Planning Preventive vs Corrective Split Across a Portfolio Refresh
Use this tearoff after a portfolio refresh is funded but before its field schedule is released. It turns a mixed list of inspections, planned replacements, troubleshooting, and repair work into two controlled lanes. Preventive versus corrective split portfolio planning means deciding which action is intended to reduce a defined future risk, which action answers an observed fault, and where ownership changes. Fill one line per door population and one line per proposed action; do not use room labels as a substitute for the object schedule.
Direct answer. Pair this portfolio-level decision with the Preventive vs Corrective Split Worksheet You Can Fill in on Site.
Freeze the portfolio boundary before work is classified
The refresh boundary needs a stable population before a task can be called preventive. If that denominator changes later, portfolio refresh planning comparisons become unreliable. The baseline reading is Smart Lock Access Point Planning.
- Use the door or unit identifier from the object schedule, not a room number alone.
- Record the model and variant from the label or catalogue row; confirm on the dated product page for the specific SKU before planning SKU-dependent work.
- State the approved refresh reason for each cohort: condition, configuration, component change, operational requirement, or another documented reason.
- Assign each cohort an operational priority and a named planning owner.
- Freeze the population revision date so later additions appear as a recorded change rather than silently changing the plan.
Turn proposed tasks into a maintenance work classification
Classify an action by its trigger and purpose. An action planned before a fault is preventive only when it is tied to a defined risk or approved refresh criterion. Work initiated by an observed fault is corrective.
| Proposed activity | Classification lane | Required basis |
|---|---|---|
| Scheduled condition inspection before a fault is reported | Preventive | Approved refresh criterion and task record |
| Planned component change during the refresh | Preventive | Approved change criterion and documented scope |
| Troubleshooting after a fault report | Corrective | Reported symptom and ordered diagnostic checks |
| Repair or unit replacement after a fault | Corrective | Repair evidence, fitted part or swapped unit, and return-to-service record |
| Control introduced after a cluster of faults | Preventive only after validation | Evidence linking the control to the cause, plus an owner and review point |
Anything that does not have a documented trigger remains unclassified. Do not place it on a technician’s schedule merely to keep the queue moving.
Build the smart lock preventive maintenance checklist
This is where preventive versus corrective split portfolio planning becomes a control rather than a label. Each task should enter only one queue, although both queues may feed the same review meeting.
- Preventive lane: record the cohort, approved scope, owner, planned window, prerequisites, completion evidence, and exception route.
- Corrective lane: record the fault reference, report time, acknowledgement, attendance, diagnosis, corrective action, and operable-again time.
- Link each queue item to the relevant door or unit identifier.
- Prevent one task from appearing in both queues unless the relationship is explained.
- Do not convert a corrective repair into preventive work without evidence that the underlying cause was controlled.
- Carry an unresolved preventive task into the next portfolio review rather than silently dropping it.
flowchart TD
A["Set the portfolio boundary"] --> B["Classify each proposed action"]
B --> C{"Preventive or corrective?"}
C -->|Preventive| D["Preventive queue"]
C -->|Corrective| E["Corrective queue"]
D --> F["Complete refresh gate"]
E --> G["Resolve and document fault"]
F --> H["Review portfolio evidence"]
G --> H
Require one evidence packet at every refresh gate
A task is complete only when its record can explain what happened and what was ruled out.
- Door or unit identifier, model, and variant from the label or catalogue row, supported by the dated product page for the specific SKU.
- Date and time the fault was reported and date and time the door was operable again, where a fault exists.
- Symptom in the technician’s words, followed by the measured observation.
- Checks performed in order and a record of what each check ruled out.
- Parts fitted or unit swapped, with the removed unit retained under the buyer’s disposition process.
- Credential state before and after the intervention, where credentials were involved.
- Photograph, reading, or other supporting output used to reach the conclusion.
- Confirmation that any SKU-dependent procedure matches the dated product page before the technician starts work.
Control the corrective queue without blocking preventive work
Treat response time, on-site attendance time, and resolution time as separate intervals. Calculate MTTR only across a defined population and period; it does not reveal unreported doors or the tail of unresolved cases.
- Record the report through the agreed channel and capture acknowledgement separately from attendance.
- Follow the Preventive vs Corrective Split Triage: The Branch to Follow First to order checks at the door.
- Use the Escalation Path for Preventive vs Corrective Split when ownership, severity, or missing evidence prevents a normal close.
- Move a proposed preventive control into the preventive queue only after its cause-and-effect relationship has been validated.
- Keep the fault escalation path visible in the corrective record, including every handoff and the reason for escalation.
Compare release decisions across the two lanes
A task should not be released merely because its scheduled date has arrived. Compare the evidence against the lane’s purpose.
| Decision point | Preventive release test | Corrective release test | Portfolio action when evidence is incomplete |
|---|---|---|---|
| Work authorization | Scope matches an approved refresh criterion | Fault is recorded and the response route is assigned | Hold the task and identify the missing owner or record |
| Field completion | Required inspection or change evidence is attached | Door-operability record and corrective evidence are attached | Keep the item open and prevent it from entering the completed baseline |
| Cause-control decision | Control is linked to a documented risk | Root-cause evidence justifies moving work into the preventive lane | Retain the action in its original lane pending validation |
| Portfolio review | Trend against the frozen population is available | Fault pattern and closure evidence are available | Revise the population record and explain the change |
Use the Measuring Preventive vs Corrective Split: What to Record to align both lanes with the same population and record structure.
Close the tearoff with owner sign-off and controlled exceptions
The portfolio owner should sign the classification, not merely the purchase schedule. The corrective owner should sign each return-to-service record, while the preventive owner signs completion against the approved criterion.
- Match every completed record to the frozen portfolio population.
- List incomplete, deferred, and cancelled tasks with a named decision owner.
- Confirm that each exception has a reason, evidence, and next review point.
- Attach the current tearoff to the installed lock lifecycle plan and relevant work orders.
- Use the Preventive vs Corrective Split: From One Site to Twenty when one cohort’s pattern must be reviewed across the wider portfolio.
Before approval, check site-specific obligations.CONFIRM-WITH-LOCAL-AUTHORITIES: Confirm which access-control, fire-door, occupancy, and insurer requirements apply to the selected doors and service tasks before the plan is approved.
Once the requirement is written down, request a quote is the move.