same openingDoor preparation and closing-interface drawingsSelected construction and reason
Dimensional basisSupplier dimensions use the stated project datumsSupplier dimensions use catalogue datums onlyMarked comparison with the door surveyAccepted basis or further clarification
Power-loss behaviorState is defined for each identified power conditionState depends on an unset project conditionState table, operating sequence and configuration recordRequired state and responsible approval
Locking pointsPoint count and adjustment method are identifiedPoint arrangement remains product-specificPoint schedule and frame/bolt drawingsApproved arrangement
Credential controlAdministrative method is identifiedOnly the credential technology is namedOwnership, issue, revocation and audit descriptionSelected control method
FinishExact reference and current sample are suppliedAppearance is shown only by imagePhysical sample and colour referenceApproved finish and component list
Interface behaviorEvents and loss-of-communication behavior are statedInterface is shown only as a connectionPoint list and functional sequenceAccepted interface behavior
ExceptionsEach exception has a dispositionExceptions are buried in general textMarked exception registerConditions carried into release

If neither option has complete evidence, record “deferred” rather than forcing a selection. The outstanding item must name the decision maker and the document that will close it.

Pre-issue acceptance check

Before releasing the schedule or accepting a response, check the record from the general to the specific. The broad fields confirm that the right door, revision and option have been reviewed. The detailed fields confirm that the supplier's answer can be installed and maintained.

Readers comparing approaches usually start with smart locks for long term rentals. That is the same question door hardware schedule coordination has to answer here.

Schedule completeness

  • Every line identifies the leaf, frame, hardware, lock and intended locking arrangement.
  • Handing, swing and door construction are stated or linked to current drawings.
  • Provisional information has an owner and a closing record.
  • Related doors, such as paired leaves or shared frames, are linked.

Fit and interface

  • Backset, bore diameter and bolt-to-bore distance are independently stated.
  • Faceplate and strike details are matched.
  • The datum, unit, tolerance and verification condition are clear.
  • Mortise, rim or multipoint construction is consistent across all documents.

Operation and governance

  • Power-loss and battery-depletion conditions are separated.
  • Fail-safe or fail-secure intent follows the approved door role.
  • Supervision, egress-interface and credential arrangements are defined.
  • Authority decisions are attached to the affected schedule lines.

Evidence and close-out

  • The dated product document supports any SKU-specific procurement decision.
  • The physical sample records fit and finish limits.
  • The submittal review has a named reviewer, disposition and date.
  • The handover register has a document owner and configuration owner.

Coordination close-out record

The final record should let a future reader answer three questions without locating the original supplier or reopening the meeting history: which door set was approved, which evidence supported that decision, and who owns the resulting configuration.

Use the Door Hardware Schedule: Reviewer Checklist for the final pass, then attach the completed clarification sheet, dimensional comparison, reviewed submittal and authority responses to the affected drawing revisions.

Door hardware schedule coordination is complete when every unresolved question has either a dated disposition or a named owner for its closure. Send the supplier a return list showing the affected schedule lines, the accepted information and any conditions that must be carried into purchase, fabrication, installation and handover. That return list becomes the controlled bridge between the design record and the installed door set.